Troll videreutvikling Industriutvikling på norsk sokkel Stordkonferansen, 13.06.2007

Troll videreutvikling Industriutvikling på norsk sokkel Stordkonferansen, 13.06.2007. Økt gasseksport Troll. Økt fleksibilitet i transportsystemet. Industriutvikling i Norskehavet. Økt oljeutvinning Troll. Bakgrunn. Troll videreutvikling. Troll Vest Oljeprovins. Troll Øst. 60°45’.

milos
Download Presentation

Troll videreutvikling Industriutvikling på norsk sokkel Stordkonferansen, 13.06.2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Troll videreutvikling Industriutvikling på norsk sokkel Stordkonferansen, 13.06.2007

  2. Økt gasseksport Troll Økt fleksibilitet i transportsystemet Industriutvikling i Norskehavet Økt oljeutvinning Troll Bakgrunn Troll videreutvikling

  3. Troll Vest Oljeprovins Troll Øst 60°45’ Troll Vest Gassprovins 3°40’ Formålet med Troll videreutvikling • Formålet med prosjektet er å anbefale en ny utviklings- og produksjonsstrategi for både olje og gass på Troll feltet • Plan for utbygging og produksjon (PUD) vil beskrive de anbefalte investeringene i ny gasseksport kapasitet fra Troll Øst, og gass og vanninjeksjon i Troll Vest • Forståelse av IOR potensialet er en forutsetning for å vurdere tidlig gassuttak i forhold til langsiktig oljeproduksjon • Troll Fase 3 er ikke en del av Troll videreutvikling

  4. Undergrunnsforståelse er nøkkelen til suksess

  5. Økt gasseksport fra Troll Troll C Troll B Gass injeksjon Kollsnes P12 Nytt rør til kontinentet eller Storbritannia

  6. Tildelt 2005 - 2007 Tildeles 2007 - 2008 Kontrakter • EPC Living Quarters Extension - Leirvik Module Technology • Extended studies Troll A – Aibel • Kollsnes Flash Gas and Condensate system – Aibel • Pre-eng. Kollsnes Gas Network Expansion – Linde • Pre-eng. Electric Drive System – ABB AT • Heavy lifting of modules offshore in 2008 and 2009 – Saipem • EPC Kollsnes Gas Network Expansion – sommer 2008 • EPCH(1) Living Quarters Extension integration and preparatory work –sommer 2007 • EPCH(2) 3. and 4. Compressor module Troll A – sommer 2008 • EPC Electric Drive System – sommer 2008 • Heavy lifting of compressor and EDS modules in 2010 – sommer 2008 • EPC Well intervention rig – sommer 2008 • Well intervention rig operations – sommer 2008

  7. ~ 100 nye brønner påkrevd Mange delbeslutninger utover i tid Liten innvirkning av økt gassuttak Økt oljeutvinning fra Troll Troll oljeproduksjon Akkumulert MSm3 IOR ambisjon Opprinnelig produksjonsmål

  8. Troll olje IOR tiltak vil kunne øke utvinnbare oljereserver fra 240 MSm3/1500 M fat (RNB) til minst 300M Sm3/2000 M fat, og utvinningsgraden fra 37% til knapt 50%

  9. HNO Åsgard Transport Industriutvikling på norsk sokkel Snøhvit Melkøya HNO/Norskehavet Tjeldbergodden Tampen og Troll-Sleipner Nyhamna Kollsnes Kårstø St. Fergus Easington Emden Den Helder Zeebrugge Dunkerque

  10. Økt fleksibilitet i transportsystemet

  11. Oppsummering • Som historien til Troll, er også dette et kontroversielt prosjekt • Troll videreutvikling gir et godt fundament for å • Øke gassproduksjon og inntekter • Forsterke infrastruktur i form av rør og prosessanlegg • Forsterke innsatsen for økt oljeutvinning gjennom gass- og vanninjeksjon og mange brønner • Legge til rette for langsiktig utvikling av reserver og felt nordover Mulighetsvinduet er nå! Bruker vi dette får vi maksimal verdiskaping av olje og gassreservene i Troll feltet