Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa

Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel. Introduction Final Design Received Parts Pending Parts Fabrication Raw Materials Updated Cost Analysis Remaining Timeline. Overview. Introduction. Project Scope

mikel
Download Presentation

Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel

  2. Introduction Final Design Received Parts Pending Parts Fabrication Raw Materials Updated Cost Analysis Remaining Timeline Overview

  3. Introduction • Project Scope • Research Robot • All-terrain capabilities • Accommodates Sensors and Hardware • Front and Rear Ackerman Steering • Client • CISCOR • Dr. Emmanuel Collins

  4. Final Design • Motors Parallel to Frame • Right Angle Gear Heads • Telescoping Drive Shafts • Batteries Around Frame • Controllers in Rear

  5. Received Parts Frame Anaheim Automation

  6. Pending Part 8” Steering Rack • Desert Karts could not supply order • 3 Week Delay as Result • Dans Performance Parts • Price: $86 per unit

  7. Fabrication Issues • Shimansky Quote $6200 • Tallahassee Machining and Welding unresponsive • The Shop Parts & Things Provided Feedback • Redo Material Selection • Drawing Packet Critique

  8. Fabrication Resolution • Raw Materials from McMaster Carr • Machining at Physics Machine Shop • Frame Fabrication at Jackson Cook • Miscellaneous Fab. Done by group at COE • Sheet Metal Bending • Assembly

  9. Raw Materials Ordered • Stress Proof (1144) Steel Rod • Assorted Aluminum Rod Stock • Assorted Aluminum Plate Stock • 18 Gauge Stainless Steel Steet Metal • Steel Tube (Alloy 4130) • Assorted Steel (1018)

  10. Grainger $64.31 Anaheim Automation $2181.60 McMaster Carr $420.32 Northern Tool $83.92 Stock Drive Products $793.76 Mulvanneys $36.00 Jackson Cook $376.60 Dan’s Performance Parts $202.00 McMaster Carr Raw Materials $903.18 Physics Shop Fabrication Pending Lowes $100.00 (est) Total Spent: $5161.69 Updated Cost Analysis

  11. 3/16 Receive Manufactured Parts Begin Assembly Stage 3/23 Complete Assembly Turn Over to CISCOR Wiring and Programming 3/30 Receive From CISCOR 4/6 Complete Testing Focused on Mechanical systems functioning properly 4/9 Final Report and Operation Manual Complete 4/16 Open House Remaining Timeline

  12. Donald Hollett CISCOR Dr. Emmanuel Collins Dr. Oscar Chuy Damion Dunlap Senior Design T.A.’s (per their request) Acknowledgements

  13. Questions?