Proposed conceptual Cameroon gas development scheme. Paul NGII NAG Head of Gas Department, SNH. Outline. Cameroon objectives Cameroon gas reserves Cameroon gas master plan Rio del rey scheme 1 Rio del rey scheme 2 Greater gas development: sheme 3 Snh conceptual scheme Conclusion.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Proposed conceptual Cameroon gas ' - mike_john


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Proposed conceptual cameroon gas development scheme l.jpg

Proposed conceptual Cameroon gas development scheme

Paul NGII NAG

Head of Gas Department, SNH


Outline l.jpg
Outline

  • Cameroon objectives

  • Cameroon gas reserves

  • Cameroon gas master plan

    • Rio del rey scheme 1

    • Rio del rey scheme 2

  • Greater gas development: sheme 3

  • Snh conceptual scheme

  • Conclusion


Cameroon objectives l.jpg
CAMEROON OBJECTIVES

Cameroon objectives are:

  • Domestic gas market supply

  • Lpg and condensate supply to local market and export of excess

  • Export of dry gas to eg lng train 2


Cameroon gas reserves l.jpg

Cameroon is unexploited in term of gas

Non associated gas 5,5 Tcf (156 billion m3)

Associated gas 0.035 TCF (1 billion m 3)

Non risk exploration about 20 Tcf (570 billion m3)

CAMEROON GAS RESERVES


Cameroon gas master plan l.jpg
CAMEROON GAS MASTER PLAN

Following the gas master plan, three main development cases were studied

  • RDR scheme 1

    • This development scheme comprised the kita, edem and ekoundou fields

  • RDR scheme 2

    • This case consisted of developing the non-associated gas and associated gas in the wider kita area and also the northern fields

  • Greater gas development : scheme 3

    • This case consisted of developing all discoved gas fields in cameroon that were perceived to be economically developable


Scheme 1 l.jpg
SCHEME 1

Kita

(Kita Gas)

Key

New Wellhead Platform

65 MMSCFD

Refurb

. Wellhead Platform

18

Pipeline

478

Numbers show sales gas

flowrate

in

MMscfd

Onshore Plant

(100

MMscfd

Sales Gas

1,000 bpd Condensate)

Bioko

Island


Production forecast for scheme 1 l.jpg
PRODUCTION FORECAST FOR SCHEME 1

PATRIMONIAL GAZ RDR KITA/EDEM + EKUNDU

70

60

50

40

Ekundu

Edem

DCQ (MMscf/f)

Kita 1

Kita 2

30

20

10

0

année1

année2

anneé3

année4

année5

année6

année7

année8

année9

année10

année11

année12

année13

année14

année15

année16

année17

année18

année19

année20

année21

année22

année23

année24

année25

année26

année27

année28

année29

année30


Production forecast for scheme 1 development based on p90 volumes l.jpg
PRODUCTION FORECAST FOR SCHEME 1 DEVELOPMENT BASED ON P90 VOLUMES

PATRIMONIAL GAZ RDR - KITA/EDEM + EKUNDU

40

35

30

25

Ekundu

Edem

DCQ (MMscf/d)

20

Kita 1

Kita 2

15

10

5

0

année1

année2

anneé3

année4

année5

année6

année7

année8

année9

année10

année11

année12

année13

année14

année15

année16

année17

année18

année19

année20

année21

année22

année23

année24

année25

année26

année27

année28

année29

année30


Scheme 2 l.jpg

Jabane

/

Ifiari

Afaga

Edem

Kita

Key

100 MMSCFD

New Wellhead Platform

18

Pipeline

Refurb

. Wellhead Platform

478

Numbers show sales gas

flowrate

in

MMscfd

Ons

hore Plant

(100

MMscfd

Sales Gas

1,000 bpd Condensate)

Bioko

Island

SCHEME 2

Ekundu


Production forecast for scheme 2 l.jpg
PRODUCTION FORECAST FOR SCHEME 2

DCQ P50 (COMPRESSION IN YEAR 5 READY)

120

100

Jabane DCQ

80

Ifari DCQ

Afaga DCQ

Edem DCQ

60

MMscf/d

EK Shallow DCQ

EK Deep DCQ

Kita Shallow swing DCQ

40

Kita Deep DCQ

20

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21


Greater gas development l.jpg

Jabane

Jabane

Jabane

Jabane

Jabane

Jabane

/

/

/

/

/

/

Ifia

Ifiari

Ifiari

Ifiari

Ifiari

Ifiari

ri

ri

(144)

(144)

(144)

(144)

(144)

(144)

260

260

260

260

260

MMscfd

MMscfd

MMscfd

MMscfd

MMscfd

144

144

144

144

144

1

44

Afaga

Afaga

Afaga

Afaga

Afaga

Afaga

Afaga

(128)

(128)

(128)

(128)

(128)

(128)

131

131

131

131

131

131

Narendi

Narendi/Idabato

Narendi

Narendi

Narendi

Narendi

Narendi

/

/

/

/

/

/

Idaboto

Idaboto

Idaboto

Idaboto

Idaboto

Idaboto

Case

Case

Case

Case

Case

-

-

-

-

-

Greater

Greater

Greater

Greater

Greater

131

131

131

131

131

131

(131)

(131)

(131

(131)

(131)

(131)

)

151

151

151

151

151

151

Edem

Edem

Edem

Edem

Edem

Edem

Edem

Kita

Kita

Kita

Kita

Kita

Kita

Kita

(32)

(32)

(32)

(32)

(32)

(32)

Gas Dev.

Cameroon Gas

Cameroon Gas

Cameroon Gas

Cameroon Gas

(114 Kita

(114 Kita Gas

(114 Kita Gas

(114 Kita Gas

(114 Kita Gas

(11

4 Kita Gas

Gas

314 Design)

314 Design)

314 Design)

314 Design)

314 Design)

314 Design)

76

76

76

76

76

76

Ekundu

Ekundu

Ekundu

Ekundu

Ekundu

Ekundu

Nth

Nth

Nt

Nth

Nth

Nth

Nt

h

h

(56)

(56

(56)

(56)

(56)

(56)

)

314

314

314

314

314

314

314

20

20

20

20

20

20

Ekundu Sth

Ekundu Sth

Ekundu Sth

Ekundu Sth

Ekundu Sth

Ekundu Sth

Ekundu Sth

(20)

(20)

(20)

(20)

(20)

(20)

Sanaga Sud

Sonaga Sud

Sonaga Sud

Sonaga Sud

Sanaga Sud

Sonaga Sud

Sonaga Sud

(234

(234

(234

(234

(234

(234

(234

Sonaga Sud

Sonaga Sud

Sonaga Sud

Sonaga Sud

Sonaga

Sonaga Sud

Sonaga Sud

Sud

Gas

Gas

Gas

Gas

Gas

Gas

Gas

260

260

260

260

2

260

260

60

Key

Key

Key

Key

Key

Key

Key

260 Design)

260 Design)

260 Design)

260 Design)

260 Design)

260 Design)

260 Design)

164

164

164

164

164

164

Wellhead Platform

Wellhead Platform

Wellhead Platform

Wellhead Platform

Wellhead Platform

Wellhe

Wellhead Platform

ad Platform

76

76

76

76

76

76

Onshore Plant

Onshore Plant

Onshore Plant

Onsho

Onshore Plant

Onshore Plant

Onshore Plant

re Plant

Production Platform

Production Platform

Production Platform

Production Platform

Production Platform

Production Platform

Production Platform

Kribe

Kribe

Kribe

Kribe

Kribe

Kribe

L

L

L

L

L

L

L

Kribi

Kribi

Kribi

Kribi

Kribi

Kribi

B

B

B

B

B

B

B

(88)

(88)

(88)

(88)

(88)

(88)

(314

(314

(314

(314

(314

(314

(314

MMscfd

MMscfd

MMscfd

MMscfd

MMscfd

MMscfd

MMscfd

Raw G

Raw Gas

Raw Gas

Raw Gas

Raw Gas

Raw Gas

Raw Gas

as

(76)

(76)

(76)

(76)

(76)

(76)

478

478

478

478

478

478

478

Numbers show raw gas

Numbers show raw gas

Numbers show raw gas

Numbers sho

Numbers show raw gas

Numbers show raw gas

Numbers show raw ga

w raw gas

s

3,000 bpd Condensate)

3,000 bpd Condensate)

3,000 bpd Condensate)

3,000 bp

3,000 bpd Condensate)

3,000 bpd Condensate)

3,

000 bpd Condensate)

d Condensate)

flowrate

flowrate

flowrate

flowrate

flowrate

flowrate

flowrate

in

in

in

in

in

in

in

MMscfd

MMscfd

MMscfd

MMscfd

MMscfd

MMscfd

MMscfd

Bioko

Bioko

Bioko

Bioko

Bioko

Bioko

Bioko

Island

Island

Island

Island

Island

Island

Island

GREATER GAS DEVELOPMENT

Jabane/Ifiari

Ekundu Nth

Kribi L

Kribi B


Production forecast for scheme 3 greater gas development l.jpg
PRODUCTION FORECAST FOR SCHEME 3 GREATER GAS DEVELOPMENT

350

300

South Douala Sanaga Sud

250

South Douala Kribi L

South Douala Kribi B

Northern Narendi

200

Nothern Ifiari

Nothern Idabato

Nothern Jabane East

150

Nothern Afaga West

Kita Ekoundou Kita Shallow

Kita Ekoundou Kita Deep

100

Kita Ekoundou EkoundouNorth Shallow

Kita Ekoundou Ekoundou North Deep

Kita Ekoundou Ekoundou Centre

Shallow

50

Kita Ekoundou Ekoundou Centre Deep

Kita Ekoundou Edem

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

Years


Snh conceptual scheme l.jpg
SNH CONCEPTUAL SCHEME

  • SONARA

  • Centrale thermique de Limbé

Jabane/Ifiari

Gaz sec

Narendi/Idaboto

Afaga

GPL

130000T/year up to 330 000 T/year

Edem

HUB

Kita

(140 km)

Condensats

(3 300 bbb/j up to 4600 bbl/day)

(20 km)

Ekundu Nth

Isongo

(GNL au Cameroun)

ou

Export envisageable

Ekundu Sth

(50 km)

(140 km)

100

300

Key

Centrale thermique

de Kribi

Usine de GNL

Onshore

Plate-formes puits

Ile de Bioko

40

Plate-formes production

Sanaga Sud

(234 Sanaga Sud Gas

260 Design)

478

Débit de gaz en MMSPC/J

(140 km)

Distance en kilomètre

Kribi B)

Kribi L


Conclusion l.jpg
CONCLUSION

  • A LARGE INTEGRATED GAS EXPORT DEVELOPMENT WOULD PROVIDE THE BEST LONG-TERM PLATFORM FOR GAS COMMERCIALISATION FOR THE COUNTRY AND FOR DELIVERY OF COST-COMPETITIVE GAS POWER GENERATION IN CAMEROON.

  • ANY GAS DEVELOPMENT, EVEN SMALL, DECIDED BEFORE A BETTER UNDERSTANDING OF VOLUMES HAD BEEN DEVELOPED COULD ERODE THE LIKELIHOOD OF LARGE-SCALE DEVELOPMENT SEEKING TO MAXIMISE THE UTILIZATION OF CAMEROON’S GAS RESOURCE OVER A PERIOD OF 20-30 YEARS.


Conclusion15 l.jpg
CONCLUSION

  • DUE TO THE INSUFFISANT PRODUCTION OF LPG WITHIN THE COUNTRY, THE BEST SCHEME IS THE GREATER ONE WITH LIQUID RECOVERY IN CAMEROON AND LEAN GAS SENT TO EG LNG AT PUNTA EUROPA IN BIOKO ISLAND.

  • TO PROGRESS A SUCCESSFUL CAMEROON COMMERCIALISATION SCHEME, SUBTENTIAL ADDITIONAL VOLUMES WOULD NEED TO BE MATURED AS SOON AS POSSIBLE THROUTH DEDICATED GAS EXPLORATION AND APPRAISAL ACTIVITIES.