Acadiana Planning Update

ICT Transmission Summit July 31 st , 2007. Acadiana Planning Update. Overview. Acadiana Load Pocket currently dependent on generation from LUS and CLECO in order to mitigate transmission constraints. System historically planned assuming generation running

mikaia
Download Presentation

Acadiana Planning Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICT Transmission Summit July 31st, 2007 Acadiana Planning Update

  2. Overview • Acadiana Load Pocket currently dependent on generation from LUS and CLECO in order to mitigate transmission constraints. • System historically planned assuming generation running • ICT proposes that the Acadiana Load Pocket be planned to be secure for the loss of a line AND a generator (N-1-1) • Draft plan presented to Entergy, LUS, CLECO, and LEPA on March 2nd, 2007

  3. Acadiana Import Limit • CLECO proposed a methodology to redispatch CLECO and LUS generation based on an import limit for each entity. • CLECO and LUS generation would redispatch to relieve loading on Scott-Bonin prior to going to a TLR Level 5 • Discussions on redispatch agreement are currently ongoing

  4. Proposed Transmission Expansion Plan • 230 kV • Webre – Cecelia (27 mi) • Webre 500/230 kV transformer • Wells – Cecelia (22 mi) • Cecelia – Moril (24 mi) • Cecelia 230/138 kV transformer • Moril 230/138 kV transformer • 138 kV • Upgrade Cecelia – Bonin (14 mi) • Upgrade Cecelia – Moril (24 mi) • Upgrade Moril – Duboin (4.5 mi) • Moril – Leblanc (9 mi) • Capacitor bank at Meaux • Capacitor bank at Leblanc Estimated cost: $110M

  5. Proposed Transmission Expansion Plan 500/230 kV auto at Webre 230 kV Wells - Cecelia 230 kV Webre - Cecelia 230 kV Cecelia - Moril Upgrade 138 kV Cecelia - Bonin Upgrade 138 kV Cecelia - Moril Upgrade 138 kV Moril - Duboin 138 kV Moril - Leblanc

  6. Next Steps • Plan has been submitted to LUS, CLECO, Entergy, LEPA for review • Review additional alternatives • Economic studies to determine cost benefit of upgrades • ICT Report to be published by September 1st, 2007