watermain rehabilitation eliminating the need for temporary bypass
Download
Skip this Video
Download Presentation
Watermain Rehabilitation Eliminating the need for temporary bypass

Loading in 2 Seconds...

play fullscreen
1 / 25

Watermain Rehabilitation Eliminating the need for temporary bypass - PowerPoint PPT Presentation


  • 107 Views
  • Uploaded on

Watermain Rehabilitation Eliminating the need for temporary bypass. Derrick Horsman, P.Eng. Alltech Solutions INC. Overview. Watermain problems and issues Spray Lining Overview Same Day Return to Service ?. Eliminating Temporary Bypass. The Problem:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Watermain Rehabilitation Eliminating the need for temporary bypass' - merrill-newman


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
watermain rehabilitation eliminating the need for temporary bypass
Watermain RehabilitationEliminating the need for temporary bypass

Derrick Horsman, P.Eng.

Alltech Solutions INC

overview
Overview
  • Watermain problems and issues
  • Spray Lining Overview
  • Same Day Return to Service ?

Eliminating Temporary Bypass

slide3

The Problem:

Despite recent increases in public infrastructure investments, municipal infrastructure is decaying faster than it is being renewed.1

1 National Guide to Sustainable Municipal Infrastructure.

Eliminating Temporary Bypass

slide4

The Cause:

Internal (External) corrosion

Watermain breaks

Pipe surpassed useful life

Eliminating Temporary Bypass

slide5

High Rate of Leakage

Inadequate Fire Protection

Eliminating Temporary Bypass

slide8

What do we do?

Eliminating Temporary Bypass

slide9

Conventional open cut replacement

  • Low dig options
    • Directional drilling
    • Sliplining
    • Pipebursting
    • CIPP lining
  • Traditional Cleaning and Spray Lining
    • Cement lining process
    • Epoxy lining process
  • Modern Cleaning and Spray Lining
    • Rapid cure polyurethane system
    • Rapid cure high build system

Eliminating Temporary Bypass

slide10

Spray Lining

  • TRADITIONAL CLEANING AND SPRAY LINING
  • Cement Lining process
  • Epoxy Lining process
    • Less expensive
    • No reduction in flow capacity
    • No requirement to re-tap services
    • Some disruption
    • Not suitable for certain water types
    • Superseded in Europe by polyurethane lining systems.
    • Requires above ground temporary water supply $$$$$$$ ??

Eliminating Temporary Bypass

slide11

Spray Lining

TRADITIONAL CLEANING AND CEMENT LINING

Eliminating Temporary Bypass

slide14

Spray Lining

MODERN CLEANING AND SPRAY LINING

Rapid Cure Polyurethane system

Rapid Cure High Build system

Eliminating Temporary Bypass

slide15

Spray Lining

  • MODERN CLEANING AND SPRAY LINING
  • Rapid Cure Polyurethane system
  • Rapid Cure High Build system
    • Same day return to service
      • Only approved rapid cure material <15 sec
      • Potential for contamination effectively eliminated
      • No leaching
      • Immediate rectification of lining faults

Eliminating Temporary Bypass

slide16

Spray Lining

  • MODERN CLEANING AND SPRAY LINING
  • Rapid Cure Polyurethane system
  • Rapid Cure High Build system
    • Same day return to service
    • No requirement for above ground bypass
      • Improved customer services; multi-stage notification process
      • Operations carried out during working hours
      • Removes potential hazards (ie. Tripping hazards, random breaks, security issues)

Eliminating Temporary Bypass

slide17

Spray Lining

  • MODERN CLEANING AND SPRAY LINING
  • Rapid Cure Polyurethane system
  • Rapid Cure High Build system
    • Same day return to service
    • No requirement for above ground bypass
    • Substantially less expensive
    • - cost of bypass 20-45% of total job (Awwarf)
      • Cost of temporary resources reduced
      • Shorter construction duration

Eliminating Temporary Bypass

slide18

Spray Lining

  • MODERN CLEANING AND SPRAY LINING
  • Rapid Cure Polyurethane system
  • Rapid Cure High Build system
    • Same day return to service
    • No requirement for above ground bypass
    • Substantially less expensive
    • Greatly reduced disruption
      • Minimal setup time
      • Rapid road reinstatement
      • Small job site footprint

Eliminating Temporary Bypass

slide19

Spray Lining

Eliminating Temporary Bypass

slide20

Spray Lining

  • MODERN CLEANING AND SPRAY LINING
  • Rapid Cure Polyurethane system
  • Rapid Cure High Build system
    • Same day return to service
    • No requirement for above ground bypass
    • Substantially less expensive
    • Greatly reduced disruption
    • Some revaluation of capital asset?
    • No reduction in flow capacity
      • Application of 1mm – 5mm

Eliminating Temporary Bypass

slide21

Spray Lining

  • MODERN CLEANING AND SPRAY LINING
  • Rapid Cure Polyurethane system
  • Rapid Cure High Build system
    • Same day return to service
    • No requirement for above ground bypass
    • Substantially less expensive
    • Greatly reduced disruption
    • Some revaluation of capital asset?
    • No reduction in flow capacity
    • No requirement to re-tap services

Eliminating Temporary Bypass

slide22

Spray Lining High Build Structural System

Performance Requirements for Lining Material

  • Tough enough to survive dynamic loading at failure
  • Ductile enough to accommodate movement after failure
  • Sufficient shear strength to maintain longitudinal continuity
  • Sufficient flexural strength to provide long term corrosion void spanning capability

Eliminating Temporary Bypass

slide23

Spray Lining High Build Structural System

1 Bar = 14.5 psi

@3mm 145psi

@5mm 348 psi

Eliminating Temporary Bypass

slide24

Spray Lining – Rapid Cure Polyurethane

  • Rapid Cure Polyurethane North American Experience
    • City of Saint John, NB
    • City of Moncton, NB
    • Atlantic Health Sciences Corporation, Saint John, NB
    • Millstone Nuclear Power Plant, Niantic, CT, USA
    • Region of Niagara, ON
    • New York Department of Environmental Protection
  • Rapid Cure Polyurethane International Experience
    • United Kingdom, Russia, India, Switzerland and Malaysia
    • More than 8,000 km in the UK by our partner affiliates

Eliminating Temporary Bypass

slide25

QUESTIONS ???

Eliminating Temporary Bypass

ad