DVBE BEST PRACTICES. Thomas J. Johnson, C.P.M. [email protected] March 22, 2006. DVBE GOAL. 3%. DIFFICULT GOAL MANY PLACES TO STUMBLE. Large Construction Contracts System Wide Contracts MEAs Contracts with large Suppliers such as Dell & HP Commodities without DVBEs

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'DVBE BEST PRACTICES' - merle


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Dvbe best practices l.jpg

DVBE BEST PRACTICES

Thomas J. Johnson, C.P.M.

[email protected]

March 22, 2006



Difficult goal many places to stumble l.jpg
DIFFICULT GOALMANY PLACES TO STUMBLE

  • Large Construction Contracts

  • System Wide Contracts

  • MEAs

  • Contracts with large Suppliers such as Dell & HP

  • Commodities without DVBEs

  • Laws do not help much

  • Workload

  • Priorities-expedite


What do we do l.jpg
What do we do?

  • 1) Change “have” to “get”

  • 2) Outreach

  • 3) Relationship/Networking

  • 4) Use the laws

  • 5) Strategy

  • 6) Continuous Improvement—Feedback

  • 7) Make it easy for DVBE

  • 8) Team CSU


Change have to get l.jpg
Change “have” to “get”

  • This is an opportunity

  • Win-Win: CSU meets goals; Suppliers are developed


Outreach l.jpg
Outreach

  • DVBEs are small businesses.

  • Promoted by state

  • 1) Need to locate DVBEs

  • 2) Determine their skills & products

  • 3) Develop them as CSU suppliers


Relationships l.jpg
Relationships

  • System tends to discourage relationships

  • Develop relationships. Use knowledge of suppliers in creating strategy

  • Also, DVBEs are well organized—great networking opportunity

  • Use DVBEs as resources to find and develop other DVBEs


Use the laws l.jpg
Use the Laws

  • Everyone is familiar with 5% SB preference

  • SB115 adds a DVBE incentive of 15% up to $100,000

  • It may be possible to make 3% DVBE participation mandatory

  • It may be possible to set participation goal higher than 3% and mandatory


Strategy l.jpg
Strategy

  • Need to create a procurement strategy

  • Where will DVBE participation come from?

  • Construction?

  • Commodities?

  • Services?

  • In what percentages?


Continuous improvement l.jpg
Continuous Improvement

  • Look at strategy. Is it working?

  • Did you make goal?

  • Where did you succeed? Why?

  • Where did you miss? Why?

  • What adjustments are needed?

  • Review periodically and when starting new year


Make it easy for dvbe l.jpg
Make it Easy for DVBE

  • Our campuses are tough to crack

  • Need to open our doors to them

  • Help them to help us


Team csu l.jpg
Team CSU

  • My experience is that we’re fragmented

  • Share successful DVBEs with other campuses

  • Include commodities bought, contacts, experiences


Best practices l.jpg
Best Practices

  • Areas:

  • 1) Commodities/Services

  • 2) Public Works

  • 3) PCARD


Commodities services l.jpg
Commodities/Services

  • Opportunities:????

  • Computers

  • Hospitality

  • Peripherals

  • Office Supplies

  • Consultant Service—Peoplesoft

  • Paper Products

  • Janitorial


Target l.jpg
Target

  • Target commodities/services that offer best reward


Methods l.jpg
Methods

  • Award under $50,000 bid limit

  • Bid DVBE against DVBE

  • When unable to find DVBE, use DVBE flowdowns on Bids

  • Use DVBE as a minor partner on contracts such as Office Max—Also use off ramp


Public works l.jpg
Public Works

  • Public works is critical to DVBE results:

  • 1) Large Contracts without DVBE destroys any chances of meeting goals

  • 2) Large Contracts with excess DVBE can make your year

  • 3) Meet DVBE requirements on contract

    Must ensure meet either 2 or 3


Public works procedures advertisement l.jpg
Public Works ProceduresAdvertisement

  • Invite DVBEs to Job Walk; contact them personally—don’t trust the mail to convey you interest

  • Where to find them:

  • 1) Log of DVBEs from previous bids (DVBEs who have bid or are subs on bids—look at winners and losers)

  • 2) Review DGS for potential DVBEs


Public works procedures advertisement19 l.jpg
Public Works ProceduresAdvertisement

  • Advertise with DVBE Alliance

  • Contact Rich Dryden, 916 446-3510 or

  • www.CADVBE.org


Public works procedures walk through l.jpg
Public Works ProceduresWalk Through

  • Hand Out and Read DVBE Warning Letter


Public works procedures dvbe warning letter l.jpg
Public Works ProceduresDVBE Warning Letter

  • Disabled Veteran Business Enterprise (DVBE) Participation Requirement

  • Project TJ050088, Hydrogen Fueling Station Irrigation & Fencing Project

  • California State University, Los Angeles

  • 5151 State University Drive

  • Los Angeles, California 90032

  • VERY IMPORTANT NOTICE!

  • In order to satisfy and be responsive to the DVBE requirement, the bidders must either meet the three (3%) percent DVBE Participation Goal or document a “Good Faith Effort” to meet that goal.


Public works procedures dvbe warning letter22 l.jpg
Public Works Procedures DVBE Warning Letter

  • Disabled Veteran Business Enterprise (DVBE) Participation Requirement

  • Project TJ050088, Hydrogen Fueling Station Irrigation & Fencing Project

  • California State University, Los Angeles

  • 5151 State University Drive

  • Los Angeles, California 90032


Public works procedures dvbe warning letter23 l.jpg
Public Works Procedures DVBE Warning Letter

  • VERY IMPORTANT NOTICE!

  • In order to satisfy and be responsive to the DVBE requirement, the bidders must either meet the three (3%) percent DVBE Participation Goal or document a “Good Faith Effort” to meet that goal.

  • DVBE Participation Goal Attainment


Public works procedures dvbe warning letter24 l.jpg
Public Works Procedures DVBE Warning Letter

  • As an example, if the apparent low bidder bid the Architect’s construction estimate amount of $49,000.00 the firm could be responsive to the DVBE requirement by achieving the three (3%) percent DVBE Participation Goal with a minimum of $1,470.00 in DVBE subcontractor and/or supplier participation in the project.

  • Or


Public works procedures dvbe warning letter25 l.jpg
Public Works Procedures DVBE Warning Letter

  • Good Faith Effort

  • A “Good Faith Effort” to meet the DVBE goal is achieved by doing all of the following five items prior to the final bid due date. The bidder shall:

  • 1. Contact the Trustees’ DVBE Coordinator, telephone (323) 343-3488, to identify potential DVBEs. This telephone call will initiate the provision of information to the bidder;


Public works procedures dvbe warning letter26 l.jpg
Public Works Procedures DVBE Warning Letter

  • 2. Contact other state and federal government agencies and local DVBE organizations to identify potential DVBEs for this contract;

  • 3. Advertise in trade paper and papers focusing on DVBEs. Advertisement must have appeared in publications at least ten (10) calendar days prior to the bid due date, unless time limits imposed by the Trustees do not permit that advertising;


Public works procedures dvbe warning letter27 l.jpg
Public Works Procedures DVBE Warning Letter

  • 4. Send solicitation to potential DVBE subcontractors and suppliers for this contract with sufficient lead time to fully entertain and consider responding bids; and

  • 5. Consider responding DVBEs for participation in this contract.


Public works procedures walk through28 l.jpg
Public Works ProceduresWalk Through

Suggest Mandatory Walk throughs

Introduce DVBEs

Discuss costs to losers of using good faith

Use a DVBE: Avoid Protests, reduce costs

State that we have had great success with DVBE utilization and we will challenge any Good Faith effort


Public works procedures opportunities problems l.jpg
Public Works ProceduresOpportunities/Problems

  • Campus Architects

  • Design Build


Pcard l.jpg
PCARD

  • Flowdown DVBE requirements to campus when performing trainings

  • When auditing, when DVBE alternates are available, suggest to campus user


Summary l.jpg
SUMMARY

  • Excellent DVBE Results are possible when Campus has a plan and executes it

  • Commitment and belief in the program will yield results


Dvbe best practices32 l.jpg

DVBE BEST PRACTICES

Thomas J. Johnson, C.P.M.

[email protected]

March 22, 2006