CACT HZ21-1 Field Water Shut Off Application2003 Review - PowerPoint PPT Presentation


  • 177 Views
  • Uploaded on

Introduction. HZ 211 field is a Multi-layer oil and gas field in the northeast of CACT\'s Block 16/08. The field was discovered in 1985 and started production Sep 1990. It was the first field on production in the Pearl River Mouth Basin. As at Oct 2003, cumulative reached to 52.8 MM or 37.2% of an es

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'CACT HZ21-1 Field Water Shut Off Application2003 Review' - merle


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
ad