첨부 1. 점검 GR 보고서. 품질 · 생산성 향상을 위한. 공정개선 점검 결과 - 메탈다인. 목 차. Ⅰ . 점검 개요 Ⅱ . 공장 혁신 계획 종합 Ⅲ . 공정개선 CHK SHEET Ⅳ . 품질개선 CHK SHEET. 2011. 10. 27. 공정 개선 TFT. Ⅰ. 점검개요 – 메탈다인. 경기도 평택시 청북면 어연리 893 번지. R-eng BSM. 공장동. Soccer field. Expansion In 2009. Theta BSM 2 라인. Tau FEMA.

Download Presentation

공정개선 점검 결과 - 메탈다인

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 첨부1. 점검 GR 보고서 품질·생산성 향상을 위한 공정개선 점검 결과-메탈다인 목 차 Ⅰ. 점검 개요 Ⅱ. 공장 혁신 계획 종합 Ⅲ. 공정개선 CHK SHEET Ⅳ. 품질개선 CHK SHEET 2011. 10. 27 공정 개선 TFT

  2. Ⅰ.점검개요 – 메탈다인 경기도 평택시 청북면 어연리 893번지 R-eng BSM 공장동 Soccer field Expansion In 2009 Theta BSM 2라인 Tau FEMA Theta BSM 1라인

  3. Ⅱ. 공장 혁신 계획 종합 - 공장명 4억 28.6% 14000 PPM 27.1% 27.1% +1.5% 109명 -4000PPM 108명 108명 -1명 10000PPM 1억 0.15억 ▣공정 개선 계획 (총 5건)

  4. 260 270 145 40 330 70 325 80 100 320 110 120 130 140 150 90 160 210 220 230 240 250 검사 280 170 180 190 200 310 300 290 조립 프로세스 (210~280) (320~330) 검사 프로세스 (290~310) (검사) 가공 프로세스 (40~200) 1명 1명 1명 1명 1명 1명 1명 1명 1명 1명 1명 1명 1명 1명

  5. M15-1 M15-2 M35 M20 M30 M45 M10 M50 M40 M60 A50 A30 A20 A15 A90 A80 A70 A60 A10 A40 T120 BS20 T100 BS10 T130 BS30 검사 T150 T110 A140 검사 프로세스 (T100~T130) (T150,검사) 가공 프로세스 (M10~M60) (BS10~BS30) 조립 프로세스 (A10~A90) 1명 2명 1명 1명 1명 1명 1명 1명 1명 1명 1명 1명 1명

  6. 10 20 30 60 70 40 50 검사 50-1 조립 프로세스 (40~60) 검사 프로세스 (30,70, 검사) 가공 프로세스 (10~20) 1명 1명