1 / 16

Right-of-Way Cost Estimating Planning Tool Training Guide

Right-of-Way Cost Estimating Planning Tool Training Guide. TxDOT Implementation Project 5-4079-01 Project Coordinator: John Campbell Project Director: Gus Cannon UT CTR Team: Dr. Kara Kockelman (RS), Dr. Carlos Caldas,

mele
Download Presentation

Right-of-Way Cost Estimating Planning Tool Training Guide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Right-of-Way Cost Estimating Planning Tool Training Guide TxDOT Implementation Project 5-4079-01 Project Coordinator: John Campbell Project Director: Gus Cannon UT CTR Team: Dr. Kara Kockelman (RS), Dr. Carlos Caldas, Dr. Zhanmin Zhang, Lu Gao, and Raquel Escatel

  2. Using the tool

  3. Logging On

  4. Previous Page

  5. Retrieve this Estimate

  6. New Estimate

  7. Entering Project Details

  8. Entering Project Details (cont’d)

  9. Entering Parcel Characteristics

  10. Entering Parcel Characteristics (cont’d)

  11. Waiting Page

  12. Estimated Costs

  13. Results of “Print Report”

  14. Results of “Print Parcel Information”

  15. Delete Estimate

  16. Any Questions?

More Related