Itu t study group 15 communications to ietf ccamp working group
This presentation is the property of its rightful owner.
Sponsored Links
1 / 8

ITU-T Study Group 15 Communications to IETF CCAMP Working Group PowerPoint PPT Presentation


  • 92 Views
  • Uploaded on
  • Presentation posted in: General

ITU-T Study Group 15 Communications to IETF CCAMP Working Group. Wesam Alanqar ITU-T SG15 Representative to IETF CCAMP [email protected] ITU-T Q14/15 – Optical Control Plane. Management Framework. Discovery Architecture. G.fame. G.disc_arch. Auto- discovery.

Download Presentation

ITU-T Study Group 15 Communications to IETF CCAMP Working Group

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Itu t study group 15 communications to ietf ccamp working group

ITU-T Study Group 15 Communications toIETF CCAMP Working Group

Wesam Alanqar

ITU-T SG15 Representative to IETF CCAMP

[email protected]


Itu t study group 15 communications to ietf ccamp working group

ITU-T Q14/15 – Optical Control Plane

Management

Framework

Discovery

Architecture

G.fame

G.disc_arch

Auto-

discovery

Initialization

& Recovery

Signaling

Routing

DCN/SCN

G.7716

G.7714

Protocol Neutral Requirements

(Detailed)

G.7713

G.7715

G.7712

G.7715.1

G.7713.1

Protocol

Specifications

G.7714.1

G.7713.2

G.7713.3

ITU-T SG 15, Question 14

ASON Control & Management Recommendations


Location of relevant information

Location of Relevant Information

  • The consented text for New Recommendations G.7715.1 and living lists for G.7714.1 and G.7713 can be obtained from:

    • ftp://sg15opticalt:[email protected]/tsg15opticaltransport/COMMUNICATIONS/index.html

  • http://www.ietf.org/iesg/liaison.html


Liaisons from q14 sg15 itu main meeting geneva oct 21 31 2003

Liaisons from Q14/SG15 ITU main meeting-Geneva, Oct 21-31, 2003

  • Liaison Statement To IETF CCAMP on RSVP-TE and CR-LDP

  • ASON Status


Liaison statement to ietf ccamp on rsvp te and cr ldp

Liaison Statement To IETF CCAMP on RSVP-TE and CR-LDP

  • ITU Question 14 of Study Group 15 thanks you for your liaison in which you notified us of the survey taken of implementers of GMPLS constrained LSP signalling.

  • As Recommendation G.7713.3 is currently in force, we will continue to have a normative reference to CR-LDP [RFC 3212].

  • Your liaison has raised a concern regarding on-going maintenance of the CR-LDP code point space. We expect that future requests for code points in the range allocated to CR-LDP (0x0800 to 0x08FF) in [RFC 3212] will be granted based on “IETF Consensus” as defined in RFC 2434.


Ason updates

ASON Updates

  • SG 15 has consented G.7715.1/ Y.1706.1 “ASON Routing Architecture and requirements for Link State protocols”.

    • This Recommendation provides architecture and requirements for a link state realization of G.7715/Y.1706 and G.8080/Y.1304 and is protocol neutral. This may be of assistance to the ASON Routing Requirements design team.

  • There were no changes made to Discovery Recommendations.

    • However, new issues were included in the G.7714.1 living list such as an Interoperable solution for ECC based discovery mechanisms. Question 9 of SG15 is assessing G.7714.1 discovery methods in the context of the existing equipment Recommendation G.783.

  • Two new draft recommendations related to Control Plane functions are being developed in SG15.

    • G.fame, “Framework for ASON management”

    • G.7716, “Control plane initial establishment, reconfiguration and recovery”.

  • In signalling, a number of study points were added to the living list of G.7713 “Distributed call and connection management”.

    • These include feedback, interaction with Vcat/LCAS, separation of call and connection parameters, and signalling resilience.


Ason updates1

ASON Updates

  • Next Q.14/15 interim meeting

    • 16 – 20 February 2004, located in North Carolina, USA.

    • The Rapporteur for Q.14/15 invites the participation of the CCAMP WG in related discussions.

    • Details of the agenda will be provided prior to the meeting.

    • Interested should contact the Rapporteur for Q.14/15 (H. Kam Lam, [email protected]) by 13 January 2004.

    • Any contributions directed to the meeting must be submitted by 9 February 2004.


Itu t study group 15 communications to ietf ccamp working group1

ITU-T Study Group 15 Communications toIETF CCAMP Working Group

Wesam Alanqar

ITU-T SG15 Representative to IETF CCAMP

[email protected]


  • Login