National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power. Investor Presentation Nov 2010 . SPECTRUM OF OPERATIONS. Bauxite Mine Panchpatimali. Alumina Refinery Damanjodi. Spectrum of Operations. Aluminium Smelter Angul. Thermal Power Plant

Download Presentation

National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


National Aluminium Company Limited

Integrated operations : Bauxite – Alumina – Aluminium – Power

Investor Presentation

Nov 2010


SPECTRUM OF OPERATIONS

Bauxite Mine

Panchpatimali

Alumina Refinery

Damanjodi


Spectrum of Operations

Aluminium Smelter

Angul

Thermal Power Plant

Angul

Port facility

Vizag


FINANCIALS

( FY10 & PREVIOUS FIVE YEARS)

Figures in Rs. Crore

1 Crore=10 Million

Sales

LME

PAT

EPS


FINANCIALS

( FY11)

Figures in Rs. Crore

1 Crore=10 Million

NET SALES

PAT

EPS

40 %

125 %

125 %

QoQ COMPARISON


FINANCIALS (FY11)

QoQ COMPARISON

Figures in Rs. Crore

1 Crore=10 Million

NET SALES

PAT

EPS

27 %

40 %

40 %


PRODUCTION CAPACITIES

POST

2ND PHASE

CURRENT

STATUS

SCHEDULE

JAN’11

BAUXITE MINES

SCHEDULE

JAN’11

ALUMINA REFINERY

ALUMINIUM SMELTER

COMPLETED MAR’10

COMPLETED JUL’10

CAPTIVE POWER


PRODUCTION – NEXT FOUR YEARS


FINANCIAL PROJECTIONS – NEXT FOUR YEARS

GROSS SALES

SALES

LME

PAT

Exchange: 1 USD = Rs. 46


COST OF PRODUCTION 2010-11(Projected)

in Rs.


GROWTH INITIATIVES


TO BE A REPUTED GLOBAL COMPANY IN THE

METALS AND ENERGY SECTORS


OPTIONS FOR GROWTH


BROWNFIELD EXPANSION


EXPANSION OF REFINERY

  • 5TH STREAM OF 7 LAKH MT FROM YEAR 2014

    • (TOTAL CAPACITY – 30 LAKH MT)

  • INVESTMENT – Rs 1800 CRORE

  • BAUXITE NEED OF REFINERY AVAILABLE

  • SPECIALITY GRADE ALUMINA PLANNNED

  • BAUXITE NEED OF REFINERY

    MILLION TONNES


    BAUXITE RESERVES

    FIGURES IN MILLION TONNES

    REQUIREMENT TILL YEAR 2040 - 260 MILLION TONNES


    UPGRADATION OF SMLETER TO 220 KA AT ANGUL

    CAPACITY ADDITION: 92,000 TPY

    1 x 120 MW UNIT IN CPP

    INVESTMENT:

    Rs 900 CRORE (POT LINES AND CARBON PLANT)

    Rs 600 CRORE (POWER)

    EXPANSION OF SMELTER & CPP


    PLAN:

    UP-GRADATION OF SMELTER AMPERAGE TO 220 KA

    GAIN IN PRODUCTION: 92,000 TPY

    UP-GRADATION TO BE COMPLETED GRADUALLY BY 2016

    STATUS:

    RIO-TINTO ALCAN ENGAGED FOR PREPARATION OF FEASIBILITY STUDY

    ESTIMATED INVESTMENT: Rs. 1500 CRORES

    SMELTER UP-GRADATION- ANGUL


    INVESTMENT- INDIA


    0.5 MTPA SMELTER IN TWO PHASES OF 0.25 MTPA EACH

    7000MU POWER NEEDED - 1250 MW CAPACITY

    COAL REQUIREMENT OF CAPTIVE POWER PLANT: 7.5 MILLION TONNES

    ESTIMATED INVESTMENT: Rs. 16,500 CRORES

    GREENFIELD SMELTER IN INDIA


    4.2 MTPA MINES AND 1.4 MTPA REFINERY IN AP

    RESERVES ALLOTTED IN KR KONDA & GUDEM IN AP

    PFR PREPARED

    MINING PLAN UNDER PREPARATION

    DETAILED EXPLORATION ACTIVITY OF RESERVES TO START.

    AGENCY ENGAGED.

    INVESTMENT-Rs. 6000 CRORES.

    GREENFIELD REFINERY IN INDIA


    INDONESIA

    0.5 MTPA SMELTER AND 1250 MW POWER PLANT IN TWO PHASES

    ESTIMATED INVESTEMENT : USD 3.9 BILLION

    MOU SIGNED WITH GOVT. OF SOUTH SUMATRA.

    FEASIBILITY REPORT PREPARED.

    ALTERNATE LOCATION AT EAST KALIMANTAN EXPLORED.

    APPROVAL OBTAINED FROM INDONESIAN INVESTMENT COORDINATING BOARD

    PROJECT OFFICE OPENED IN JAKARTA

    EOI RESPONSES FOR IDENTIFICATION OF COAL SUPPLIER UNDER EVALUATION

    GREENFIELD SMELTER-ABROAD


    INVESTMENT- ABROAD

    LOCATION: EAST KALIMANTAN (INDONESIA)

    SCHEDULED COMMISSION: 2015


    DIVERSIFICATION


    1400 MW NUCLEAR POWER PLANT -JV WITH NPCIL

    ESTIMATED INVESTEMENT:Rs. 12,000 CRORES

    MOU SIGNED WITH NPCIL

    PROJECT IDENTIFIED

    JV AGREEMENT TO BE SIGNED – NOV’10

    NUCLEAR POWER PLANT-JV WITH NPCIL


    50 MW WIND POWER PLANT AT SUITABLE LOCATION HAVING WIND POTENTIAL

    ESTIMATED INVESTEMENT: Rs. 300 CRORE

    FEASIBILITY REPORT PREPARED

    SELECTION OF WIND FIRM DEVELOPER UNDERWAY

    SCHEDULED COMMISSIONING – OCT’11

    WIND POWER PROJECT


    UP & DOWNSTREAM INTEGRATION


    FLY ASH UTILIZATION:

    SELECTION OF SUITABLE PARTNER FOR ESTABLISHMENT OF FLY ASH BASED CEMENT GRINDING UNIT AT ANGUL IN ADVANCE STAGE

    ALUMINIUM PARK

    MOU SIGNED WITH IDCO FOR ESTABLISHMENT OF ALUMINIUM PARK AT ANGUL IN JV FOR DOWNSTREAM AND ANCILLARY INDUSTRIES

    JV COMPANY REGISTERED

    UP & DOWNSTREAM INTEGRATION


    ALUMINIUM WAGON PROJECT:

    Prototype aluminium wagon developed in collaboration with BEML.

    Undergoing RDSO inspection

    UP & DOWNSTREAM INTEGRATION

    • SPECIALITY ALUMINA :

    • Selection of JV partner for 100,000 MTPA is in progress.