1 / 14

Barrel testing continued + work before installation SSG H.Pernegger 8/6/06

Barrel testing continued + work before installation SSG H.Pernegger 8/6/06. Tests done sofar. TRT and SCT standalone tests Mainly online checks (eg. SCT characterization, TRT board tests, pickup test,…) Some standalone cosmics runs Cosmics Timing studies Top sectors SCT+TRT

mei
Download Presentation

Barrel testing continued + work before installation SSG H.Pernegger 8/6/06

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Barrel testing continued+work before installationSSGH.Pernegger8/6/06

  2. Tests done sofar • TRT and SCT standalone tests • Mainly online checks (eg. SCT characterization, TRT board tests, pickup test,…) • Some standalone cosmics runs • Cosmics • Timing studies • Top sectors SCT+TRT • Top + bottom sector SCT+TRT (~20k events sofar) as a test • Several combined noise and X-talk tests • Noise on SCT from TRT + Noise on TRT from SCT • Info & Links • Started looking at first test results, summary of some run experience, feedback from offline: • http://agenda.cern.ch/fullAgenda.php?ida=a062613 • Log books & Online results: • Logbook: http://pcphsctr02.cern.ch/cgi-bin/logbook.cgi • Display (calibration results): http://pcphsctr02.cern.ch/cgi-bin/datadisplay.cgi

  3. Offline check of NO • NO from fix-freq. Runs (~50Hz) • Used 010 time bin selection to allow for comparison to online histogramming ENC(EquivalentNoise Charge) = 1605 electrons Agrees with online calibration

  4. Current Module Issues on SCT Top/Bottom Sectors Top: 252 modules, Bottom: 216 modules (468 total) • 13 anolomies • 2 are ‘non-issues’ (db issues only affecting displays) • 2 new non-readable chips (dead vcsels, link0 read via link1) since single barrel testing • 2 newly masked links, under investigation B3 LMT23 Z-6 20220040200266 OK Trips during NO run, so left out. Ok in reception B3 LMT09 Z-5 20220330200408 still under investigation Link 1 masked - probably recoverable - ok in reception, and top sector commissioning B3 LMT09 Z+4 20220330200439 OK First chip masked off, same in SR1 reception but not at Oxford. Chip recovered now. B4 LMT28 Z-1 20220170200349 Non-issue Database issue. Replaced by 0170200752 at Oxford. B4 LMT29 Z+1 20220330200553 Non-issue Database issue. Replaced by 0170200113 at Oxford. Dave, Peter

  5. B4 LMT27 Z+1 20220170200378 (use harness red., no loss, but new defect) NewUsing RClk (zero IPIN) - ok in reception B5 LMT31 Z+1 20220170200079 (use harness red., no loss, but new defect) New Using RClk (zero IPIN) - ok in reception B5 LMT31 Z+6 20220170200179 (use harness red., no loss, but new defect) NewUsing RClk (zero IPIN)- ok in reception ==> B5 LMT07 Z+6 20220170200310 Ivecsel normal but still under investigation NewDead vcsel link 0. Read via link 1 - chip M0 lost - ok in reception B5 LMT36 Z+2 20220170200518 OK (Vpin 7V) Link 0 masked, recovered now - ok in reception B6 LMT39 Z+1 20220380200182 will be probed on PPB1 Digital ok, no analogue response. No data since Oxford assembly test? VccSense fault downstream of TPP – repaired??? B6 LMT09 Z+2 20220330200209 Known issue, 1 chip dead since assembly Dead vcsel link 0 - readout via link1 - chip M0 lost - same at Oxford ==> B6 LMT39 Z-6 20220380200010 1/2 vcsel I NewDead vcsel link 0 - readout via link1 - chip M0 lost - was ok at Oxford

  6. List of final (ongoing) tests • SCT FE noise during TRT readout cycle • Shift SCT L1 through TRT readout time • Done yesterday, to be repeated today • Heater • A simple test (discussed today): run 50 Hz physics triggers (single events for offline analysis) with TRT and SCT on • Make offline check of NO vs time for SCT and TRT parts • Data taking to start tomorrow • Repeate module characterization (all modules top+bottom) • ~2hrs of running, likely today or tomorrow night • Cosmics • See Tuesday’s presentations • Goal 0.5M: take ~8-10k/hr , assume 15 data taking with 24hr running • Will fit 3 days Mo-Wed for Top+Bottom cosmics

  7. Open Issues ? • Check actual thresholds • Resolve discrepancy to NO in cosmic running (trim target vs “1.0fC” • Test NO vs frequency • Offline efficiency for X1X is low • Points to still larger spread in module timing • Do we have Mark/space ratio issue at the moment? • Investigation of changing RX settings for opto • Kamil analyses data at the moment • Unlikely that we can do something now (before stop of tests) • Need further investigation • Investigate Vcc issue on 1 module (PPB1?) and Ipin (fibre failure) • Currently being looked at (Vcc) • Next week for Ipin (Tony is around next week) • Backplane contact • Will need to fit all tests in “uncabling period”

  8. SR1 Work before installation • There are lots of preparations for mechanical insertion on-going • 14h00 TC meeting • This is by Eric, Marco, Andrea, Yury • Not covered here • Work in SR1 • Uncabling • SCT work: 3wks • TRT work: 3 wks • Mechanical preps on trolley: ~ 1wk ? (still to be confirmed by Eric, Andrea, Marco

  9. Lowering date by Eric/Andrea/Marco ~20/8

More Related