Minimum measure 6 pollution prevention and good housekeeping
Download
1 / 28

Minimum Measure 6: Pollution Prevention and Good Housekeeping - PowerPoint PPT Presentation


  • 265 Views
  • Updated On :
  • Presentation posted in: Home / Garden

Minimum Measure 6: Pollution Prevention and Good Housekeeping. Gravel in gutter. Minimum Measure 3: Illicit Discharge Detection and Elimination. Grass raked into gutter. Minimum Measure 3: Illicit Discharge Detection and Elimination. Storm Drain. Gravel / trash. Yard waste.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha

Download Presentation

Minimum Measure 6: Pollution Prevention and Good Housekeeping

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Minimum Measure 6: Pollution Prevention and Good Housekeeping

Gravel in gutter


Minimum Measure 3: Illicit Discharge Detection and Elimination

Grass raked into gutter


Minimum Measure 3: Illicit Discharge Detection and Elimination

Storm Drain

Gravel / trash


Yard waste

Minimum Measure 3: Illicit Discharge Detection and Elimination


No BMPS in place

Minimum Measure 4:Construction Site Runoff Control


Need Best Management Practices

Minimum Measure 4:Construction Site Runoff Control


Need BMPs

Minimum Measure 4:Construction Site Runoff Control


Minimum Measure 6:Pollution Prevention and Housekeeping

Storm Drain

Trash / Litter


Storm Drain Stenciling Program

Minimum Measure 2: Public Participation and Involvement


Minimum Measure 4:Construction Site Runoff Control

Bare soil in gutter


Minimum Measure 4:Construction Site Runoff Control

Need BMPs


Need BMPs

Minimum Measure 4:Construction Site Runoff Control


Need BMP Maintenance

Minimum Measure 4:Construction Site Runoff Control


Minimum Measure 5:Post Construction Runoff Control


Minimum Measure 3:Illicit Discharge Detection and Elimination

Paint


Minimum Measure 3:Illicit Discharge Detection and Elimination

Oil / Antifreeze leaks


Minimum Measure 5:Post-Construction Management

Sediment


Minimum Measure 4:Construction Site Runoff Control

Bare soil

Storm Drain


Minimum Measure 5:Post-Construction Management


Minimum Measure 6:Pollution Prevention and Housekeeping

Sediment


Minimum Measure 6:Pollution Prevention and Housekeeping


Minimum Measure 4:Construction Site Runoff Control

Bare Soil

Storm Drain

Gravel


Minimum Measure 4: Construction Site Runoff Control


Minimum Measure 4:Construction Site Runoff Control


Minimum Measure 4:Construction Site Runoff Control


Minimum Measure 4:Construction Site Runoff Control


Minimum Measure 6:Pollution Prevention and Housekeeping


Minimum Measure 3:Illicit Discharge Detection and Elimination


ad
  • Login