1 / 4

FY19 Capital Project Proposal Electrical Infrastructure Project Completion

FY19 Capital Project Proposal Electrical Infrastructure Project Completion Requested Funds: $200,000. Electrical Project Completion. Project in 5-year plan to be funded over two years Upgrade to switchgear, breaker boxes, system capacity Current systems parts no longer manufactured

mcharlotte
Download Presentation

FY19 Capital Project Proposal Electrical Infrastructure Project Completion

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FY19 Capital Project Proposal Electrical Infrastructure Project Completion Requested Funds: $200,000

  2. Electrical Project Completion • Project in 5-year plan to be funded over two years • Upgrade to switchgear, breaker boxes, system capacity • Current systems parts no longer manufactured • In FY18 initial half of $200,000 awarded • Project will be in progress at beginning of FY19 • New fire alarm system included in this project concurrent with HVAC replacement

  3. Westinghouse products have not been produced since 1997 Please note the engraved date on the Federal Pacific panel.

  4. THIS IS CURRENTLY FUNCTIONAL. FUNDS WILL COMPLETE THIS UPGRADE FOR PANELS TO GO WITH NEW HVAC SMOKE DAMPENERS SWITCHGEAR MAIN POWER HANDLE. TAKES FUSES ABOUT THE SIZE OF A LOAF OF BREAD WHICH ARE NO LONGER AVAILABLE FOR PURCHASE