1 / 11

INGV: Leader PI: Paolo Favali

INGV: Leader PI: Paolo Favali. NEAREST WP4. NEAREST kick-off Meeting 9-11 October, 2006 - Bologna. WP4 - Tsunami signal detection. Objectives

mcantrell
Download Presentation

INGV: Leader PI: Paolo Favali

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INGV: LeaderPI: Paolo Favali NEAREST WP4 NEAREST kick-off Meeting 9-11 October, 2006 - Bologna

  2. WP4 - Tsunami signal detection Objectives The WP is aimed at carrying out geophysical and oceanographic measurements on the seafloor and in the water column in the nearby of near-shore tsunamigenic sources for the identifications of tsunami signals. The seafloor and water column measurements will be performed by means of a deep seafloor multiparameter observatory of GEOSTAR type, developed in previous EC projects and will be transmitted to shore in real-time (some essential parameters).

  3. Methodology • Use of already existing multiparameter seafloor observatory • The observatory will be managed by MODUS (Partner TFH)

  4. Seismometer Hydrophone • Specific set of sensors: -seismometer, • -hydrophone, • -differential pressure gauge • for cross-checking of different signals 3D-ACM DPG other sensors ? • Unique time reference for easy comparison of the signals

  5. The seafloor observatory will locally perform processing according to specifications identified by the partners • A surface buoy, will perform real-time transmission of seafloor processing results to a shore station for data integration • The buoy will be equipped with meteo and oceanographic sensor packages as well

  6. Work to be done (1/2) • Selection of new sensors • Upgrading of the hardware and software of the Data Acquisition and Control System (DACS) • Upgrading of the real-time communications (new protocol ?) • Overall integration • Tests (use of already available signals, synthetic signals, etc.)

  7. Deep sea long-term mission (about 1 year, R/V Urania): input from WP1 (Tsunami source identification) and WP2 (Tsunami source characterisation) Integration of seismic data in the marine data-base of the OBS data (WP3 – seismological monitoring) Work to be done (2/2)

  8. Partners involved WP4 ISMAR-BO.FFCUL, CSIC  marine site selection and characterisation for the pilot experimenton the basis of the knowledge of the area ISMAR-BO cruises responsible AWI, UGR, IM  common requirements of sensor sampling rates TFH  MODUS for the pilot experiment (deployment/recovery)

  9. Task 4.1 Definition of sensor requirements and sensor selection; requirements of the detection software (e.g., detection algorithm, triggering threshold, messages). Task 4.2 Design and development of modifications (e.g., sensor supports of the frame); design and development of the software. Task 4.3 Integration of new sensors/devices and new software in the seafloor observatory, tests of the functionality in laboratory. Task 4.4 Preparation planning and implementation of a long-term (about 1 year) mission; cruises for deployment and recovery. Task 4.5 Data back-up, quality checks, preparation of the data base to be integrated with other data; pre-analysis of ‘parent’ tsunami signals.

  10. WP4 Deliverables m 4 m 8 m 11 m 11 m 12 m 24 m 24 D10 definition of sensors’, software requirements for the deep-sea platform D11 detailed design for the integration of new sensors and device in the deep-sea platform D12 integration of new sensors, test of functionality of the deep-sea platform D13 deployment procedure for the deep-sea platform D14 deployment cruise of the deep-sea platform and cruise report D15a recovery cruise of the deep-sea platform and data quality checks D15b cruise report

More Related