RURAL WASTEWATER TREATEMENT IN HUNGARY

RURAL WASTEWATER TREATEMENT IN HUNGARY. Karácsonyi Judit University of Debrecen Centre for Environmental Management and Policy. BACKGROUND (1).

mayes
Download Presentation

RURAL WASTEWATER TREATEMENT IN HUNGARY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RURAL WASTEWATER TREATEMENT IN HUNGARY Karácsonyi Judit University of Debrecen Centre for Environmental Management and Policy 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  2. BACKGROUND (1) • 96% of Hungarian surface waters comes from outside the country quantity and quality of our surface water largely depends on the interventions made in our neighboring countries • Risk: communal wastewater Typology of surface waters 19/10/2004 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  3. BACKGROUND (2) Ground waters 19/10/2004 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  4. SETTLEMENT STRUCTURE Target state

  5. OBLIGATIONS • Until 31 December 2010 – agglomerations with a population equivalent of more than 15000 must be supplied with sewage network and biological (2nd level) waste water treatment plant • Until 31 December 2015 - agglomerations with a population equivalent of 2000 – 15000 the collection of waste water and at least the biological (2nd level) waste water treatment must be solved • Until 31 December 2008 - agglomerations with a population equivalent of more than 10000 in sensitive areas: the sewage network, biological (2nd level) waste water treatment and 3rd level treatment (N and P removal) must be solved • For agglomerations under 2000 PE load a Individual Sewage treatment National Feasibility Program – 174/2003(X.28) Government Decree was developed but the directive does not give a deadline for the building of treatment plants, sewage network or individual wastewater system. The 174/2003 decree states that after 1 January 2006 new building can be established only with individual wastewater treatment unit if there is no canalisation. „A Program”: 25/2002. (II. 27.) Government Decree: National Implementation Program of Urban Waste Water Collection and Treatment, „B Program”: 174/2003. (X. 28.) Government Decree: Individual Sewage treatment National Feasibility Program: relating to areas which can to be provided economically with centralized sewage and cleaning system. „Soft regulation”. 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  6. CURRENT SITUATION (1) Length of wastewater collection system 1990-2015 (thousand km) * Not including settlements under 2000 PE. 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  7. CURRENT SITUATION (2) SEWERAGE IN HUNGARY (%) 2004 Households connected to sewerage system Household not connected to sewerage system in provided areas Households at areas without sewerage system 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  8. CURRENT SITUATION (3) Cleaning rate of collected waste water in Hungary (%)01 May 2004 Not or just mechanically cleaned waste waters Cleaned wastewater 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  9. INVESTMENT DEMAND 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  10. SOLUTION IN RURAL AREAS • Near-natural waste water cleaning methods • tree plantation (quick infiltration), • pond (lagoon), • built hydrophytes (built wetland) • and the combination of the above mentioned • Domestic waste water units • domestic waste water treatment • domestic waste water treatment units • domestic waste water cleaning units • domestic waste water storing closed chamber The 174/2003 decree states that after 1 January 2006 new building can beestablished only with individual wastewater treatment unit if there is no canalisation. 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  11. THE NEW HUNGARIAN DEVELOPMENT PLAN (2007-2013) Operational Programmes of the New Hungarian Development Plan • Economic Development Operational Programme • Transport Operational Programme • Social Renewal Operational Programme • Social Infrastructure Operational Programme • Environment and Energy Operational Programme • State Reform Operational Programme • Electronic Public Administration Operational Programme • Implementation Operational Programme • Regional operational programmes Action plan (2007-2008) supports the implementation. 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  12. Environment and Energy Operational Programme (EEOP) • 1. Healthy, clean settlements 1.1 Utilization of wastes 1.2 Wastewater treatment 1.3 Aquifer protection and improvement of the quality of drinking water • 2. Proper treatment of our living water • 3. Proper treatment of our natural assets • 4. Increase of renewable energy usage • 5. Efficient energy usage • 6. Promotion of sustainable production and consumption habits • 7. Project preparation • 8. Financing the management of the operational programme (technical assistance) 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  13. The Regional Operational Programmes with special attention to waste water treatment in settlements less than 2000 PE • West Pannon Operational Programme • South Great Plain Operational Programme • North Great Plain Operational Programme • Central Hungary Operational Programme • North Hungary Operational Programme • Central Transdanubia Operational Programme • South Transdanubia Operational Programme 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  14. North Great Plain Operational Programme Priority axes (2007-2013): • Improvement of the operational conditions of the economy • Development of transport infrastructure of regional and local importance • Strengthening of the potential of tourism • Urban and regional development • Financing of the implementation of the North Great Plain Operational Programme (Technical assistance) 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  15. ACTION PLANof URBAN AND REGIONAL DEVELOPMENT PRIORITY(2007-2008) Aid intensity*: 90-95%. Amount of aid: 8 million €. 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007

  16. THANK YOU FOR YOUR KIND ATTENTION! 8th LAKEPROMO Seminar and Meeting, Budapest, 10-14 October 2007