Tgax july 2014 closing report
Download
1 / 7

TGax July 2014 Closing Report - PowerPoint PPT Presentation


  • 114 Views
  • Uploaded on

TGax July 2014 Closing Report. Date: 2014-07-17. Authors:. Abstract. This document is the closing report for the TGax for the July 2014 session. The TG agreed to elect two vice chairs in September The TG agreed to defer the discussion on the ad hoc structure How many Ad Hocs ?

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' TGax July 2014 Closing Report' - maxine


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Tgax july 2014 closing report
TGax July 2014 Closing Report

Date: 2014-07-17

Authors:

Osama Aboul-Magd (Huawei Technologies)


Abstract
Abstract

This document is the closing report for the TGax for the July 2014 session.

Osama Aboul-Magd (Huawei Technologies)


Tg structure

TG Structure

Osama Aboul-Magd (Huawei Technologies)


Work completed tg documents

  • Approved new revisions of TG Evaluation Methodology (11-14/ and Simulation Scenarios.

    • https://mentor.ieee.org/802.11/dcn/14/11-14-0571-03-00ax-evaluation-methodology.docx

    • https://mentor.ieee.org/802.11/dcn/14/11-14-0980-01-00ax-simulation-scenarios.docx

  • Approved the first revision of the TG Channel Models.

    • https://mentor.ieee.org/802.11/dcn/14/11-14-0972-00-00ax-mac-calibration-test-case-for-20-40-mhz-channel.docx

  • Approved the first revision of the TG Selection Procedure.

    • https://mentor.ieee.org/802.11/dcn/14/11-14-0938-04-00ax-802-11ax-selection-procedure.doc

  • Discussion on the Functional Requirement document.

Work Completed – TG Documents

Osama Aboul-Magd (Huawei Technologies)


Work completed technical presentation

Work Completed – Technical Presentation

Osama Aboul-Magd (Huawei Technologies)


September 2014 goals
September 2014 Goals and Simulation Scenarios.

  • TG Vice Chairs election.

  • Continue to advance TG documents.

  • Technical Presentations.

Osama Aboul-Magd (Huawei Technologies)


Conference call times
Conference Call Times and Simulation Scenarios.

  • Thursday August 14 – 10:00 -12:00 ET

Osama Aboul-Magd (Huawei Technologies)


ad