Auto iwg wp5 telco 04 04 2012 agenda
Download
1 / 2

AUTO IWG WP5 Telco 04.04.2012 Agenda - PowerPoint PPT Presentation


  • 57 Views
  • Uploaded on

AUTO IWG WP5 Telco 04.04.2012 Agenda. O verview. Validas : Vision of Qualification Kit and Roadmap Status Validas : “ Seconds Steps ” on the roadmap (Design & Architecture , Test, MC/DC- Coverage measurement ,..) virtual vehicle: Review Tool Requirements for the Tool Chain Analyzer

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' AUTO IWG WP5 Telco 04.04.2012 Agenda' - maxine-lester


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Auto iwg wp5 telco 04 04 2012 agenda

AUTO IWG WP5 Telco 04.04.2012Agenda


O verview
Overview

  • Validas: Vision ofQualification Kit andRoadmap Status

  • Validas: “SecondsSteps” on theroadmap (Design & Architecture, Test, MC/DC-Coveragemeasurement,..)

  • virtual vehicle: Review Tool Requirements for the Tool Chain Analyzer

  • virtual vehicle: EPF Process Modeling (TC/TQ)

  • virtual vehicle: Simple Plug-in Development based on the Process

  • All: Feedback tofirst/secondsteps (ifavailable)

  • All: Discussion on nextsteps


ad