Gamma-ray Large Area Space Telescope. 7E: Tower test plans. GLAST Large Area Telescope: Tracker Subsystem. Nicola Mazziotta University and INFN Bari - Italy [email protected] Outline. Overview Tower vib plan Tower thermal plan Test schedule Summary. Reference LAT Documents:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '7E: Tower test plans' - maximilian


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
7e tower test plans l.jpg

Gamma-ray Large Area Space Telescope

7E: Tower test plans

GLAST Large Area Telescope:Tracker Subsystem

Nicola MazziottaUniversity and INFNBari - [email protected]


Outline l.jpg
Outline

  • Overview

  • Tower vib plan

  • Tower thermal plan

  • Test schedule

  • Summary

  • Reference LAT Documents:

  • LAT-MD-00408, LAT Instrument Performance Verification Plan

  • LAT-SS-00788, LAT Environmental Specification

  • LAT-TD-01005, Thermal Test Results on Thick Converter Mock-up Trays

  • LAT-TD-01249, Thermal Test Results for Pre-Engineering Model Trays

  • LAT-PS-01584, LAT Tracker TraySSD Ladder Panel Assembly Procedure

  • LAT-TD-00155, Tower Vibration Test Plan

  • LAT-TD-01840, Tower Thermal Test Plan





Tower vib levels l.jpg
Tower vib levels

Low frequency sine sweep

White Noise

High frequency sine sweep


Tower vib set up l.jpg
Tower vib set up

  • Accelerometers set up (TBR):

  • 3 axial on the shaker table (control accelerometer)

  • 3 axial on the center of the bottom tray lower surface

  • 3 axial on the center of the top tray upper surface

  • 3 axial accelerometer +X sidewall center of the thermal boss tray number 12;

  • 3 axial accelerometer +Y sidewall near the center of the tray number 10;

  • 3 axial accelerometer +Y sidewall center of the thermal boss of the tray number 1;

  • 3 axial accelerometer +Y sidewall center of the thermal boss of the tray number 19;

  • 3 axial accelerometer -X sidewall center of the thermal boss of the tray number 10;

  • 3 axial accelerometer -Y sidewall near the center of the tray number 10, on the center plane;


Tower a vib sequence l.jpg
Tower A vib sequence

For each axis



Tower a thermal levels l.jpg
Tower A thermal levels

8 Cycles

(Tab. 2 LAT-MD-408)



Tower thermal set up l.jpg
Tower thermal set up

Tower covered with a thermal blanket during T-V cycles.

The tower has a large number of thermocouples in the read out cables that can be acquired by using the TKR DAQ system.

  • Additional thermocouples (TBR):

  • +Y sidewall center of the thermal boss of the tray number 1;

  • +X sidewall center of the of the tray number 1, on the center plane;

  • +Y sidewall center of the thermal boss of the tray number 19;

  • +X sidewall center of the of the tray number 19, on the center plane;

  • -X sidewall center of the thermal boss of the tray number 10;

  • -Y sidewall near the center of the tray number 10, on the center plane

The temperature control point for the cold part of the cycle will be the coldest thermocouple, while the control point for the hot part of the cycle will be the hottest one.



Summary l.jpg
Summary

  • Work in progress:

  • Number of thermal qualification cycles

  • LPT definition

  • CPT definition

  • Use of strain gauges for T-V test ???