GuoNeng Electricals, China. GNE. Business Sectors. Power Generations – Energy Solutions Project Engineering Machinery Supply Auto Control Solutions Parts & Services Environmental Protections – Total Solutions Thermal power plant by burning urban garbage Ethonol Vinasse treatment. GNE.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' GuoNeng Electricals, China ' - matthew-berry


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Business sectors
Business Sectors

  • Power Generations – Energy Solutions

    • Project Engineering

    • Machinery Supply

    • Auto Control Solutions

    • Parts & Services

  • Environmental Protections – Total Solutions

    • Thermal power plant by burning urban garbage

    • Ethonol Vinasse treatment

GNE


Power generation thermal
Power Generation-Thermal

  • Steam Boiler

    • CFB/PC/Bagasse/Biomass

  • Steam Turbine

    • Condensing/Extraction/Back Pressure

  • Turbo Generator

    • Direct Coupling/Gearbox, Air/Hytrogen Cooling

  • Total Controls

    • DCS/PLC, Instrumentations

GNE


Power generation hydro
Power Generation-Hydro

  • Hydro Turbine

    • Axial Inflow/Intrusion/Pressure Inflow

  • Hydro Generator

    • Single Shaft/Gearbox

  • Total Controls

    • DCS/PLC, Instrumentations

GNE


Power Generation-Thermal

  • Business Associated with:

    • CNIEC, CHEC

    • GXYA

    • China Science Group

    • Hualan Engineering

    • Top Brands of Manufacturers

      ……

GNE


Sound track
Sound Track

  • Thermal Power Plants: CFB/PC boiler 120-300t/h, Steam Turbine 15-50mw,major boiler, turbine, generator plus auxiliaries, 3 sets

  • Heat and Power Plants for Sugar Mills:bagasse boiler 35-85t/h, turbo generator 3-12mw,major boiler, turbine, generator plus auxiliaries, 5 sets

  • Heat and Power Plants for Textile, Chemical Mills:CFB/PC boiler 35-120t/h turbo generator 3-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets

  • Thermal Power Plants of Burning Urban Garbage:CFB boiler 35-65t/h, turbo generator 6-15mw, major boiler, turbine, generator plus auxiliaries, 2 sets

  • Thermal Boiler Burning Vinasse from Alcohol Plant: 15T/H, vinasse treatment 600t/d

  • Auto Controls: DCS, PLC, Instrumentations: 60 sets

  • Hydro Power Plant:3-10mw: major boiler, turbine, generator plus auxiliaries, 2 sets

GNE


Typical thermal power plant
Typical Thermal Power Plant

  • Huaxing Power Plant, Baise, China

  • Boiler:1*220t/h CFB, 9.81MPa, 540℃

  • Turbo Generator: 1*50MW, 9.0MPa, 500℃

  • Completion: Dec., 2004

  • Notes: Second hand turbo generator, made in 1959

Total Plant

Turbo Generator

Feed Pumps

Control Room

DCS Operator Station

GNE


Captive power plant 1
Captive Power Plant (1)

  • Deyongjia Garment Plant, Dongguan, China

  • Boiler:4×75t/h, CFB, 3.98MPa, 450℃

  • Turbine:15MW 3.5MPa 435℃

  • DCS:BTG synchronized auto controls

  • Date of Completion: May, 2001

Total Plant

TG Set

Coal Conveying

Control Room

Power Panels

GNE


Captive Power Plant (2)

  • #1、#2、#3、#4 Boiler auto controls, Baiganhua Sugar Mill, Baise, China

  • Honeywell HC-900 DCS system

  • All boilers communicate to each other plus remote controls

  • EJA series pressure transmitters, ZKZ series control valves , Wayleber flow meters

GNE


Power plant burning garbage
Power Plant – Burning Garbage

  • Dongguan Garbage Power Plant, 2×15+1×12mw, 1200t/d garbage handling, Guangdong, China

  • Ningbo Garbage Power Plant, 2×15mw, 800t/d garbage handling, Zhejiang, China

  • Boiler:65t/h CFB, 3.98MPa 450℃

  • Turbo Generator:15mw, 3.5MPa, 435℃

  • Date of Completion: Dongguan-March, 2005, Ningbo-Dec., 2005

Dongguan Plant

Ningbo Plant

Turbo Generator

Control Room

CFB Boiler

GNE


International projects
International Projects

  • AA Group, 300t/h, CFB,Biomass, Thailand

  • Boiler:300t/h, CFB, 9.8MPa, 540℃

  • Date of Completion:under construction, to commissioning in Oct. 2008

Signing Ceremony

Technical Agreement Signing

China Representatives

Site Survey

Site Survey

GNE


International projects1
International Projects

  • SSYPL, 2*35t/h, CFB,2*7.5MW STG, India

  • 2009.04.25 Signing of contract with SSYPL

Signing Ceremony

GNE


International Projects

Lhoknga 2×16MW Power PlantEP Project, Indonesia

  • Boiler:75t/h,CFBC Boiler, 3.9MPa, 450℃

  • Steam turbine and generator:15MW, 3.5MPa, 435℃

  • Associated withCHEC, 2006

    Used plant package supplied to Indonesia, 2008.

  • Boiler: 2×75t/h,CFBC Boiler, 3.9MPa, 450℃

  • Steam turbine and generator:2×15MW, 3.5MPa, 435℃

    HFO DG Sets, 4×10MW, 2008, package supplied to Indonesia

  • 4×10MW, HFO DG Sets

  • Associated with GD Imp/Exp Corp.

GNE


International projects2
International Projects

India KPPL 2×25MW thermal power plant EP Project

  • Boiler:2×130t/h, PC Boiler, 3.9MPa, 450℃

  • Steam turbine and generator:2×25MW, 3.5MPa, 435℃

Contract Signing

GNE


Typical International Projects

  • SSYPL, Surat, India

    - Boiler: CFB, 2x35t/h, 3.82MPa, 450 ℃

    - TG:2x7.5MW, 3.82MPa, 435 ℃

GNE


Dcs applications

Typical DCS installed

XDPS-400, Shanghai Xinhua

MACS, Beijing Hollysys

WebField ECS-100, Supcon

PCS7, Siemens

Florence 2000, ABB

UMC-800/HC900, Honeywell

DCS Applications

GNE


Plc applications

Typical PLC installed

S7-200/S7-300, Siemens

Schneider

Allen Bradley

FX2N, Mitsubishi

PLC Applications

GNE


Installed instrumentations
Installed Instrumentations

Pressure Transmitters

50MW Turbo Generator

Drum leveler

Temprature Probe

Speed Sensors

Generator Hydrogen Cooling

Sony Video Camera

Industrial Monitors

GNE


Typical projects
Typical Projects

#1、#2、#3、#4 Boiler auto controls, Baiganhua, Baise, China

  • Honeywell HC-900 DCS system

  • All boilers communicate to each other plus remote controls

  • EJA series pressure transmitters, ZKZ series control valves ,

    Wayleber flow meters

GNE


GuoNeng Electricals Ltd.

Addr.: Rm1612, Xincheng Int’l Bldg, No.92-1,

Nanning, Guangxi, 530028 China

Tel: 0771-5511310 5501300

Fax: 0771-5511852

Email: [email protected]

GNE


ad