Rickey Green, PMP Manager of Rail Systems Capital Metropolitan Transportation Authority - PowerPoint PPT Presentation


  • 126 Views
  • Uploaded on

Rickey Green, PMP Manager of Rail Systems Capital Metropolitan Transportation Authority Office 512-852-7261 Cell    512-563-4891 [email protected] Eighteen years in the Transportation industry: General Railway Signal                       – Engineering Supply;

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Rickey Green, PMP Manager of Rail Systems Capital Metropolitan Transportation Authority' - matt


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Rickey Green, PMP

Manager of Rail Systems

Capital Metropolitan Transportation Authority

Office 512-852-7261

Cell    512-563-4891

[email protected]

Eighteen years in the Transportation industry:

  • General Railway Signal                       – Engineering Supply;

  • Federal Railroad Administration        – Regulatory;

  • DMJM+Harris Consultant                        – Transportation Engineering (DART)

  • Capital Metropolitan Transit Authority  – Public Transit Agency (Austin, TX)

    Education:

  • MA       – Transportation Management “with a concentration in security

    management” (American Public University);

  • BS        – Multidisciplinary Studies (Rochester Institute of Technology)

  • PMP     – Project Management Professional certification


Presentation overview
PRESENTATION OVERVIEW

HISTORY

PROJECT DESCRIPTION

OPERATING METHODOLOGY

SIGNALIZATION


Cars Shipped = 41,000

CMTA Rail System

CMTA RAIL LINE

UPRR RAIL LINE

162Track Miles

Crushed Aggregate

LLANO

Union Pacific RR

UP R.R.

AUSTIN JCT.

GIDDINGS


  • Public Referendum

  • November 2004

  • 33 Track Miles

  • 9 Station Platforms

  • Single Track

  • 6 DMU’S

  • Rail Maint. Facility

  • 16,000 Sqr. Feet

PROJECT OVERVIEW


Passenger Corridor Rail Stations

Leander

Lakeline

Howard

Burnet

Crestview

Highland

ntown

MLK, JR.

Downtown

Plaza Saltillo


RAIL MAINTENANCE FACILITY

16000 Square Feet




CTC Signal Project

  • Phased Procurement Process.

    • Design;

    • Material Purchase;

    • Installation;

  • Design Basis Temporal Separation.

    • 18 Control Points

    • 9 Intermediate Signals;

    • 6 Split Point Derails.

I


Signal Instrument House

Communications.

  • DCS Interface;

  • Cellular Network;

  • Future Fiber.



Grade crossing upgrade project

Grade Crossing Upgrade Project

70 Public Crossings in Passenger

Corridor;

Project Cost Approximately $ 5 Million;

Phased Procurement Process.

Design;

Material Purchase;

Installation.


Grade crossing upgrade project1

Grade Crossing Upgrade Project

Private Crossings in Passenger

Corridor (15);

Private Crossing Risk Mitigation.

Permanently Close Where Possible;

Control Access ;

Signalize.


Grade crossing treatments

Grade Crossing Treatments

Capital Metro Is Proactive Approach to

Risk Mitigation;

Crossing Markings Upgrade;

Signage Upgrade;

Community Outreach;

Operation Lifesaver;

Fencing Program.


Existing Quiet Zones

Crystal Falls

Avery Ranch

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd

Crestview Wooten


Cedar Quiet Zone

Cedar Park

  • BMC

  • Brushy Creek

  • Park St.

  • Discovery Blvd.

  • FM 1431

  • New Hope Rd.

  • Blockhouse Rd.

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd


CMTA PH-4 Quiet Zone

  • Gracy Farm

  • MOPAC

  • Adelphi

  • Oak Creek

  • Mc Neil Dr.

  • Mc Neil Merrill Town

  • Mc Neil Round Rock

Phase 4

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd


Cherry Wood

Quiet Zone

  • IH -35 @ 38 ½ ST.

  • Wilshire Blvd.

  • 38 ½ ST

  • Cherry Wood

  • Manor Rd.

  • MLK Blvd.

  • 12 th ST.

  • Rosewood Ave.

  • Webberville Rd.

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd

Cherry Wood


Cherry Wood

Quiet Zone

  • 7th ST.

  • 7th ST.

  • Pedernales ST.

  • Robert Martinez

  • Chicon ST.

  • Comal ST.

  • Navasota ST.

  • Waller ST.

  • IH-35 4th ST.

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd

Cherry Wood


Final

Quiet Zone Map

Crystal Falls

Cedar Park

Avery Ranch

Phase 4

Crestview Wooten

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd

Cherry Wood


Final

Quiet Zone Map

  • Quiet Zone Establishment

  • Jurisdictional Authorities

  • Board Approval (ILA’s)

    • City of Austin

  • Design SSM

  • Coordination FRA

    • Extend Current Zones

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd


Community Outreach

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd