240 likes | 351 Views
2. Presentation Outline. Scope of AnalysisBQM-74F and the baseline BQM-74EDefinition of Alpha ContractingApproach to Cost Risk AnalysisInterpretation of ResultsConclusion. 3. Scope of Analysis. Performed an assessment of technical, schedule, and cost risk of the performance of the BQM-74F Aeria
E N D