ACC 340 WEEK 5, Final Exam
This presentation is the property of its rightful owner.
Sponsored Links
1 / 3

ACC 340 WEEK 5, Final Exam PowerPoint PPT Presentation


ACC 340 WEEK 5, Final Exam Purchase here http://chosecourses.com/acc-340-week-5-final-exam Description1). Three logical database structures include ___________ 2). A notation showing the relationship among entities is called _________ 3). The process of examining and arranging file data in a way that helps avoid problems when these files are used or modified later is called _______________. 4). Data definition commands, data query commands and report generators are features of 5). Organizational structure for the general ledger is provided by 6). AISs depend heavily on the use of codes to record, classify and retrieve financial data. 7).The practice of examining business practices and redesigning them from scratch is called 8). Software solutions that include financial functions interfaced with manufacturing, sales and distribution, and human resources are called 9). Label the four stages in the systems development life cycle. 10. When installing a new system, the 3 changeover possibilities are 11. Name two tools used to plan, schedule and monitor the activities during a systems implementation project. 12. The objective in designing any internal control system is to provide foolproof protection against all internal control risks. 13. A good _________ enables an accounting manager as well as auditors to follow the path of the data recorded in transactions form the initial source. 14. A control activity of an internal control system that focuses on structuring work assignments among employees so that one employee's work activities serve as a check on those of another employee is called ______________. 15. What kind of analysis should be performed when considering if an internal control procedure should be implemented? 16. Which of the following are examples of fault tolerant systems. 17. Control totals are an example of a(n) 18. A criticism of the traditional architecture is a lack of integration across functional areas of the organization. 19. __________________ ________________means the computer-input device is connected to the CPU so that master files are updated as transactions data are entered. 20. The _________________________ has been one of the most exciting developments in telecommunications and networking.

Download Presentation

ACC 340 WEEK 5, Final Exam

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Acc 340 week 5 final exam

ACC 340 WEEK 5, Final Exam

Purchase here

http://chosecourses.com/acc-340-week-5-final-exam

Description

1). Three logical database structures include ___________

2). A notation showing the relationship among entities is called

_________

3). The process of examining and arranging file data in a way that helps

avoid problems when these files are used or modified later is called

_______________.

4). Data definition commands, data query commands and report generators

are features of

5). Organizational structure for the general ledger is provided by

6). AISs depend heavily on the use of codes to record, classify and

retrieve financial data.

7).The practice of examining business practices and redesigning them from

scratch is called

8). Software solutions that include financial functions interfaced with

manufacturing, sales and distribution, and human resources are called


Acc 340 week 5 final exam

9). Label the four stages in the systems development life cycle.

10. When installing a new system, the 3 changeover possibilities are

11. Name two tools used to plan, schedule and monitor the activities

during a systems implementation project.

12. The objective in designing any internal control system is to provide

foolproof protection against all internal control risks.

13. A good _________ enables an accounting manager as well as auditors to

follow the path of the data recorded in transactions form the initial

source.

14. A control activity of an internal control system that focuses on

structuring work assignments among employees so that one employee's work

activities serve as a check on those of another employee is called

______________.

15. What kind of analysis should be performed when considering if an

internal control procedure should be implemented?

16. Which of the following are examples of fault tolerant systems.

17. Control totals are an example of a(n)

18. A criticism of the traditional architecture is a lack of integration

across functional areas of the organization.

19. __________________ ________________means the computer-input device is

connected to the CPU so that master files are updated as transactions

data are entered.


Acc 340 week 5 final exam

20. The _________________________ has been one of the most exciting

developments in telecommunications and networking.


  • Login