An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Company Profile Oct 2003

  2. Profile • Based in Cape Town, South Africa • Operate worldwide • Project and Recruitment Specialists • Provide cost effective Projects • Suit each project to the clients needs www.gksolutions.co.za

  3. Cost Effective • Projects manned by consultants on contract • Results in a reduced cost of project • Provides a better match of consultants to the project • Unnecessary overheads not transferred to project cost • Results in a higher Return on Investment • Less risk www.gksolutions.co.za

  4. Project Elements • Cost Saving • Management Control Systems • Short Interval Controls • First Order Control Systems • Area Control Systems • Division / Company Control Systems • Flash Reports • Motivation & Team building • Process improvement • New process / technology implementation • Re-engineering www.gksolutions.co.za

  5. Short Interval Controls • SIC's are the success of a project. They are measurements made in line with the agreed KPI and compared to the target. As the name suggests, the shorter the interval between measurements, the quicker the candidate can realize an out of range activity, and react to rectify the situation, resulting in a smaller loss.  If the situation cannot be rectified by the first level it is then escalated to the next level, until the problem can be resolved. Note, the SIC should not be time consuming so loosing the focus on the work at hand, and should take into account the literacy / numeracy level of the operator. The SIC should be a self measurement, thus allowing the operator to understand and trust the figures. This is a step closer to empowerment. www.gksolutions.co.za

  6. Projects • Secureco Western Cape • Develop new business structure • Develop production & Financial Management Control Systems • Coach line management • Vodago • Develop reports for fault tracking • Set service level agreements • Track service level agreements • Central Boating • Develop quoting / Purchase Order systems • BP / Castrol • Project manage the merge of BP / Castrol lubricants. www.gksolutions.co.za

  7. Contact Details George Krafft • Email george@gksolutions.co.za • Telephone Cell 082 417 5488 • Telephone Office 021 554 3995 • For more detail Web Page www.gksolutions.co.za www.gksolutions.co.za