WELCOME
Download
1 / 29

WELCOME - PowerPoint PPT Presentation


  • 111 Views
  • Uploaded on
  • Presentation posted in: General

WELCOME. Asia BRTS Conference 2012 Ahmedabad BRTS PROJECTS IN PCMC AREA, PIMPRI, PUNE. 6-8 September 2012. We would like to share with you. 1. About Pimpri Chinchwad City. 2. Institutional set up and key responsibility. 3. Information about BRTS projects. 4. BRTS system.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha

Download Presentation

WELCOME

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


WELCOME

Asia BRTS Conference 2012

Ahmedabad

BRTS PROJECTS

IN PCMC AREA, PIMPRI, PUNE.

6-8 September 2012.


We would like to share with you

1

About Pimpri Chinchwad City

2

Institutional set up and key responsibility

3

Information about BRTS projects

4

BRTS system


About Pimpri Chinchwad City


Located towards North of Pune

Area of 181 sq. kms.

Population: 1.7 million (approx)

PCMC received “BEST CITY “ award 0n 13th December From GOI for its best performance in JnNURM

Pimpri Chinchwad at a Glance

  • Area under Green Cover: 27%

  • AualBunndget (2012-2013): Rs. 2862Crs.

  • Credit Rating: AA+ (SO) by CRISIL Ratings (S&P)


Vibrant city in the state of Maharashtra, India

  • Strong industrial base

    • Small & medium industrial units of about 6,000

    • Large industrial units of about 50

    • Auto and ancillary industrial Hub


Presence of International IT Firms


Social and recreational facilities

  • Strong Social Infrastructure with Municipal Hospitals and Dispensaries, Public Gardens, Libraries, Auditoriums, Play grounds etc.

  • Strong educational infrastructure including Municipal Schools, Medical, Engineering, IT and Management institutes.


Population growth

  • The city has a population of about 1.7 millions growing over 7.2% p.a. (national average 2.1%)

  • Growth is fuelled by prospects of economic activity, good quality of infrastructure services and strong connectivity to the industrial capital of India i.e. Mumbai


Urban Sprawl Patterns & Future Growth Scenario - 2031

Chakan New International Airport

Talgaon

Talwade IT Park

Dehu

Mumbai-Pune Exp Way

Hinjewadi IT Park

Pune City

NOTE: MAP NOT TO SCALE

Projected Population for PCMC 29 lakhs (CDP) in 2031


Institutional Set-up

Key Responsibilities


Institutional set up

  • Pimpri – Chinchwad Municipal Corporation (PCMC) constituted in the year 1982

  • The body constitutes of

    • Elected wing headed by – Mayor

    • Administrative wing headed by – Municipal Commissioner

  • We manage about 181 sq.kms of area through 4 Ward offices

  • We have over 40 departments with a workforce of about 7500 employees


Institutional set up

  • We are fully e-governed Corporation

  • We have received International Organization of Standard (ISO) Certification (ISO 9001:2008) for Quality Management System in March 2012.


Responsible for

  • Area planning

  • Infrastructure planning, implementation and operation & maintenance of services in the areas of

    • Water Supply,

    • Sewerage and Sanitation,

    • Solid Waste Management,

    • Roads and Transportation,

    • Street lighting,

    • Health and recreational facilities,

    • Education (134 primary and 18 secondary schools)

    • Preservation of natural heritage (river conservation),

    • Development of housing facility for urban poor/ slums.


Vision

To make Pimpri Chinchwad, a city of and for the next generation

Economically vibrant, attracting top business houses

And to meet the requirements of all its citizens

A city to Live, Spend and Entertain


Key initiatives taken

Project Cost

(` in Millions)

Infrastructure Projects

  • Promoting development

    • Corridor densification along Bus Rapid Transit System (BRTS), leveraging TDR

  • Providing infrastructure ahead of its time

    • Implementing Rs. 26000 Millions projects sanctioned by JNNURM

    • Providing water security

    • Investments in sanitation and waste management

  • Making the city slum free

    • Slum rehabilitation and EWS housing to provide 32,000 houses

  • E Initiatives for better governance

    • Wi fi city

    • GIS based dynamic administration

Water Supply

4987

Sewerage

2401

Solid waste management

704

BRTS & purchase of city transport buses

8032

Housing for slums

8631

Storm water drainage

1163

E-governance

92

Total

26000


PROJECTS EXECUTED

Pune – Mumbai Road

Grade Separator at Pimpri

Subway at Vallabhnagar

Intersection at Finolex Pimpri


INFORMATION OF BRTS PROJECT


BRTS PROJECTS IN PCMC AREA

Total BRTS Corridor Length = 44.575 Km.

AUNDH RAWET ROAD Length = 14.50 Km. Tender Cost =191.40

PUNE MUMBAI ROAD Length = 11.90 Km. Tender Cost =120.74

KALEWADI ROAD Length = 10.275 Km. Tender Cost =219.20

Second Intersection

First Intersection

NASHIK PHATA ROAD Length = 7.90 Km. Tender Cost =206.80


BRTS Phase- I Corridors

  • OLD MUMBAI PUNE CORRIDOR (DAPODI TO BHAKTI SHAKTI) – 12 KM

  • AUNDH – RAVET – 14.5 KM

  • NASHIK PHATA – WAKAD – 8 KM

  • KALEWADI PHATA – DEHU ROAD – 10.5 KM

  • Total Length = 45 km


Construction of Flyover & ROB at Nashik Junction on old Mumbai

Pune NH-4 including Bridge on River Pawana


BRT SYSTEM


Cross Section of 45 m Wide BRTS Road


Bus Rapid Transit Bus Stations

  • Principal elements for consideration

  • Convenient boarding and alighting

  • Efficient fare collection

  • Comfortable and attractive stations

  • Easy safe signalized/dedicated approaches to Bus Stations

  • Modal integration

  • Excellence in customer service


  • Conceptual Layout

BRTS STATIONS -60.0 X 4.0 M

SIZE FOR BOTH SIDE DOCKING


“Think Railway Stations, Use Bus Stations!”

BRT Bus Stations can give the same quality of service as Metro/Railway Stations to a large number of citizens across the city.


Hybrid BRT ! – On & Off the Corridor

RIGHT SIDE LEVEL BOARDING ON THE CORRIDOR LIKE METRO RAIL

LEFT SIDE STEPPED BOARDING OFF THE CORRIDOR ( OUTSIDE BRT CORRIDOR)


BRT station side entry from right side door


BUS STATION DESIGN AND COMPONENTS


Thank you

PCMC, PIMPRI, PUNE


ad
  • Login