Integrated Corridor Management (ICM)

ITS America Annual Meeting 2010 Session SS24. Integrated Corridor Management (ICM). Steve Mortensen Senior ITS Engineer Federal Transit Administration May 4, 2010. What is ICM? . The integrated management of freeway, arterial, transit, and parking systems within a corridor

marvel
Download Presentation

Integrated Corridor Management (ICM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITS America Annual Meeting 2010 Session SS24 Integrated Corridor Management (ICM) Steve Mortensen Senior ITS Engineer Federal Transit Administration May 4, 2010

  2. What is ICM? • The integrated management of freeway, arterial, transit, and parking systems within a corridor • Management of the corridor as a system, rather than the more traditional approach of managing individual assets

  3. Broad ICM Strategies • Increase multi-agency collaboration and coordination for overall corridor management • Coordinate incident management • Coordinate operations for planned and special events • Optimize corridor mobility by promoting shifts in departure time, mode, and routes • Manage demand

  4. Supporting ITS Technologies • HOT lanes / congestion pricing • Transit signal priority • Multimodal traveler information / Actionable traveler information • Real-time traffic signal coordination, timing, and control • Adaptive ramp metering • Integrated electronic payment

  5. ICM Initiative • Goals • Demonstrate and evaluate strategies and ITS technologies that help transportation operators efficiently and proactively manage corridors • Provide the necessary tools, knowledge, and guidance, for ICM

  6. Eight USDOT ICM Pioneer Sites • 3 Stages for the Pioneer Sites: • Stage 1 – Concept of Operations, Sample Data, and Requirements • Stage 2 – Analysis, Modeling, and Simulation • Stage 3 – Demonstration and Evaluation Seattle Minneapolis Montgomery County Oakland San Diego Dallas San Antonio Houston

  7. ICM Pioneer Sites

  8. ICM Lifecycle Process Evaluation and Performance Monitoring Analysis, Modeling & Simulation Evaluation and Performance Monitoring Analysis, Modeling & Simulation

  9. What have we learned in the ConOps/Requirements Development Process • Involve the Right people from the Start • Develop a Clear Concept • Go slow to go fast • The need for Needs • A Picture = A Thousand Words • Technical gaps will exist • Word Choices is Important • Build the right thing and build it right

  10. ICM AMS Methodology: Provides Multi-level Analysis Traffic control strategies such as ramp metering and arterial traffic signal control Regional patterns and mode shift; Transit analysis capability Traveler information, HOT lanes, congestion pricing and regional diversion patterns 10 10

  11. AMS Pioneer Sites San Diego (I-15) Minneapolis (I-394) Dallas (US-75)

  12. Summary of AMS Site Models

  13. AMS Pioneer Sites - Strategies

  14. AMS Pioneer Sites – Strategies (continued)

  15. Summary of Benefits vs. CostsHigh Demand with Major Incident 15.27 19.48 8.75 14.59 8.87 1.42 2.49 Benefit Cost

  16. AMS for Stage 2 Sites – Progress Update • Tasks Complete • Analysis Plans • Data Collection Plans • Data Collection • Build AMS tools  • Calibrate/validate the Baseline Models  • Tasks In Progress • Analyze alternatives  • Produce performance measures  • Next Tasks • Draft and final report, AMS workshop

  17. Demonstration Pioneer Sites San Diego (I-15) Dallas (US-75) Proposed Strategies • Decision support system • Actionable traveler information • IVR (e.g., 511) • Website • E-mail alerts • Comparable travel times • Rerouting of traffic • Coordinated timing and adaptive signal control • Mode shift • Parking management • Real-time service adjustments • Proposed Strategies • Decision support system • Actionable traveler Information • 511 (phone and website) • Comparable travel times • Managed lanes • Rerouting of traffic • Coordinated timing and responsive signal operations • Coordinated ramp metering and traffic signals • Mode Shift • Bus Rapid Transit • Transit signal priority • Real-time transit info

  18. ICM Demonstration Schedule Dallas San Diego Project Kick-off Jan 2010 Draft PMP & SEMP Apr 2010 Refinement of SyRS Jan 2010 – Apr 2010 On-Site Walk-through 8-12 Mar 2010 System Design Mar 2010 – Dec 2010 System Build Jun 2010 – Aug 2011 System Testing May 2011 – Sep 2011 Training May 2011 – Oct 2011 System O&M Sep 2011 – Apr 2013 Operations Go Live Sep 2011 AMS May 2010 – Aug 2013 Evaluation May 2010 – Aug 2013 Outreach May 2010 – Aug 2013 • Project Kick-off Jan 2010 • Draft PMP & SEMP Mar 2010 • Refinement of SyRS Jan 2010 – Apr 2010 • On-site Walk-through 5-9 Apr 2010 • System Design Apr 2010 – Dec 2010 • System Build Dec 2010 – Oct 2011 • System Testing Dec 2010 – Dec 2011 • Training Dec 2010 – Oct 2011 • System O&M Jan 2012 – Jul 2013 • Operations Go Live Jan 2012 • AMS Jun 2010 – Oct 2013 • Evaluation Jun 2010 – Sep 2013 • Outreach Dec 2010 – Apr 2013

  19. ICM Knowledge and Technology Transfer Equip corridor managers and operators across the country to implement and use ICM – Transferability.

  20. Searchable/Browseable: “ICM Knowledgebase” • Resources Available Now in the ICM Knowledgebase: • Pioneer site CONOPs and Requirements Documents • AMS Resources and Findings • Technical Integration/Data Gap Technical Resources • Lessons-Learned from ICM Pioneer Sites • KTT Resources Coming Soon: • Pioneer Site Webinars and peer exchanges • New fact sheets • Resource guidance documents • Visit the ICM Knowledgebase • At http://www.its.dot.gov/icms/index.htm • Or google “ICM, USDOT”

  21. Next Steps • AMS • Preliminary AMS results – Spring 2010 • Final AMS results – Summer 2010 • Demonstrations and Evaluation • Commence demonstration stage – January 2010 • Select independent evaluator – Spring 2010 • Complete design and deployment / commence operations– January 2012 • Complete demonstration stage – 2013

  22. USDOT ICM Core Team • Dale Thompson • Transportation Research Specialist • Office of Operations Research and Development • Federal Highway Administration • 202-493-3420 • dale.thompson@dot.gov Brian Cronin Team Leader, ITS Research and Demonstration Research and Innovative Technology Administration 202-366-8841 brian.cronin@dot.gov • Bob Sheehan • Transportation Specialist • Office of Operations – Transportation Management • Federal Highway Administration • 202-366-6817 • robert.sheehan@dot.gov • Steve Mortensen • Senior ITS Engineer • Office of Research, Demonstration and Innovation • Federal Transit Administration • 202-493-0459 • steven.mortensen@dot.gov