SMED principles applied to Formula 1 racing. MGMT 6650 8 August 2013. 2013 Malaysian Grand Prix pit-stop 1. What is SMED?. S ingle- M inute E xchange of D ie

Download Presentation

SMED principles applied to Formula 1 racing

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.

- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript

Smed principles applied to formula 1 racing

SMED principlesapplied to Formula 1 racing

MGMT 6650

8 August 2013

2013 malaysian grand prix pit stop 1

2013 Malaysian Grand Prix pit-stop1

What is smed

What is SMED?

  • Single-Minute Exchange of Die

  • is one of the many lean production methods for reducing waste in a manufacturing process. It provides a rapid and efficient way of converting a manufacturing process from running the current product to running the next product.2

Smed value to business 3

SMED value to business3

  • Economic Order Quantity

  • Historically maximize production count to keep unit overhead cost low.

  • High production counts create inefficiencies in other areas.

  • SMED allows smaller production runs while retaining low unit cost.

  • SMED supports just-in-time inventory.

Toyota background 4

Toyota background4

  • Shigeo Shingo - Toyota Production System, SMED

  • Changing multi-ton precision dies on vehicle body transfer-stamping machines took anywhere from 12 to 36 hours to complete.

  • By applying SMED PrinciplesToyota reduced changeover time to less than 10 minutes.

  • Creating an EOQ of less than 1 car.

Smed 8 techniques for consideration 5

SMED 8 techniques for consideration5

  • Separate internal from external operations

  • Convert internal items to external items

  • Standardize the function, not the shape

  • Eliminate fasteners or use functional clamps

  • Use intermediate jigs

  • Adopt paralleloperations

  • Eliminate adjustments

  • Use mechanization

Smed 7 reduction steps 6

SMED 7 Reduction steps6

Observation (A)

Separation (B)

Conversion (C)

Simplification on internal (D) focus on fixings

Standardization of external activities(D) similar scale to internal



Key observations for improvement 7

Key observations for improvement7

  • shortages, mistakes, inadequate verification of equipment causing delays and can be avoided by check tables, especially visual ones, and setup on an intermediary jig

  • inadequate or incomplete repairs to equipment causing rework and delays

  • optimization for least work as opposed to least delay

  • unheated molds which require several wasted 'tests' before operating temperature to work

  • using slow precise adjustment equipment for the large coarse part of adjustment

  • lack of visual lines or benchmarks for part placement on the equipment

  • forcing a changeover between different raw materials when a continuous feed, or near equivalent, is possible

  • lack of functional standardization, that is standardization of only the parts necessary for setup e.g. all bolts use same size spanner, die grip points are in the same place on all dies

  • significant operator movement around the equipment during setup

  • more attachment points than actually required for the forces to be constrained

  • attachment points that take more than one turn to fasten

  • any adjustments after initial setup

  • any use of experts during setup

  • any adjustments of assisting tools such as guides or switches

Smed techniques in action

SMED Techniques in action

  • Separate internal from external operations

    • Tools, tires, crew ready to go

  • Convert internal items to external items

    • Captive wheel-nut

  • Standardize the function, not the shape

    • Each crew has specialized task

  • Eliminate fasteners or Use functional clamps

    • Single wheel-nut

    • Minimal threads

  • Use intermediate jigs

    • Alignment tape with position marks

  • Adopt paralleloperations

    • 4 teams – 4 tires, other activities

  • Eliminate adjustments

    • Pre-calibrated air guns

  • Use Mechanization

    • Air guns with backup

    • Jacks

2011 monaco grand prix 8

2011 Monaco Grand Prix8

Art of pit stop 9

Art of Pit stop9

  • By Infiniti Red Bull Racing

  • Timing: 00:00:02.05

Record breaking pit stop team

Record Breaking Pit-stop team

Smed principles applied to formula 1 racing

Q & A



2012 championship prize

2012 Championship prize