ERP Status Overview - PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on

ERP Status Overview. Steve Gigliotti Chief, Division of Safety Coal Mine Safety & Health. Overview. Number of approved ERPs Number of installed systems. C&T Inspection Procedures. PIL being drafted Compliance with ERP PPL P09-V-01 Qs & As System components Part 23 approved

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' ERP Status Overview' - mark-lynch


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Erp status overview

ERP Status Overview

Steve Gigliotti

Chief, Division of Safety

Coal Mine Safety & Health


Overview
Overview

  • Number of approved ERPs

  • Number of installed systems


C t inspection procedures
C&T Inspection Procedures

  • PIL being drafted

    • Compliance with ERP

    • PPL P09-V-01

    • Qs & As

    • System components Part 23 approved

    • Verify C&T system is operational by randomly communicating during inspection and comparing route of travel with electronic records on the surface


C t inspection procedures1
C&T Inspection Procedures

  • Responsible person on surface to monitor location of miners underground (75.1600-1)

  • Two way communication inside RA (75.1600-3)

  • Identifying number on miner’s brass tag worn on belt matches identifying number in system (75.1715)

  • Minimum safe distance to prevent interference with blasting circuits (75.1323(a))

  • C&T systems shall remain operational during fan stoppages or a mine power outage (75.313)


Overview1
Overview

- Consolidate Q&A documents for next round of ERPs