SC B5 – Protection and Automation. Presidente: G. J. Amantegui (SP) Segretario: Iony Patriota (BR). Scopo …

mariah
Download Presentation

Scopo …

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC B5 – Protection and Automation Presidente: G. J. Amantegui (SP) Segretario: Iony Patriota (BR) Scopo … • To facilitate and promote the progress of engineering and the international exchange of information and knowledge concerning principles, design, applications, coordination, performance and asset management of System Protection, Substation Control and Automation, Remote Control Systems and Equipment, Metering Systems and Equipment. • Membership • 24 membri regolari • 13 membri osservatori • Membro italiano: G. Vianello(giuseppe.vianello@terna.it) SC website:www.cigre-b5.org

  2. SC B5 – Risultati principali della Conferenza • Impact of IEC 61850-9-2 process bus on protection and substation automation systems (39 contributi) - discussi i problemi: accesso al sistema per le prove, concetto di prova, interoperabilità ancora un obiettivo - implementazione ancora a livello di sviluppo, non di realizzazione • Life Cycle Management of Protection and Control Systems (48 contributi) - Tendenze: ruolo sempre più spinto del software e quindi virtualizzazione e distribuzione di IED; standardizzazione hardware - Necessità : Strumenti per la gestione di modelli, versioni e configurazioni; per la personalizzazione da parte degli utenti (specificazione e prove); per l’accesso remoto (security)

  3. SC B5 – Advisory Groups attivi

  4. SC B5 - Working Groups attivi

  5. SC B5 - Working Groups attivi

  6. SC B5 - Working Groups attivi

  7. SC B5 - Working Groups attivi

  8. SC B5 - Working Groups attivi

  9. SC B5 - Nuove attività e futuri W.Groups • Sono stati decisi i seguenti nuovi W.G. : • “Impact of HVDC on Protection & Control”’ (JWG (SC B5/B4) • Proposta una partecipazione italiana (corrispondente) • “Protection of hybrid line/cable circuits in transmission networks” • ‘‘JWG (B5/D2) Application Guide on digital inter-S/S comm.s for protection’’ (JWG (SC B5/B4) • Proposta una partecipazione italiana (membro regolare) • “Protection requirements on transient response of voltage and current digital acquisition chain’’ • Proposta una partecipazione italiana (corrispondente) • “Standardised protection schemes’’ • Occorre individuare i nominativi dei due membri corrispondenti.

  10. SC B5 - Prossimi meetings • Jeju Island, Korea, colloquium 2009, 19-23 Oct • P.S.: • Protection & Control of FACT devices and impact on Protection Systems • Wide Area Monitoring, Control & Protection Technologies • PS1 - Strategies for the Lifetime Maintenance of SAS Systems • Synopses: entro Feb 2009 • Full papers: entro Giu 2009 • Tutorial Topic: • Experience in the protection of multi-circuit & multi-terminal lines and power transformers

  11. Notizie aggiuntive del regular meeting • JWC B5/D2 – E’ stata proposta una common session (Parigi 2010) sul tema ‘’Practical implementation of IEC 61850 in electric power systems” • Advantages for implementation outside the substation • Impact on Substation Automation (security, WiFi, teleprotection requirements) • Architecture and Information Technology aspects between Substation Automation and Remote Communication • Communication needs for System Protection Schemes an Wide Area Measurements

  12. SC B5 -Soggetti preferenziali per la Sessione 2010 • APPROVATI • Protection Control & Monitoring Beyond 2015 - allocation of P&C funcs– architecture of SAS - new concepts -new requirements –recording • Impact of renewable energy sources and new generation on protection and automation of substations • (WG34) – controlled islanding – impact on WAP & SIPS - connection protection -IEC 61850 on generator protection – • restoration policies – distribution protection