Development of a FLC Model for Predicting Schedule Impacted by Change Orders in Construction Projects

Development of a FLC Model for Predicting Schedule Impacted by Change Orders in Construction Projects. Jieh-Haur Chen Dec. 14 2001. Introduction. Problem Statement Change orders cause schedule problems raising disputes in construction projects. Methodology

mariah
Download Presentation

Development of a FLC Model for Predicting Schedule Impacted by Change Orders in Construction Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of a FLC Model for Predicting Schedule Impacted by Change Orders in Construction Projects Jieh-Haur Chen Dec. 14 2001

  2. Introduction • Problem Statement • Change orders cause schedule problems raising disputes in construction projects. • Methodology • Find the correlation in historical data. This correlation will be used in establishing a mathematical model, fuzzification, and fuzzy control rules. • Use fuzzy approach to predict and measure construction schedules being impacted by change orders.

  3. Data Analysis • Mechanical and electrical contractors’ roles

  4. Data Analysis • Project Type

  5. Data Analysis • Percent of Change • Public vs. Private (46% vs. 54%) • Distribution of the Percent Change

  6. Data Analysis • Reasons of Change Orders

  7. FLC Model • 5 state variables • Role, Project type, % Change, Feature, And Reasons

  8. Discussion and Future Work • Predicted Schedule = • Yet to process the FLC model successfully. • Fuzzification • Fuzzy rules