ARC Closing Report. Authors:. Date: 2013-03-20. Abstract. This document is the closing report for ARC SC, March 2013, Orlando meeting. Work Completed. IETF/802 coordination Reviewed RFC 4441 update. Trying to balance between redundant with CBPs versus enough information here.

malo
Download Presentation

ARC Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARC Closing Report Authors: Date: 2013-03-20 Mark Hamilton, Spectralink, Corp.

  2. Abstract This document is the closing report for ARC SC, March 2013, Orlando meeting Mark Hamilton, Spectralink, Corp.

  3. Work Completed • IETF/802 coordination • Reviewed RFC 4441 update. Trying to balance between redundant with CBPs versus enough information here. • Still open for comments – please get comments to Dorothy Stanley • Also, Operations Area working group has gotten submissions on CAPWAP, and will be considering. • Brief update on General Links (11ak) and 802.1 bridging discussions • Most presentations will be in Thursday AM1 joint session • Looks like changes are needed in 802.1AC, which will need a PAR • 802 Overview and Architecture Draft 1.6 sponsor ballot • Ballot deadline extended to Mar 22. Some comments addressed this week, more on telecons. • Reviewed 802.11 section (Annex B.2) and comments submitted. Noted that PLCP/PMD split is being removed from 802.11, so need to describe potential changes in our architecture pictures Mark Hamilton, Spectralink, Corp.

  4. Work Completed (cont) • Architecture of APs/DS/Portals, and 802.1 concepts • Reviewed submission: https://mentor.ieee.org/802.11/dcn/13/11-13-0115-03-0arc-considerations-on-ap-architectural-models.doc • Agreed 802.11 Figure 5-1 (MAC data plane architecture) has issues and confusing parts. Started work toward a proposed replacement. • Need to get clarification on all (architectural) interface points within 802.11 specification – all MAC-SAPs (are there more than one?), etc. Minutes are in 11-13/0367r0 Teleconferences: • None expected, if needed, will schedule with 10 days notice Mark Hamilton, Spectralink, Corp.

  5. May 2013 Goals • One regular meeting slot planned: • Continue discussion on architectural model for AP (and DS and Portal) and where MAC-SAP interface(s) appear, and how this relates to the 802.1 concepts • 802 O&A sponsor ballot, as appropriate • IETF/802 RFC 4441, as appropriate • One joint meeting slot with TGak • Discussion on 802.11 architectural concepts related to 802 bridging capabilities Mark Hamilton, Spectralink, Corp.