Operation management mgm 4147 group 5
Download
1 / 19

OPERATION MANAGEMENT MGM 4147 (Group 5) - PowerPoint PPT Presentation


  • 96 Views
  • Uploaded on

UNIVERSITI PUTRA MALAYSIA. OPERATION MANAGEMENT MGM 4147 (Group 5). HING YIAP KNITTING INDUSTRIES BERHAD. KEE LAI SIEN 121047 MOHD HASIF BIN ABDUL RAHMAN 133607 OOI SOON SEONG 130778 CIK SANISAH BTE SALEH 121039. OUTLINES. Company Background Fabric Process Fabric- Process Design

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' OPERATION MANAGEMENT MGM 4147 (Group 5)' - malina


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Operation management mgm 4147 group 5

UNIVERSITI PUTRA MALAYSIA

OPERATION MANAGEMENTMGM 4147(Group 5)

HING YIAP KNITTING

INDUSTRIES BERHAD

KEE LAI SIEN 121047 MOHD HASIF BIN ABDUL RAHMAN 133607

OOI SOON SEONG 130778 CIK SANISAH BTE SALEH 121039


Outlines
OUTLINES

  • Company Background

  • Fabric Process

  • Fabric- Process Design

  • Fabric- Facility Layout

  • Reliability

  • Conclusion


Company backgroud
COMPANY BACKGROUD

  • Established in 1970

  • The principal activities

    • Manufacturing fabric

  • MS ISO 9001:2000 Quality Management Systems Certification


Company backgroud1
COMPANY BACKGROUD

Hing Yiap Knitting Industries Berhad

(Parent company)

Subsidiaries

Hing Yiap Trading Sdn Bhd

(Wholesaling of ready-made garments and fabrics)

Antioni Sdn Bhd

(sports-inspired fashion)

VFUSA Marketing

(young women’s lingerie)

BUMCITY Sdn Bhd

(a specialty lifestyle chain-store targeting teenagers and young adults)

Diesel Marketing Sdn Bhd

(street fashion),

B.U.M. Marketing (Malaysia) Sdn Bhd

(“B.U.M. EQUIPMENT” )

Bontton Sdn Bhd

(casual wear)


Fabric process assembly line work flow

IN

Raw fibers

(Cotton)

Cleaning

Carding

Roving

Drawing

Combing

Spinning

Knitting

(Yarn)

Fabric

OUT

FABRIC PROCESSAssembly Line Work Flow

Source: HING YIAP KNITTING INDUSTRIES BERHAD


Cleaning

Carding


Combing

Drawing


fibers

Roving

Roving

Spinning





Outline 3
OUTLINE 3

Fabric- Facility Layout


Types of facility layout
TYPES OF FACILITY LAYOUT

BASIC

  • Process

  • Product

  • Fixed-Position

    HYBRID

  • Flexible Manufacturing systems

  • Cellular

  • Mixed-model assembly lines



Outline 4
OUTLINE 4

Reliability

Refers to the ability of …

  • product

  • part

  • or system

    To perform its intended function under certain set of conditions


Quality measurements
QUALITY MEASUREMENTS

  • WEIGHT

  • Defect(Missing Warp, Reed Marks, Hole & Dark Yarn)

  • Width

  • Strength

  • Elongation

  • Pilling Resistance

  • Lightness (Color) Measurement

  • Cleanliness

HING YIAP KNITTING INDUSTRIES BERHAD determine their productivity based on weight


Step 1 calculation

1

1

.998

1

1.006

1

Step 1 : Calculation

Actual weight of output

Design weight of output


Reliability for weight

= average of percentage in the control range

= 100%+100%+100%+100%+100%+100% 6

= 100%

Step 2:

Find the percentage of output weight fulfills the requirement

As long as all the actual output (Weight) falls within the range, it considered as 100% of reliability

Range 0.998 – 1.006


Conclusion
CONCLUSION

HING YIAP KNITTING INDUSTIES BERHAD

(100% Cotton Fabric)

  • CONTINUOUS FLOW

  • PRODUCT LAYOUT

  • RELIABILITY = 100%

Thank You


ad