1 / 25

Advanced Renewable Tariffs

Power Procurement in British Columbia. Advanced Renewable Tariffs. Thomas Vlcek – Royal Roads University MBA. This presentation will cover: BC’s Electricity Deficit Mechanisms of support for renewable electricity Quota versus Feed-in models BC tender results Feed in tariff results.

malaya
Download Presentation

Advanced Renewable Tariffs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power Procurement in British Columbia Advanced Renewable Tariffs Thomas Vlcek – Royal Roads University MBA

  2. This presentation will cover: • BC’s Electricity Deficit • Mechanisms of support for renewable electricity • Quota versus Feed-in models • BC tender results • Feed in tariff results

  3. BC’s Electricity Supply Outlook Source: BC Hydro, “2006 Integrated Electricity Plan,” (Vancouver: BC Hydro, 2006), p.3.

  4. A Looming Power Crunch Demand for electricity in BC is beginning to outstrip heritage supply • BC Hydro a net importer since 2001 • Projected shortfall of nearly 20,000 GWh by 2025. Source: BC Hydro 2006 IEP.

  5. Imports by Resource Type Source: BC Hydro Company Web site, accessed February 2006.

  6. BC Energy Plans 2002 Plan’s four main objectives: • Continued low electricity rates • Secure and reliable supply • Private sector investment, jobs • Environmentally responsible development. 2007 Energy Plan • Self-sufficiency by 2016 • Zero net GHG emissions from new electricity generation

  7. Mechanisms for Supporting Renewables 1.Quota obligation/Tender: Quantity fixed, market determines price 2.Feed-in Laws: Fixed Price, market determines quantity

  8. Tender Process in BC BC Hydro has issued Calls for Power since the late 1980’s: • 2001-02 Green Call • 2002 Customer-based Generation Call • 2002-03 Green Call • Vancouver Island Call for Tender (VICFT) • 2006 Open Call for Power

  9. CFP Project Status Results of BC Hydro CFP Between 2001 and 2006

  10. CFP Resource Mix Share of BC Hydro EPA’s by Resource Since 2001/02

  11. Issues with the Tender Process in BC Reasons for Attrition: • Licensing and regulation, cost • Financial hurdles, pursuit of lowest price • Transmission expense/economies of scale • Delivery shortfalls/liquidated damages Other issues: • Exclusion of smaller, community developers • Lack of technological/resource diversity

  12. So What are Advanced Renewable Tariffs? Basics: • Fixed minimum price paid to suppliers of renewable electricity • Long term contracts lasting 20 years • Guaranteed non-discriminatory access to electricity grid • Cost of tariff borne by all consumers based on level of use

  13. Dissemination of Alternatives Obligation or Quota Model • Employed in 38 countries worldwide • Renewable Obligation – RO (UK) • Renewable Portfolio Standard – RPS (USA) • Mandatory Renewable Energy Target (Australia) Feed in Tariffs • Employed in 41 countries worldwide (2006) • Western/Eastern Europe, Asia • Introduced in Ontario in 2006 (SOC)

  14. Renewable Tariff Design Key components: • Simple and transparent • Simplified Interconnection • Prices sufficient to drive development • Contract lengths sufficient for profitability • Prices differentiated by technology • Prices differentiated by resource • Limit on project size but no program cap.

  15. Level of Feed in Tariffs

  16. ARTs in Europe 2005 Europe has more than 50% of the world’s wind capacity

  17. Wind Energy in Germany

  18. ARTs in Europe 2005 Germany has developed nearly 40% of world PV capacity

  19. Solar PV in Germany

  20. Benefits of ARTs • Pay only for generation • Increased program flexibility • Lessens Pressure to Get Prices Right the First Time • Reduced development risk • Contract equals collateral • Distributed generation • Tiered tariffs distribute development, add security • Reduced pressure on best sites • Profitability Still Higher at Windy Sites • Reduced NIMBYism • By Enabling Greater Participation • By Reducing Concentrations

  21. Standard Offer Contracts in Ontario Ontario adopted SOC for projects <10MW in 2006 Anticipated benefits: • Improved efficiency through reduced line losses • Improved reliability and stability of the electricity system • Increased rural investment • Creation of skilled jobs • Cleaner air • Greater public acceptance of renewable energy

  22. Standard Offer Prices Source: OSEA

  23. Cost of ARTs in BC

  24. Conclusion • Tender model has not delivered in BC • ARTs are the best mechanism for delivering large amounts of RE, • Quick, affordable and distributed • BC Hydro/Utilities Commission need to explore alternatives to CFP.

  25. Thank-you for your time… Questions?

More Related