Analysis of Targeted Emission-Reduction Possibilities in the Paso del Norte (Ciudad Juárez ). Victor Valenzuela ( TCEQ ) Jose Mares ( UACJ ) Arturo Woocay ( ITCJ ) Wen-Whai Li ( UTEP ). Four Source Categories Cuatro Categorías de Fuentes. Fugitive PM emissions from unpaved roads

Download Presentation

Analysis of Targeted Emission-Reduction Possibilities in the Paso del Norte (Ciudad Juárez )

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Analysis of targeted emission reduction possibilities in the paso del norte ciudad ju rez

Analysis of Targeted Emission-Reduction Possibilities in the Paso del Norte (Ciudad Juárez)

Victor Valenzuela (TCEQ)

Jose Mares (UACJ)

Arturo Woocay (ITCJ)

Wen-Whai Li (UTEP)


Four source categories cuatro categor as de fuentes

Four Source CategoriesCuatro Categorías de Fuentes

  • Fugitive PM emissions from unpaved roads

  • Fugitive PM emissions from a cement plant

  • VOC emissions from gasoline fueling stations

  • VOC emissions from automotive paint and body shops

  • Emisiones fugitivas de PM relacionadas a caminos no pavimentados

  • Emisiones fugitivas de PM originadas en una planta cementera

  • Emisiones de compuestos orgánicos volátiles en estaciones de gasolina

  • Emisiones de compuestos orgánicos volátiles en talleres de pintura y reparación de automóviles


Pm emission form unpaved roads in ciudad ju rez

PM Emission form Unpaved Roads in Ciudad Juárez

  • Objetivo:

  • Desarrollar una estimación de la contribución de las emisiones de PM al media ambiente como resultado de el trafico vehicular en caminos no pavimentados de Cuidad Juárez y estimar el costo de pavimentarlos y mantenerlos.

Objective:

Develop an estimate of PM contributions to ambient air as a result of traffic on unpaved roads in Cuidad Juarez and estimate the cost of paving and maintaining such roads.


Tasks tareas

Tasks / Tareas

  • Desarrollar un inventario de emisiones de caminos no pavimentados de Cuidad Juárez.

  • Presentar gráficamente todos los caminos no pavimentados de Cuidad Juárez.

  • Determinar el contenido de carga de limo y humedad en los caminos no pavimentados.

  • Desarrolla estimaciones de las emisiones de los caminos no pavimentados

  • Desarrollar costos estimados para pavimentar y mantener los caminos actualmente sin pavimentar.

  • Develop an inventory of unpaved roads in Cuidad Juárez.

  • Graphically present all unpaved roads in CuidadJuárez.

  • Determine the silt loading content and soil moisture on unpaved roads.

  • Develop emission estimates for the unpaved roads.

  • Develop cost estimates for paving and maintaining the unpaved roads identified.


Unpaved roads inventory caminos no pavimentados

Unpaved Roads Inventory / Caminos No Pavimentados

Source: Adapted from IMIP, 2012 and UACJ, 2012


Silt loading c ontent and soil moisture carga de limo y contenido de humedad

Silt Loading Content and Soil Moisture / Carga de Limo y Contenido de Humedad

  • Soil sampling

  • 10 proposed soil sampling sites

  • 4 soil types

    • Alluvial

    • Sandstones

    • Conglomerate

    • Eolic

Source: Adapted from IMIP, 2012 and UACJ, 2012


Proposed sampling sites sitios propuestos de muestreo

Proposed Sampling Sites / SitiosPropuestos de Muestreo


Soil sampling method m todo de muestreo

Soil Sampling Method /Método de Muestreo

Unpaved roads

  • Use a 25x25 cm frame and collect loose material with a plastic scoop to a maximum depth of 2 cm.

  • Deposit the content into buckets sealed to preserve the moisture.

  • Collect >10% duplicate samples

  • Randomly selected sampling spots at a location using established procedures (using create random tool in ArcGIS)


Soil sampling method m todo de muestreo cont

Soil Sampling Method /Método de Muestreo (Cont)

  • Buckets, brooms and dustpans are to be marked with site number.

  • Disposable plastic gloves are to be worn to prevent contamination of the samples

  • Procedures described by US EPA AP-42 Compilation of air pollutant emission factors, Appendixes C-1 and C-2 are to be followed.


Emissions from unpaved roads

Emissions from Unpaved Roads

  • The emission factors will be estimated following the algorithm suggested in Chapter 13 Section 13.2.2 of the AP-42.


Wind erosion

Wind Erosion

  • For estimating emissions from wind erosion of surfaces the following equation will be used.


Information to be acquired informaci n que se necesita

Informationtobe Acquired / Información que se Necesita

A complete transportation network that contains the following information.

  • Capacity of the roads

  • Average speed

  • Number of lanes

  • Origin-destination matrix

  • TransCAD output file if available

La red de transporte completa que contenga la siguiente información.

  • Capacidad de las calles

  • Velocidad promedio

  • Numero de carriles

  • Matriz de origen-destino

  • Archivo de salida de TransCAD disponible


Pm emission from the ciudad ju rez cement plant

PM Emission from the Ciudad Juárez Cement Plant

Objectives:

Develop an estimate of emission from all PM generating processes at the combined quarry and rock-crushing facility and estimate possible reduction in PM emission considering operational modifications as control strategies.

Objetivos:

Desarrollar una estimación de las emisiones de PM debido a todos los procesos que las generen en las instalaciones de la cementera y estimar las posibles reducciones en emisiones de PM considerando estrategias de control como modificaciones operacionales


Tasks tareas1

Tasks / Tareas

  • Documentar las operaciones de producción y procesado de las instalaciones.

  • Determinar el contenido de carga de limo y humedad en la cementera.

  • Desarrollar una estimación de las emisiones de la cementera.

  • Desarrollar medidas de control de emisiones de PM para las instalaciones.

  • Estimar la reducción en emisiones de PM debido a las estrategias de control.

  • Document the facility’s production and processing operations.

  • Determine the silt loading content and soil moisture at cement plant.

  • Develop emission estimates for the cement plant.

  • Develop PM emission control measures for the facility.

  • Estimate the reduction in PM emission due to control strategies.


Information to be acquired informaci n que se necesita1

Informationtobe Acquired / Información que se Necesita

  • Acquire production volumes.

  • Adquirir los volúmenes de producción.


Information to be acquired informaci n que se necesita cont

Informationtobe Acquired / Información que se Necesita (Cont)

  • Develop inventory of activities considered to be sources of PM emissions, including:

    • (1) quarrying and crushing; (2) raw material preparation, handling and storage; (3) grinding and blending; (4) scalping/screening; (5) finish grinding; (6) washing/scrubbing; (7) packaging and loading; (8) onsite transportation on unpaved surface; and (9) dust emission control practices.

  • Desarrollar un inventario de actividades consideradas como fuentes emisoras de PM, incluyendo:

    • (1) extracción y molido; (2) preparación, manejo y almacenamiento de materia prima; (3) molido y mezclado; (4) colado/mallado; (5) pulido final; (6) lavado/tallado; (7) empaquetado y embarque; (8) transporte en sitio sobre calles no pavimentadas; y(9) practicas de control de emisión de polvo.


Information to be acquired informaci n que se necesita cont1

Informationtobe Acquired / Información que se Necesita (Cont)

  • The number, size, frequency, and route of each piece of equipment used in the all activities listed above need to be documented.

  • El numero, tamaño, frecuencia y ruta de cada pieza de equipo utilizada en todas las actividades anteriormente mencionadas, necesitan ser documentadas.


Information to be acquired informaci n que se necesita cont2

Informationtobe Acquired / Información que se Necesita (Cont)