SEMINAR ON I.O.C.L. COMPLEX REFINERY PANIPAT,(HARYANA). Submitted to- Submitted by- Mr. SUNIL GUPTA GAURAV GUPTA (H.O.D. ELECTRICAL) ELECTRICAL ENG.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' SEMINAR ON I.O.C.L. COMPLEX REFINERY PANIPAT,(HARYANA)' - madison


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Seminar on i o c l complex refinery panipat haryana
SEMINARONI.O.C.L. COMPLEX REFINERYPANIPAT,(HARYANA)

Submitted to- Submitted by-

Mr. SUNIL GUPTA GAURAV GUPTA

(H.O.D. ELECTRICAL) ELECTRICAL ENG.

Mr. NARENDRA JAT IV YEAR (VII)SEM

(LECTURER)


PANIPAT

REFINERY


About i o c l

ABOUT I.O.C.L.

.

IOCL is the India’s flagship national oil company.

IOCL is the 18th largest co. in the world & the no. 1 Petroleum trading co. in Asia Pacific Region.

IOCL is the top ranked co. among both private & public sectors at 116th position in the worldwide list.


Guwahati

Barauni

Gujarat

Panipat

7th Refinery of Indian Oil

Haldia

Digboi

Mathura


About panipat refinery

ABOUT PANIPAT REFINERY

Panipat Refinery is the 7th refinery of Indian oil .

The originol refinery with 6 MMTPA capacity was built and commissioned in 1998.

At a time its capacity is 12 MMTPA & and 12 to 15 mmtpa is in progres.

The cost of the refinery’s construction was Rs 9024 crores .


  • It recives crude oil through the Chaksu-Kamal branch pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

  • Panipat refinery meets demands of petroleum pruducts not only of Haryana but also the entire Northwest


CRUDE OIL PIPELINE pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

Panipat

New Delhi

Chaksu

Mathura

Abu Road

Kandla

Viramgam

Vadodara

Salaya


  • MAJOR PRODUCTS OF PANIPAT REFINERY pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

  • Liquefied Petrolem Gas (LPG)

  • Naphtha

  • Motor Spirit

  • Superior Keroseen Oil (SKO)

  • High Speed Diesel (HSD)

  • Aviation Turbine Fuel (ATF)

  • 80 MT Gasoline

  • Bitumen

  • Sulphur


Products from Refinery pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

96 RON GASOLINE

LPG

NAPHTHA

BITUMEN

MOTOR SPIRIT

SULPHUR

HEAVY PETROLEUM STOCK

ATF

SKO

HSD


ABOUT pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.ELECTRICALIn the electrical field there have CAPTIVE POWER PLANT .Captive Power Plant :- In this power plant generated power is used to themself.*Refinery captive power plant generation capacity is 225 MW .*There have three steam turbine & five gas turbine generator are used for all refinery & refinery township.


*There is 132kv,grid by pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.HARYANA ELECTRICITYBOARD as stand by source.

  • SOURCE OF ELECTRIC POWER IN REFINERY

  • STG 1x3 25x3 75 MW

  • GTG 1x5 30x5 150 MW

  • 3. HSEB 132-KV

  • (HARYANA ELECTRICITY BOARD)


STEAM TURBINE GENERATOR pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

The Requirements Are :-

  • D.M. PLANT

  • AIR

  • FUEL

  • BOILERS

  • TURBINES

  • GENERATORS

  • CONDENSOR

  • EJECTOR

  • HIGH PRESSURE HEATER

  • DEAREATOR


BOILER pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

ECONOMISER

GEN

TURBINE

H.P. HEATER

CONDENSER

C.E.P.

L.P. HEATER

B.F.P.

DEAREATER

Basic Idea Of Steam Turbine Generator


  • STEAM TURBINE TECHNICAL DATA pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

  • Max. Continuous rating KW 25,000

  • Most economical rating KW 25,000

  • Zero extraction rating KW NA

  • Turbine normal speed RPM 3,000

  • Turbine trip speed RPM 3,300

  • Direction of rotation Facing Clock Wise


Specifications of Steam Generator pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

  • Active Power = 25 MW

  • Apparent Power = 31.25 MVA

  • Voltage = 11000 Volts

  • Current = 1640 Amps

  • P. F. = 0.8 lag

  • Speed = 3000 RPM

  • Frequency = 50 Hz

  • Connection of Stator Winding = Y

  • Unbalance Loading = 10 % Continuous

  • Field Current for Rated Output = 633 Amps

  • No Load Field Current = 226 Amps

  • Generator Type = TART 750-24 P

  • No. of Turbo generator Sets = 3


Gas Turbine Generator pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

The Requirements Are:-

  • Air (Dust free)

  • Fuel

  • Combustion

  • Axial flow compressor

  • Nozzles

  • Spark plug

  • Turbines

  • Generators


SIMPAL CYCLE OF GAS TURBINE GENERATOR pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

GT EXHAUST

FUEL

COMBUTION

GENERATOR

TURBINE

COMPRESSOR

INLET

AIR

EFFICIENCY 28% TO 34%

R Y B


OPEN DIAGRAM OF GAS TURBINE pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.


132 KV SWITCH YARD pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.

It has five incoming bays:-

  • Bay-1 for 132kv Startup Transformer-1

  • Bay-2 for 132kv line 1 from Panipat

  • Bay-3 for 132kv line 2 from Munak

  • Bay-4 for 132kv Bus coupler.

  • Bay-5 for 132kv Startup Transformer-2


132 KV SWITCH YARD pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.


THANKS….. pipeline of the Salaya-Mathura pipeline Vadinar Gujrat coast to Panipat through a 1,339km long pipelines.