THEMIS Mission Integration Working Group (MIWG) #7 Ground Operations Working Group (GOWG) #5 Delta - Ground Operations Review (GOR). November 29, 2006 KARS Park, KSC, Florida Hosts: Garrett Skrobot, NASA Mission Manager (MM)

Download Presentation

THEMIS Mission Integration Working Group (MIWG) #7 Ground Operations Working Group (GOWG) #5

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Themis mission integration working group miwg 7 ground operations working group gowg 5

THEMISMission Integration Working Group (MIWG) #7

Ground Operations Working Group (GOWG) #5

Delta - Ground Operations Review (GOR)

November 29, 2006

KARS Park, KSC, Florida

Hosts: Garrett Skrobot, NASA Mission Manager (MM)

William Van Dyke, NASA Launch Site Integration Manager (LSIM)


Agenda november 29 2006 meet me number 1 877 991 5876 passcode 698067

AgendaNovember 29, 2006 Meet-Me-Number: 1-877-991-5876  Passcode: 698067#

MISSION INTEGRATION WORKING GROUP (MIWG) #7

  • THEMIS Project StatusP. Harvey/UCB

    • Payload Schedule Update (Astrotech and Launch Site Schedules)

  • Delta Program StatusL. Loucks/Boeing

    • LV Hardware Status

    • Program Issues

  • Mission Integration StatusL. Loucks/Boeing

    • Integration Schedule

    • Requirements Verification Matrix

    • SCN Review

    • Release of ICD Rev A

    • Action Item Review

  • Launch Site Integration Status

    • Side by Side Testing/Ladder Mods/SSS InstallationV. Segall/Boeing

    • Fueling & Procedure StatusC. Davis/NASA

    • Range Status on Required Deliverables & Procedures J. Wethern/45SW


Agenda november 29 2006 meet me number 1 877 991 5876 passcode 6980671

AgendaNovember 29, 2006 Meet-Me-Number: 1-877-991-5876  Passcode: 698067#

MISSION INTEGRATION WORKING GROUP (MIWG) #7 - Continued

  • Analysis ResultsBoeing

    • DTO Update

    • Thermal

    • RF Link Analysis

    • Controls/ACS Gas Budget Update

  • Mobile Telemetry Coverage Boeing/KSC

  • Launch Management UpdateKSC

  • Mission Success OverviewKSC

  • Review Spacecraft Mandatory / Required Launch CriteriaKSC


Agenda november 29 2006 meet me number 1 877 991 5876 passcode 6980672

AgendaNovember 29, 2006Meet-Me-Number: 1-877-991-5876  Passcode: 698067#

GROUND OPERATIONS WORKING GROUP (GOWG) #5/ Delta GOR

  • Astrotech Readiness/IssuesG. Gleeson/ASO FL

  • THEMIS Badging & Training Plan K. Kerr/Analex KSC

  • Launch Site Safety Status/Readiness C. Loftin/NASA Safety

  • Telemetry and Communications Status/ReadinessM. Lougheed/NASA KSC

  • Spacecraft Procedure Status/Review R. Sterling/UCB

  • Launch Site Readiness Poll (Go/No Go)

    • THEMIS ProjectP. Harvey

    • NASA KSC Public AffairsG. Diller

    • Boeing Delta Mission IntegrationV. Segall

    • Astrotech Mission ManagementG. Gleeson

    • NASA LS Telemetry & CommunicaitonsM. Lougheed

    • NASA KSC SafetyC. Loftin

    • NASA LS Launch Site IntegrationW. Van Dyke

    • NASA LS Launch Site Integration BranchF. Stone


  • Login