1 / 26

The FP7 HiLumi LHC Design Study and HL-LHC project

The FP7 HiLumi LHC Design Study and HL-LHC project. Lucio Rossi HL-LHC Project Coordinator – CERN FP7 HiLumi Public Meeting 18 November 2011. Luminosity : educated guess over 10 y. Shut down to fix interconnects and overcome energy limitation (LHC incident of Sept 2008).

madge
Download Presentation

The FP7 HiLumi LHC Design Study and HL-LHC project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The FP7 HiLumi LHC Design Study and HL-LHC project Lucio Rossi HL-LHC Project Coordinator – CERN FP7 HiLumi Public Meeting 18 November 2011

  2. Luminosity: educatedguess over 10 y Shut down to fixinterconnects and overcomeenergy limitation (LHC incident of Sept 2008) Shut down to overcomebeamintensity limitation (collimation, New Cryo P4,…) Inj. upgrade Hdwlimit? LRossi-16Nov2011

  3. The need for the upgrade LS3 LRossi-16Nov2011

  4. High Luminosity LHC (HL-LHC) historyTask force chaired by Francesco Ruggiero in 2001 Plot J. Strait Radiation damage limit ~700 fb-1 Plan luminosity upgrade by 2014. New low-b quads with high gradient and larger aperture based on Nb3Sn SC require 9-10 years for short model R&D and component development, prototyping, and final production. Slidefrom F. Ruggiero , 2004 CERN task force on LHC machine upgrade -> LHC PR 626+666 Luminosity: Lnom=1034 -> 1035, Energy: Ecm=14 TeV -> 25 TeV SC magnet R&D for lumi upgrade also useful for energy upgrade: can be integrated with LHC magnet consolidation. Beam dynamics R&D for LHC commissioning also useful for LHC upgrade: needed to guide new IR design. LRossi-16Nov2011

  5. High Luminosity LHC (HL-LHC) historyLHC construction period • Lhc Accelerator Research Programme, LARP • LARP has given fundamental contribution to the hardware development and to the conceptual study for High Lumi • FP6-CARE • HHH, a newtworkon acceleratorphysics& magnetsdesign • NED Joint ResearchActivity : development of HF Nb3Sn SC • 2007: followingLisbona EU strategy for HEP, White Paper: the split into Phase I and II • Phase I : 21034peakwith120mm-120 T/m MQX for 2013 • Phase II: 101034peak? withNb3Sn MQX for 2020? LRossi-16Nov2011

  6. High Luminosity LHC (HL-LHC) historyLHC commissioning & first operationperiod • Chamonix 2010: Phase for 2016-17 ? Longer thanexpectedshutdown. Limited performance, machine less flexible. • Decision of CERN Mngt, summer 2010 (formalized in Nov.2010) : • Regroup main upgrade for >2020: HL-LHC • 3000 fb-1 in 10-12 yearrun  250 fb-1/y • Peaklumi51034 cm-2s-1  levelling • Start thinking to HE-LHC • WG chaired by Steve Meyer, started March 2010 • Workshop Malta, October 2010 LRossi-16Nov2011

  7. LEP/LHC : the best use of the (renovated) existing infrastructure LHeC ? LRossi-16Nov2011

  8. Cycle in the HL-LHC run 20E+34 pile up heatdeposition in IR and DS other? 150 days of Physics /y of this cycle with 60% efficiencywillgive 250 fb-1 Levelling Which set of parameters weneed to reachthis goal? LRossi-16Nov2011

  9. Tuning of the goal aftersummer Efficiency is defined as the ratio between the annual luminosity target of 250 fb-1 over the potential luminosity that can be reached with an ideal cycle run time with no stop for 150 days: trun= tlev+tdec+tturn. The turnaround time after a beam dump is taken as 5 hours, tdecay is 3 h while tlev depends on the total beam current LRossi-16Nov2011

  10. Our Final Goal: Given by Physics3000 fb-1 in 10-12 year of RUN LRossi-16Nov2011

  11. Many changes : IR Magnets(triplet, D1, D2, MQ4, …) SC CrabCavities, IR Col, New Cryo IP1-IP5, Cold Powering on surface 0.1-1 GW d.c. HTS LRossi-16Nov2011

  12. Opportunity, justwhen HL-LHC started • FP7 Design Study call: deadline 25 Nov 2010 • (experiencewith FP7-sLHC-PP, FP7-EuCARD) • Forming the consortium • 14 Institutes from the EU Research Area • 5from USA, 1 from JP • CalledFP7 HiLumi LHC Grant Agreement 284404 LRossi-16Nov2011

  13. Budget FP7 HiLumi and HL-LHC Perfect score 15/15, ALL request to EU granted Estimatedcost for the thewhole HL-LHC over 10 years in M€ (October 2010) LRossi-16Nov2011

  14. Status of the FP7 DS Grant Agreement signed by EC in October and now by all Beneficiaries First tranche of money (60% of the 4.9 M€) from EU has arrived to CERN, for redistribution Consortium Agreement sent to partner The US labswillpartecipate to FP7 HiLumi as associatepartner (underexisting agreement or with a new MoU LRossi-16Nov2011

  15. Staff for HiLumi LHC (EU FP7) LRossi-16Nov2011

  16. Staff HiLumiwith 377 p-m by US Labs 163 FTE-y LRossi-16Nov2011

  17. The HL composition DS collimation shifted in 2018 Cryo-col + 11 T Dip. isnow in baseline (but it must bedemonstrated SC links gets support fromvarious collaborations Matching section and correctors Collimation Project High Field Magnets R&D Beam Diagnostics HE-LHC Studies Study on HE-LHC getswider support EuCARD2 WP on HTS dipoles Hardware Commissioning LRossi-16Nov2011

  18. Budget under construction • 750 MCHF new evalution M • 1000 FTE-y P • P+M  1000 MCHF (CtC !!!) • For convenienceeachsystem regroupactivitiesunder FP7 HiLumi and outsideit • The StCom (SteeringCommitte, were all WP/System leaders are represented) willalternate meetings restricted to HiLUmi and extended to whole HL. • Wewill not distinguishbetween FP7 beneficiaries (EU+KEK) and US labsexceptwhennecessary FP7 HiLumi Sametechnology, strongsynergy LRossi-16Nov2011

  19. HiLumiis the focal point of 20 years of converging International collaboration • The collaboration wiht US and JP on LHC upgrade startedduring the construction of LHC • EU programs have been instrumental in federating all EU efforts • WithHi-Lumi the coordination makes a stepfurther: fromcoordinated R&D to a commonproject • CERN is not anymore the unique owner, ratheris the motor and cathalizer of a wider effort. • Managedlike a large detector collaboration (with CERN in special position as operator of LHC) LRossi-16Nov2011

  20. Governace HL-LHCFP7 HiLumi LHC DS is the driver of a largerproject, aimed to construction LRossi-16Nov2011

  21. List of WP/SystemsCoordinators WP7 Mach.Protection: J. Wenninger, R. Schmidt (CERN) WP8 Coll-Exp Interface: A. Ball, M. Nessi, H. Burkhart (CERN) Wp9 Cryogenics: L. Tavian, R. van den Weelderen (CERN) WP10 (Energydeposition): F. Cerutti (CERN), N. Mokhoff (FNAL) WP11 : 11 T Dipole : M. Karppinen (CERN, A. Zlobin (FNAL) WP16 : HFM R&D & FRESCA2 dipole G. de Rijk (CERN), F. Kircher (CEA) Saftey, namely RP: S. Roesler (CERN) Resource-Cost-RiskCoordinator : P. Bonnal (CERN) FP7 HiLumi Administrative Manager: S. Stavrev (CERN) Dissemination and outreach : K. Kahle (CERN) L.Rossi-Mngm&TC@HiLumi 17Nov2011

  22. This program and budget to do what? CB of 17 Nov 2011 (yesterday!), message fromPresident of Council, Prof. Spiro: PDR neede in preliminaryform by Oct 2012, endorsed by SAC and MAC, approved by CERN Mngt for Council and HEP strategy Group (final step : Council Bruxelles June 2013) LRossi-16Nov2011

  23. Is itsodifficult? Beamrelated issues… • Beam of > 1 A @ 7TeV (700 Mjoules!!) • Most probablyneed of 25 ns (e-clouds and lessbrightnessformInj): qaultiy of collision vs quantity • Verychallanging AP issues… • Needs of novelopticsschemes (S. Fartouk)  15 cm or lower LRossi-16Nov2011

  24. Is itsodifficult? Magnettechnologyjump • LHC isalreadyverypushed • Passing from 8 T (4 T today!) to 11 T in 2018 in LHC dipole • Passing to 12-13 T in IR Triplet: 140 mm!! • But is the onlyway to be on the pathtoward HE-LHC (15-20 T in 40 mm) LQ , 4 m, 90mm: 11 T HQ, 1 m,120mm: 13T LRossi-16Nov2011

  25. Is itsodifficult? CrabCavity, for p-beamtransverse manipulation atfslevel! LRossi-16Nov2011