Field practice day 23.09.2009
This presentation is the property of its rightful owner.
Sponsored Links
1 / 4

Field practice day 23.09.2009 PowerPoint PPT Presentation


  • 48 Views
  • Uploaded on
  • Presentation posted in: General

Field practice day 23.09.2009. Interface Excavation + Medical Treatment. Fair weather agenda. News Lambda:4 New avalanche probe. Depart Zermatt 08.00 Practice: 09.30 - 12.25 12.25 – 12.45 lunch + 12.45 - 15.40 Arrive Zermatt ca. 16.30. News + using ABS (15 min).

Download Presentation

Field practice day 23.09.2009

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Field practice day 23 09 2009

Field practice day 23.09.2009

Interface Excavation + Medical Treatment

Fair weather agenda

News Lambda:4

New avalanche probe

Depart Zermatt 08.00

Practice:

09.30 - 12.25

12.25 – 12.45 lunch +

12.45 - 15.40

Arrive Zermatt

ca. 16.30

News + using ABS (15 min)

News + using Snowpulse (15 min)

Cell phone-based search S

Daisy Bell

Jelk-Tripod

Topics / post: 35 min each (incl. change)

ABS + Snowpulse 15 min each

News + using LINK

News + using PIEPS

News + using PULSE

News + using Ortovox S1

News + using Tracker2

Agenda modifications possible


Field practice day 23 09 2009

Field practice day 23.09.2009

Interface Excavation + Medical Treatment

Adverse weather agenda (without snow)

News Lambda:4

New avalanche probe

News + using ABS (15 min)

Depart Zermatt 08.00

Practice:

09.00 - 11.55

12.00 - 12.30 lunch +

12.30 - 15.25

Arrive Zermatt

ca. 16.15

News + using Snowpulse (15 min)

Cell phone-based search S

Daisy Bell

Jelk-Tripod

Topics / post: 35 min each (incl. change)

ABS + Snowpulse 15 min each

News + using LINK

News + using PIEPS

News + using PULSE

News + using Ortovox S1

News + using Tracker2

Agenda modifications possible


Field practice day 23 09 2009

Feldtag 23.09.2009

Schnittstelle Freilegung + med. Erstbehandlung

Schönwetterprogramm

Feldarbeit Lambda:4

Neue Lawinensonde

Mobile-/Handy-basierte Suche S

Abfahrt Zermatt 08.00

Felddemo:

09.30 - 12.25

12.25 - 12.45 Lunch +

12.45 - 15.40

Ankunft in Zermatt

ca. 16.30

Neues + Gebrauch ABS (15 min)

Neues + Gebrauch Snowpulse (15 min)

Daisy Bell

Jelk-Dreibein

Pro Posten

ca. 35 min (inkl. Verschiebung)

(ABS + Snowpulse

je 15 min)

Neues + Gebrauch LINK

Neues + GebrauchPIEPS

Neues + GebrauchPULSE

Neues + GebrauchOrtovox S1

Programm-Änderungen vorbehalten

Neues + GebrauchTracker2


Field practice day 23 09 2009

Feldtag 23.09.2009

Schnittstelle Freilegung + med. Erstbehandlung

Schlechtwetterprogramm

(ohne Schnee)

Feldarbeit Lambda:4

Neue Lawinensonde

Abfahrt Zermatt 08.00

Feldarbeit:

09.00 – 11.55

12.00 - 12.30 Lunch +

12.30 – 15.25

Ankunft in Zermatt

ca. 16.15

Mobile-/Handy-basierte Suche S

Neues + Gebrauch ABS (15 min)

Neues + Gebrauch Snowpulse (15 min)

Daisy Bell

Jelk-Dreibein

Pro Posten

ca. 35 min (inkl. Verschiebung)

(ABS + Snowpulse

je 15 min)

Neues + Gebrauch LINK

Neues + GebrauchPIEPS

Neues + GebrauchPULSE

Neues + GebrauchOrtovox S1

Programm-Änderungen vorbehalten

Neues + GebrauchTracker2


  • Login