Presentation to
Download
1 / 16

Presentation to Select Committee on Economic Development Eskom’s Solar Water Heating Programme - PowerPoint PPT Presentation


  • 57 Views
  • Uploaded on

Presentation to Select Committee on Economic Development Eskom’s Solar Water Heating Programme 28 February 2012. Introduction. Government target of 1 million systems installed by end 2014 Approximately 230,000 systems installed through Eskom rebate programme and DORA funded Dx 443.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Presentation to Select Committee on Economic Development Eskom’s Solar Water Heating Programme' - macey-saunders


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Presentation to

Select Committee on Economic Development

Eskom’s Solar Water Heating Programme

28 February 2012


Introduction
Introduction

  • Government target of 1 million systems installed by end 2014

  • Approximately 230,000 systems installed through Eskom rebate programme and DORA funded Dx 443.

  • Balance of 800,000 systems requires roll-out of 22,000 systems per month (approx.)

  • Programme will be overseen by Inter-ministerial Project Steering Committee chaired by Director General for Economic Development






Installations to date
Installations to date

Above graph represents total installations to date, including installations received but not yet processed. This includes Eskom funded (rebate and contracts) and DoE funded (Tshwane, Sol Plaatje and Naledi).


Lessons learnt
Lessons Learnt

  • Electricity savings are low in relation to cost – SWH is for job creation and service delivery

  • Quality of installations not always up to standard – re-work was required in many instances

  • Rigorous process controls are required

  • Contracts for on-going maintenance of low pressure systems are required

  • Safety is non-negotiable

    *SWH – solar water heating



The low pressure rebate programme is to be replaced by a contracting approach
The low pressure rebate programme is to be replaced by a contracting approach

  • Government

    • Job creation and sustainability

    • BBBEE

    • Supplier Development &Localisation

    • Equitable share per province

    • Set aside for co-ops

    • Support for disadvantaged groups/communities

    • Certainty that targets will be met

  • Market Participants

    • Predictability and certainty

    • Finance

  • Implementing Agent

    • Rigorous controls and governance

    • Ensure quality installations

    • System sustainability

    • Safety


Roll out targets
Roll-out targets contracting approach


Key parameters of future roll out
Key parameters of future Roll-Out contracting approach

  • Contracting options

    • Turnkey contracts

    • Separate contracts for the manufacturers and installers

    • Contract with Co-ops

  • Methodology for contract allocation

    • Open tender

    • Conversion of municipal MOU’s into contracts

  • Allocation of systems

    • Completely ‘open’ subject to equitable share across provinces

    • Designated communities / co-ops

    • Allocation process based on local authority submission


Key parameters of future roll out1
Key Parameters Of Future Roll-Out contracting approach

4. Localisation

  • No local content specification

  • Minimum level of local content in systems (Gate Keeper)

  • Weighting in tender evaluation

    5. Sustainability of systems

  • Retention of payments for 3-5 years

  • Guarantees / provisions required

  • Contract for system maintenance in place for installers

  • ‘Carbon’ revenues to be leveraged


System specification and installation requirements
System specification and installation requirements contracting approach

  • Safety - Full compliance to OSHACT and Eskom safety requirements

  • Compliance with National standards, SANS standards

  • Installations only on lower LSM (Iiving standards measure) houses

  • Maximum size 150L

  • SWH systems to carry SABS mark approval

  • If required, roofs to be re-enforced

  • Permanent Water connection at the dwelling

  • Water quality within acceptable parameters


Scope of work for installers
Scope of work for installers contracting approach

  • Installation and maintenance of Solar Water Heaters

  • Development and execution of a 5year maintenance plan

  • Development of installers and execution of training plan

    • Installer training and skills development by approved accredited solar trainer and SETA approved

  • Minimum of 70% of local community labour to be trained and employed for the installation.

  • Quality assurance Management and auditing of SWH System

  • Call centre establishment and operation

  • Progress reporting

  • Database collection and form administration


Thank you

THANK YOU contracting approach

Website: www.eskomidm.co.za