Parsons Road – Old Kimbro Road Bridge Project Travis County, TX . Neighborhood Meeting Wednesday, September 23, 2009. Agenda. WELCOME & INTRODUCTIONSMo Mortazavi, P.E. Travis County PROJECT PRESENTATIONCris Parker, P.E. HDR Engineering, Inc. PARSONS ROAD BRIDGE PROJECT

Download Presentation

Parsons Road – Old Kimbro Road Bridge Project Travis County, TX

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Slide1 l.jpg

Parsons Road – Old Kimbro Road

Bridge Project

Travis County, TX

Neighborhood Meeting

Wednesday, September 23, 2009


Agenda l.jpg

Agenda

  • WELCOME & INTRODUCTIONSMo Mortazavi, P.E. Travis County

  • PROJECT PRESENTATIONCris Parker, P.E. HDR Engineering, Inc.

    • PARSONS ROAD BRIDGE PROJECT

    • PARSONS – OLD KIMBRO ALIGNMENT STUDY

  • GENERAL DISCUSSION / Q&A


Bridge project background l.jpg

Bridge Project Background

  • Parsons Road Bridge over Wilbarger Creek

    • Built in 1954


Slide4 l.jpg

  • County Identified as substandard

    • Narrow

    • Lacks proper railing

  • Included in 2005 County Bond Program


Slide5 l.jpg

  • Frequent Flooding

    • Ranked 27th most severe stream crossing in Travis County

  • Wilbarger Creek (January 7, 2007)


Bridge replacement project l.jpg

Bridge Replacement Project

  • CONCEPTUAL BRIDGE REPLACEMENT ALTERNATIVE

  • Meet current standards for width, railing, safety

  • Reduce flood overtopping – 100-year design storm

  • Accommodate future needs – CAMPO 2030 Mobility Plan


Campo year 2030 mobility plan l.jpg

CAMPO Year 2030 Mobility Plan


Parsons old kimbro alignment study l.jpg

Parsons – Old Kimbro Alignment Study

  • Preferred Alignment – Alternative 1 or 2