1. Demolition29 CFR 1926, Subpart T
2. Overview of the OSHA regulation Preparations
Pre-job survey
By competent person
Determine structural integrity
Have evidence in writing
3. Overview of the OSHA regulation Preparations
All utilities shut off
Needed utilities relocated to temporary hook-up
Identify hazards & guard (glass)
Cover all floor openings not to be used
4. Stairs, Passageways, & Ladders Close those not to be used
Maintain only those for access
Proper illumination needed
5. Chutes No dropping of materials outside the building w/o protection (chute)
Totally enclose chutes 45 degrees & greater
End of chute guarded
6. Masonry Removal Do not overload floors with materials from other floors or components
Totally enclose chutes 45 degrees & greater
Safe access to scaffolds & walkways required
7. Floor Removal Provide adequate work surfaces for employees
Minimum 2X10 (undressed) planks
Openings less than 16”
8. Using Equipment for Removal Check structure’s ability to support load
Provide curbs to prevent driving over edge
Meet all aspects of Subparts N & O
9. Storage Debris on floors must not exceed allowable floor loads
10. Mechanical Demolition Keep employees out of work area
Remove heavy building attachments prior to demo
Cut steel prior to pulling over
Competent person must oversee job