An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPCC Agenda Item # 9 RC Mtg. 09/10/02 2002 Underfrequency Load Shedding Assessment

  2. UFLS Assessment • Last Assessment in 1991 (JWG-2) • Present Assessment initiated in January 2001 by TFSS • to assess adequacy of both the NPCC UFLS program as prescribed, and as implemented • Study conducted by the SS-38 Working Group on Inter-Area Dynamic Analysis

  3. NPCC UFLS Program – Objective • Return the system frequency to • 58.5 Hz within 10 s • 59.5 Hz within 30 s • For a generation deficiency of up to 25% of the system load

  4. NPCC UFLS Program -- Requirements • Shed 10% of load at 59.3 Hz • Shed 15% of load at 58.8 Hz • Load shedding by threshold type relays with a definite time delay not to exceed 0.75 s • Load shedding based on rate of frequency decay is permissible if the UFLS program objectives are met

  5. Issues Addressed in this Assessment • Voltage control following load rejection • Off-nominal frequency characteristics of nuclear and combined cycle generating plants • System-wide governing response • Ability to utilize additional load shedding to compensate for non-conforming generators

  6. Methodology • Islanding scenarios simulated in each Area • Generation deficiencies tested up to 25% • Sensitivity analysis for: • Load modeling • Governor response

  7. Preliminary Findings • Adequacy of the UFLS program as prescribed is affected by • System inertia • Overvoltage protection • Governor response

  8. Preliminary Findings • Adequacy of the UFLS program as implemented is affected by • UFLS relay time delay • Amount of load armed • Number of load shedding stages • Amount of non-conforming generation

  9. Preliminary Findings • The UFLS program as prescribed is inadequate in two Areas

  10. Potential Recommendations • SS-38 is presently investigating the following potential recommendations: • Modification to the UFLS relay time delay • Limitations on compensatory load shedding • Further investigation of methods to protect against off-nominal frequency operation

  11. Status • A “Draft for Comment” report was discussed by TFSS at their July 18 – 19 meeting • Input has been sought from TFSP regarding the ability of members to modify the UFLS relay time delay • A revised Draft report will be discussed by TFSS at their September 17 – 18 meeting • A final report will be prepared for the RCC with a target date of November 2002