Save presentation, open in PowerPoint, and
Download
1 / 40

Save presentation, open in PowerPoint, and View Notes Page to see slide notes - PowerPoint PPT Presentation


  • 140 Views
  • Uploaded on

Save presentation, open in PowerPoint, and View “Notes Page” to see slide notes. Origo PhaseID System. No cell phones No work delays due to lack of cellular coverage Use on any voltage Very portable (only 3 lbs) Lowest cost solution available.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Save presentation, open in PowerPoint, and View Notes Page to see slide notes' - lula


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Save presentation, open in PowerPoint, and

View “Notes Page” to see slide notes


Origo phaseid system
Origo PhaseID System

  • No cell phones

  • No work delays due to lack of cellular coverage

  • Use on any voltage

  • Very portable (only 3 lbs)

  • Lowest cost solution available


A GPS timing signal is used to simultaneously measure phase at a reference location and at a field location.

The phase attribute at the reference location is known.

By comparing the reference and field phase measurements, the field phase attribute can be determined.

Principal of Operation


Synchronous Motor Connected to Phase A at a reference location and at a field location.


Synchronous Motors Connected to Phases A, B and C at a reference location and at a field location.


Snapshot of Synchronous Motors at Same Instant of Time at a reference location and at a field location.


Phase measurement comparisons
Phase Measurement Comparisons at a reference location and at a field location.

  • The reference phase base station can be connected to any convenient wall socket of any phase.

  • Each GPS second, the wall socket phase is measured and stored in a PC file.

  • When touched to any energized line, the field probe measures the unknown phase at the next GPS second and encodes it into a 9-digit sequence.

  • Base and field measurements can be compared at any convenient time and manner by simply entering the 9-digit sequence into the PC.


Available in handheld or lineman
Available in Handheld or Lineman at a reference location and at a field location.


Handheld on transmission lines
Handheld on Transmission Lines at a reference location and at a field location.

  • 345KV

  • No extendo stick required.

  • Determine all 3 phases with a single measurement.


Handheld on overhead lines
Handheld on Overhead Lines at a reference location and at a field location.

69KV

12.5KV


Handheld in cabinets
Handheld in Cabinets at a reference location and at a field location.

12.5KV Bushing

12.5KV test Point


Handheld in substations
Handheld in Substations at a reference location and at a field location.

69KV Buss

12.5KV Buss


Handheld on Single Phase Line at a reference location and at a field location.


Handheld with Netbook PC & Aircard at a reference location and at a field location.


Convert a 20 Minute Extendo Stick Phasing Task on High Overhead Lines into a 20 Second Task using the Handheld

69KV


Lineman field probe
Lineman Field Probe Overhead Lines into a 20 Second Task using the Handheld

Substation Buss

12.5KV Bushing


Lineman field probe1
Lineman Field Probe Overhead Lines into a 20 Second Task using the Handheld

Elbow Test Point

Secondary Conductor


Lineman Secondary Adapter (Optional) Overhead Lines into a 20 Second Task using the Handheld


Available in manual or datalogger

Non-Real-Time phase attribute determination. Overhead Lines into a 20 Second Task using the Handheld

Write down the phase sequences and enter them into the base station later.

Call your dispatcher, or any other utility personnel, and give them the 9-digit sequence. They will enter it into their PC and tell you the phase attribute.

Real-Time phase attribute determination if Internet access available.

Automatically records the phase sequence in a measurement file.

Provides GPS location.

Accepts user notes.

Real-Time Satellite communication link available soon.

Available in Manual or Datalogger

Manual Version

Datalogger Version


Base Station Software Overhead Lines into a 20 Second Task using the Handheld


Tagging reference phase
Tagging Reference Phase Overhead Lines into a 20 Second Task using the Handheld

  • Tagging reference phase is one of the most important concepts of phase identification.

  • Tagging reference phase simply refers to what phase attribute you wish to call each 3-phase conductor.

  • There is no universal “Phase A”. Phases A, B, and C are simply the phase attributes the utility wishes to tag or assign to each of the 3-phase conductors.

  • Once assigned, all conductors of the same phase are tagged according to this chosen tagging reference phase.


Open and Save Configuration Files Overhead Lines into a 20 Second Task using the Handheld


Typical Configuration Files Overhead Lines into a 20 Second Task using the Handheld


Configuration Setup Overhead Lines into a 20 Second Task using the Handheld


Entering Phase Sequences Overhead Lines into a 20 Second Task using the Handheld


Secondary Phase Attribute Overhead Lines into a 20 Second Task using the Handheld


Primary and secondary connection phase attributes
Primary and Secondary Connection Phase Attributes Overhead Lines into a 20 Second Task using the Handheld


Field PC Software Overhead Lines into a 20 Second Task using the Handheld


User Inputs Overhead Lines into a 20 Second Task using the Handheld


GPS Position Overhead Lines into a 20 Second Task using the Handheld


Batch convert
Batch Convert Overhead Lines into a 20 Second Task using the Handheld

  • All measurement sequences can be converted to phase attribute with a single click.

  • First, copy the base station daily reference file into the field PC data directory.

  • Next, click on the third icon to the right of the measurement sequence window (red-to-green icon).

  • This action converts all measurement sequences to phase attributes and changes all red dots to green dots.


Three Phase Vertical Lines Overhead Lines into a 20 Second Task using the Handheld


Three Phase Horizontal Lines Overhead Lines into a 20 Second Task using the Handheld


Remote Base Stations Overhead Lines into a 20 Second Task using the Handheld


Lineman Field Probe Soft Case Overhead Lines into a 20 Second Task using the Handheld


Lineman Field Probe Hard Case Overhead Lines into a 20 Second Task using the Handheld


Base Station Overhead Lines into a 20 Second Task using the Handheld


Base Station Antenna Overhead Lines into a 20 Second Task using the Handheld


PhaseID USA Customers Overhead Lines into a 20 Second Task using the Handheld

(That we know of)

Origo also has customers in Australia, Canada, India, Jamaica, New Zealand, and Taiwan.


Bottom Line Overhead Lines into a 20 Second Task using the Handheld

When you are tasked with collecting thousands of attributes to phase identify your entire utility, no other system available is as fast and convenient as the Origo PhaseID System


ad