1 / 20

Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations

Facilities & Planning. Millar Library Learning Grounds. Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations. 2011-12 Current Construction Areas. University Point. College Station Housing

lula
Download Presentation

Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Facilities & Planning Millar Library Learning Grounds Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations

  2. 2011-12 Current Construction Areas

  3. University Point • College Station Housing • A PSU project with American Campus Communities (ACC) to increase student residential facilities at PSU • Walsh Construction, Contractor • 368,612 GSF, 16 Floors, 978 Beds • Building to have student housing, three general pool classrooms, a lecture hall, ground floor retail • Construction is anticipated to start in early December 2010 and continue through Summer of 2012 • Sidewalks and parking adjacent to the property will be closed throughout the project. Max Green Line service continues • PSU Project Rep: Jennifer Sharp

  4. Life Science Collaborative Building OUS/OHSU Life Science Collaborative Building at South Waterfront • Located at OHSU Schnitzer Campus • New building anticipated to collaboratively house OHSU, PSU, OSU, and private partners • 12-story – approx 650,000 GSF • (Includes OHSU’s new spaces in Phases I & 2, Skourtes Tower) • Building program is in refinement and includes: part of PSU Chemistry & Biology program, life sciences education & research, ground floor retail, & parking • Design process continuing • Estimated construction starting October 2011 • PSU occupancy September 2013 • Overall completion winter 2014 • PSU Project representative, Kate Vance • Current tracking LEED Gold, potentially achieving LEED Platinum

  5. Lincoln Hall Seismic and Systems Upgrade • State Deferred Maintenance $29.2 million • Main part of project completed in late August 2010. Building re-opened for use for Fall Term 2010 with Fine & Performing Arts and General Pool classrooms re-opened • New Broadway Entry construction began late Spring 2011, with completion scheduled for Fall 2011 • Installation of Photovoltaic panels began late Spring 2011, with completion & start-up scheduled for fall 2011 • PSU Project Manager, Joanna Evenson

  6. Science Research & Teaching Center & Hazardous Waste Facility (SRTC) ● Formerly Science Building 2 ● Building infrastructure upgrades and the expansion and modernization of labs and teaching space. State Limitation $45.3 M, various funding sources including General fund, grants, gifts, COPs, and bonds. $26.3 Deferred Maintenance infrastructure project completed last winter term. ● $2 Million CLEE research labs completed this summer. ● $2 Million EDA Grant to replace or add 71 fume hoods completed. ● $600,000 lobby upgrade completed. Construction was partially funded by student fees. ● Hoffman Construction will demobilize and be offsite starting Jan 2012. ● PSU Project Manager, Mark Fujii.

  7. Campus Steam & Chilled Water Loop ● Oregon Economic Stimulus Funded Project $17.5 million ● To improve and expand the network of heating and cooling piping throughout campus that forms our Campus Loop ● Leading to energy savings, more reliable service and increased capacity to heat and cool campus buildings . Estimated energy savings over $300,000 per year ● Geothermal cooling of a new heat pump and chiller in SB2 ● Federal Grant of $1 M awarded to use more of the heat in the geothermal wells ● Completion of project Fall 2011 ● PSU Project Manager, Mark Fujii

  8. Millar Library Learning Grounds ● Overall construction budget $614,000. ● Renovation of the Computer Lab ● Newly remodeled space, updated finishes, new computer workstations with integrated cable management. ● New "Sandbox Area" is a multi-use area defined by an innovative partition system, where students will have casual, impromptu work configurations while exploring integrated multi-media technology. ● Projected project completion Nov 15th ● PSU Project Managers: Francis McBride & Tracy Prose.

  9. Joseph C. Blumel Hall Repipe Remodel • $7M Blumel Hall Remodel is funded by Article XI-F bonds to upgrade the building infrastructure. Bonds will be issued in Spring 2012. • Early funding is being considered to expedite the design and construction process.  PSU Auxiliaries wishes the construction to begin Fall 2012 and complete by Summer 2013. • The upgrade will include replacing the roof, fixing the problem of water leaks in the units, and installing better heating controls and energy efficient lighting in the rooms • Modernization of the rooms will be considered if funds are available.  This may include kitchen cabinets, appliances, counter, flooring and painting. • PSU Project Manager: Mark Fujii; PSU In-House Architect: Tom Arnich; PSU In-House Mech. Engineer: Quinn Soifer.

  10. Potential Projects? • If you have a potential remodeling project in your plans contact our team and we will: • schedule a brief meeting to discuss scope • verify if project is feasible, or work with you to make it feasible • determine best delivery system – PSU crews or outside contractor, or consultant • manage design, permitting and estimating • oversee construction and completion of the project Francis McBride Construction Project Manager 503-725-8944 mcbridef@pdx.edu Ron Blaj Assistant Director Capital Project Management 503-725-4308 rblaj@pdx.edu

  11. Facilities & Planning - Reception 503-725-3738 Questions? Francis Mcbride mcbridef@pdx.edu Mark Fujii: fujiim@pdx.edu Ernest Tipton: tiptone@pdx.edu Ron Blaj: rblaj@pdx.edu Kate Vance kvance@pdx.edu Jennifer Sharpsharpj@pdx.edu Kay Byrne byrnek@pdx.edu Quinn Soifersoiferq@pdx.edu our website www.fap.pdx.edu

  12. Our Role: Help employees to work safely. Help supervisors provide employees with the information, skills, & tools they need to work safely Help administration to provide a safe workplace Help maintain compliance with environmental health & safety regulations (DEQ, OSHA and others) Environmental Health & Safety

  13. Requesting Service from EH&S: Chemical Spill Emergency: 5-4404 (CPSO) Odor Reports: Call Facilities at 5-3738 Please submit a Work Order for all other service requests, including: - Ergonomic Assessments - Hazardous Waste Pick-Up http://www.fap.pdx.edu/workorder Environmental Health & Safety

  14. Announcing our New Environmental Health and Safety Manager: Heather Randol (503) 725-9948 hrandol@pdx.edu Environmental Health and Safety

  15. Environmental Health & SafetyFire Marshal Inspections • All buildings are on an inspection schedule • FAP will notify building occupants • Re-inspections if violations are found • Departments notified of any violations • If corrected in 40 days: No charge • If not corrected in 40 days: $$$ fees will be charged to the occupant’s department

  16. Environmental Health & SafetyCommon Fire Code Violations • Unsafe chemical storage • Blocked exits • Materials stored in corridors

  17. Environmental Health & SafetyCommon Fire Code Violations • Extension cords used instead of permanent wiring • Ganged surge protectors

  18. Environmental Health & SafetyCommon Fire Code Violations • If violations are found, don’t wait! • Contact FAP for assistance. • 503-725-2FIX or http://www.pdx.edu/fap/

  19. Maintenance & Operations • Our team provides the following campus services: • Electrical • HVAC&R • Plumbing • Carpentry • Energy Management • Keys & Lockshop • Grounds Maintenance • Signs & Way Finding Michael McBride Electrician 725-6062 mmcbride@pdx.edu Rick Viaene Chief Building Engineer 503-725-9996 viaene@pdx.edu Gerry Gadberry Assistant Director 503-725-9972 gadberry@pdx.edu Bob Folkerts Building Automation Supervisor 725-9981 rgf@pdx.edu

  20. New telephone number: 725-2FIX (503-725-2349) FAP on the web: http://www.pdx.edu/fap Facilities Work Order System

More Related