1 / 56

Logistics Civil Augmentation Program, Iraq

Logistics Civil Augmentation Program, Iraq. Requirement: Supply, maintenance, transportation, base ops (e.g. power, water, etc.), and life support (e.g. DFAC, MWR, etc.). Status of Acquisition: Performing base period, expires 31 Aug 08

luke
Download Presentation

Logistics Civil Augmentation Program, Iraq

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Logistics Civil Augmentation Program, Iraq Requirement: Supply, maintenance, transportation, base ops (e.g. power, water, etc.), and life support (e.g. DFAC, MWR, etc.). Status of Acquisition: Performing base period, expires 31 Aug 08 Acquisition Strategy: Follow-on TO currently being negotiated Projected Solicitation Date: In process Projected Contract Award: 31 Aug 08 Point of Contact: PCO, 309-782-8589,

  2. Bagram AFB, Afghanistan Requirement: Provide airfield support, life support, and O&M to United States Forces, Coalition Forces and other organizations.  Status of Acquisition: POP extended to 31 Mar 09 Acquisition Strategy: Cost Plus Award Fee, funded by CJTF-101 Projected Solicitation Date: TBD Projected Contract Award: 31 Mar 09 Point of Contact: PCO, 309-782-3971,

  3. Camp Phoenix, Afghanistan Requirement: Provide life support and selected O&M to US and Coalition Forces supporting the Training Compound. Force Providers are used.   Status of Acquisition: POP extended to 31 Mar 09 Acquisition Strategy: Exercise Option of Cost Plus Award Fee funded by CJTF-101 Projected Solicitation Date: TBD Projected Contract Award: 31 Mar 09 Point of Contact: PCO, 309-782-3971,

  4. Khandahar AFB, Afghanistan Requirement: Provide life support, O&M to US Forces. Force Providers are used. Status of Acquisition: POP extended to 31 Mar 09 Acquisition Strategy: Exercise Option of Cost Plus Award Fee, funded by CJTF-101 Projected Solicitation Date: TBD Projected Contract Award: 31 Mar 09 Point of Contact: PCO, 309-782-3971,

  5. Support to AFSBn-KU and Liaison Support Requirement: Maintenance, supply, and transportation support for repair and issue of theater provided equipment for OIF/OEF missions and APS. Status of Acquisition: OY 3 expires 29 Sep 09 Acquisition Strategy: Exercise OY 4 on 30 Sep 09 Projected Solicitation Date: FY09 Projected Contract Award: Base contract and OYs expire 29 Sep 10 Point of Contact: PCO, 309-782-3965,

  6. Logistics Civil Augmentation Program Support Requirement: Provides a wide range of technical support to LOGCAP forward deployed Deputy Directors in Kuwait, Iraq, and Afghanistan. Assists with IGCE development. Provides analysis of contractor approaches on PWS requirements. Supports Government management of LOGCAP actions during operational surges. Provide services in support of LOGCAP augmenting contingency operations throughout the full range of military operations, including reconstitution and replenishment. Status of Acquisition: OY 1 POP 16 Feb 08 – 15 Feb 09 with 3 OYs Acquisition Strategy: TO under existing contract Projected Solicitation Date: N/A Projected Contract Award: Current contract expires 15 Feb 12 Point of Contact: PCO, 309-782-0498,

  7. Department of State Support of Mission/DoD Requirement: O&M programs, work orders & repairs, construction-engineering services, power generation, HVAC, showers & latrines, water works systems, MWR services, billeting management, DFAC operations, NTV maintenance, operations, and project planning. Status of Acquisition: TO extended to Feb 09 Acquisition Strategy: Beginning Jan 09, plan to use TO under LOGCAP III IDIQ Projected Solicitation Date: N/A Projected Contract Award: Jan 09 Point of Contact: PCO, 309-782-7183,

  8. KUWAIT AOR Support Requirement: Provide base camp / life support services and selected CS/CSS functions to US military forces in the Kuwait AO (exceptions are Udairi Airfield and Camp Buehring). Provide O&M services at SPOD. Provide fire fighting operations for ammo berths, helicopter berths, staging areas, C2 building and other Army facilities. M&A support includes finance and accounting; contracts administration; government compliance; health, safety & environmental; human resources; information technology; and program management. Status of Acquisition: POP Dec 07 - Dec 08 Acquisition Strategy: Base plus 4 OYs (POP = 1 Yr) Projected Solicitation Date: 26 Aug 08 Projected Contract Award: Dec 08 Point of Contact: PCO, 309-782-8589

  9. CJOA Operating Base, Afghanistan Requirement: Provides selected logistical support operations and limited life support to both US Armed Forces and Coalition Forces. Force Providers are used. Status of Acquisition: POP extended to 31 Mar 09 Acquisition Strategy: Cost Plus Award Fee, funded by CJTF-101 Projected Solicitation Date: TBD Projected Contract Award: 31 Mar 09 Point of Contact: PCO, 309-782-3971,

  10. Firebase Salerno - Afghanistan Requirement: Provide life support and selected O&M to US and Coalition Forces supporting reconstruction efforts. Force Providers are used. Status of Acquisition: POP extended to 31 Mar 09 Acquisition Strategy: Cost Plus Award Fee, funded by CJTF-101 Projected Solicitation Date: TBD Projected Contract Award: 31 Mar 09 Point of Contact: PCO, 309-782-3971,

  11. APS-5 Support to AFSBn-QA Requirement: Provide maintenance, supply, and transportation support for repair and issue of theater provided equipment for OIF/OEF missions and APS. Status of Acquisition: Currently in OY 8 (of 10) through 30 Nov 08 Acquisition Strategy: Option Award Projected Solicitation Date: TBD Projected Contract Award: Contract expires 30 Nov 10 Point of Contact: PCO, 309-782-3965

  12. LBE CONUS West Requirement: Provides property and maintenance management to Army units in the CONUS West AOR, establishing and maintaining property accountability for designated LBE. Provides accountability and visibility of LBE assets. Status of Acquisition: Currently in OY 1 of 4, 30 Jan 08 – 29 Jan 09 Acquisition Strategy: TO option awarded Projected Solicitation Date: TBD Projected Contract Award: Contract expires 29 Jan 12 Point of Contact: PCO, 309-782-4805,

  13. Maintenance Operations, Iraq Requirement: Provides one-stop TWV fleet sustainment maintenance, add on armor, and material fielding of new technology equipment to Multi-National Corps - Iraq. Includes back-up DS and limited GS maintenance, support maintenance for TPE, sustainment and the TWV support center for light, medium, and heavy wheeled vehicles. Status of Acquisition: Currently in OY 3 of 4 through 29 Sep 08 Acquisition Strategy: OY 4 will be followed by GMASS II Projected Solicitation Date: N/A Projected Contract Award: Contract expires 29 Sep 09 Point of Contact: PCO, 309-782-4923,

  14. Staff Augmentation for AFSB Iraq Requirement: Provide staff support to 402nd AFSB. Assist with ongoing and future contingency operations. Status of Acquisition: Developing Performance Work Statement Acquisition Strategy: Last OY expires 31 Mar 09. Planning for new contract (base plus four OYs). Projected Solicitation Date: Oct 08 Projected Contract Award: Jan 09 Point of Contact: PCO, 309-782-5799,

  15. DMC Support - ASC Requirement: Provide Readiness Management for the Active Army in the Continental United States (CONUS), Alaska and Hawaii. Single Integrator for Field Level RESET and Left Behind Equipment in Support of Army Force Generation (ARFORGEN). Status of Acquisition: Requirement Definition and Strategy Development Acquisition Strategy: Full & open competition Projected Solicitation Date: 1st Quarter FY09 Projected Contract Award: 2nd or 3rd Quarter FY09 Point of Contact: PCO, 309-782-3220,

  16. OEF / OIF Requirement: Provide property accountability and asset visibility functions for all TPE. Includes inventories, maintaining hand receipts, processing property transactions, and providing technical assistance to deploying and re-deploying units regarding property books. Provide staff augmentation for ARCENT cell, 4ID and 3ID. Status of Acquisition: Currently in OY 2 of 4, POP 1 Jul 08 – 30 Jun 09 Acquisition Strategy: Option Award Projected Solicitation Date: TBD Projected Contract Award: Contract expires 30 Jun 11 Point of Contact: PCO, 309-782-4805,

  17. LBE Conus East Requirement: Provides property and maintenance management to Army units in the CONUS East AOR, establishing and maintaining property accountability for designated LBE. Provides accountability and visibility of over LBE assets. Status of Acquisition: OY 2 of 4, POP 28 Sep 08 – 27 Sep 09 Acquisition Strategy: Option award Projected Solicitation Date: TBD Projected Contract Award: Current contract expires 27 Sep 11 Point of Contact: PCO, 309-782-4805,

  18. Camp Eggers, Afghanistan Requirement: Provide life support and selected O&M to US and Coalition Forces in an urban environment. Force Providers are being used to billet soldiers. Status of Acquisition: POP extended to 31 Mar 09 Acquisition Strategy: Cost Plus Award Fee, funded by CJTF-101 Projected Solicitation Date: TBD Projected Contract Award: 31 Mar 09 Point of Contact: PCO, 309-782-3971,

  19. Udairi Army Airfield / Camp Buehring Requirement: Provide airfield operations and management services, air traffic control services, weather observation and forecasting services, airfield RSOI support services, and airfield O&M services at designated facilities. Status of Acquisition: Current POPexpires 29 Jan 09 Acquisition Strategy: Extension of POP Projected Solicitation Date: TBD Projected Contract Award: Base awarded, 28 Jan 08 - 29 Jan 09 Point of Contact: PCO, 309-782-7183,

  20. APS-4 Korea Requirement: Provides COSIS and TM -10/-20 level maintenance on HBCT, hospital sets, CTCs, sustainment and operational project stocks stored at Camp Carroll, Korea. Augments host nation workforce. Status of Acquisition: POP ends 30 Mar 09 Acquisition Strategy: TBD by Oct 08 Projected Solicitation Date: O/A Oct 08 Projected Contract Award: Mar 09 Point of Contact: PCO, 309-782-5541,

  21. APS Watercraft Yokohama North Dock Requirement: Provide COSIS and field level maintenance on 27 Watercraft vessels and the Modular Causeway System (MCS) stored at Watercraft Equipment Base-Yokohama North Dock (WEB-YND). Prepare vessels and MCS for hand-off during contingency or exercise. Status of Acquisition: Base year expires 15 Sep 08 Acquisition Strategy: Full and open, base year with 4 options Projected Solicitation Date: Solicitation closed 4 Aug 08 Projected Contract Award: 15 Sep 08 Point of Contact: PCO, 309-782-5799,

  22. Republic of Georgia Sustainment of Stability Operation Program Requirement: Provide housing and sustain US and Coalition Forces, upgrade Host Nation facilities and equipment, support US and Coalition Forces with personnel on site AOB 060 (Advance Operating Base).Provide for all US forces: billeting, food service, facilities management and maintenance, MWR, fitness center services, laundry, equipment maintenance, property accountability, supply operations, fuel operations, vector control, security, structure renovation, power generation, transportation, warehousing, and interpreter support. Status of Acquisition: POP 1 Apr 08 - 31 Mar 09 Acquisition Strategy: Future need unknown Projected Solicitation Date: N/A Projected Contract Award: N/A Point of Contact: PCO, 309-782-8589,

  23. LOGJAMSS Wildcat Maintenance Management System (WMMS) Requirement:Systems operators/programmers, software and hardware for WMMS, the automated tool that supports FLRD’s ability to manage its FLRCs’ maintenance and supply programs (work orders, labor hours, and associated costs). Status of Acquisition: Under a 6-month extension to 30 Nov 08 Acquisition Strategy: J&A for 1-year sole source 1 Dec 08 – 30 Nov 09 Projected Solicitation Date: Apr 09 Projected Contract Award: 1 Oct 09; phase-in 1 Nov 09 Point of Contact: PCO, 404-464-1774

  24. Expeditors Requirement: Provides support to conduct worldwide searches for parts and equipment on a daily basis utilizing the FLRD Mgmt Information Systems, WMMS and WDS for expedited delivery to other FLRCs and units. Status of Acquisition: Base POP is 1 Mar 08 – 28 Feb 09 with 4 OYs Acquisition Strategy: Option award Projected Solicitation Date: TBD Projected Contract Award: 28 Feb 13 Point of Contact: PCO, 404-464-4189,

  25. LOGJAMSS - Logistics Reengineering Support Requirement: Provides financial, logistical and administrative support to the FLRC network. Status of Acquisition: Six-month contract extension expires 31 Aug 08. Preparing for new solicitation. Acquisition Strategy: Being combined with LOGJAMSS – FLRD Management Team. Anticipate 6 month J&A, POP 1 Sep 08 – 28 Feb 09 Projected Solicitation Date: 15 Sep 08 Projected Contract Award: 15 Jan 09 (phase-in Feb 09) Point of Contact: PCO, 404-464-1774,

  26. FLRC Quality Assurance Requirement: Inspect, classify, and document quality assurance compliance results for a diverse assortment of major assemblies and storage facilities. Status of Acquisition: Base year 1 Mar 08 – 28 Feb 09 with 4 OYs Acquisition Strategy: Option Award Projected Solicitation Date: TBD Projected Contract Award: 28 Feb 13 Point of Contact: PCO, 404-464-1774,

  27. Emergency Operations Center Staff Augmentation – Europe Requirement: Fill logistical gaps in support of 405th AFSB elements in four geographical areas and sixteen locations in Europe. Includes collecting and analyzing operational information. Status of Acquisition: OY1 expires 20 Sep 08 Acquisition Strategy: Option Award for Sep 08 – Sep 09 Projected Solicitation Date: TBD Projected Contract Award: Sep 09 Point of Contact: PCO, 309-782-3220,

  28. LOGJAMSS – APO/PO Requirement: APO/POs are responsible for managing programs and on-going work projects in support of 16 FLRCs. Status of Acquisition: Current six-month extension expires 31 Aug 08. Seeking another extension to 28 Feb 09. Acquisition Strategy: Being combined with LOGJAMSS – FLRD Management Team Projected Solicitation Date: 15 Aug 08 Projected Contract Award: 15 Jan 09 (phase-in) Point of Contact: PCO, 404-464-1774,

  29. AFSBn – Afloat IT Support Requirement: Provide Information Technology (IT) services for AFSBn –Afloat, Charleston, SC. Status of Acquisition: Current contract expires 4 Oct 08. New base contract underway. Acquisition Strategy: Issue new 8A set-aside to Vista International Operations Projected Solicitation Date: 13 Aug 08 Projected Contract Award: 31 Aug 08 Point of Contact: PCO, 309-782-5799,

  30. TMDE Kuwait Requirement: Support ground and air equipment, providing calibration and repair for TMDE located in Southwest Asia for OIF and Afghanistan OEF units assisting with sustaining operational readiness. Status of Acquisition: POP 1 Mar 08 - 28 Feb 09 Acquisition Strategy: Award new contract 28 Feb 09 Projected Solicitation Date: TBD Projected Contract Award: Full & open contract Point of Contact: PCO, 309-782-7183,

  31. Intelligence Analysts Requirement: Provides ASC G2 with Intelligence Analysts located at RIA, 401st AFSB in Kuwait, and 401st AFSB in Afghanistan. Analysts provide timely, accurate, relevant and tailored intelligence analysis to the ASC Command, staff and subordinate units. Status of Acquisition: Now in OY 3 of 4 POP 27 Sep 07 - 26 Sep 08 Acquisition Strategy: Option award Projected Solicitation Date: 2nd Quarter of FY09 Projected Contract Award: NLT 30 Sep 09 Point of Contact: PCO, 309-782-3220,

  32. Battalion Staff Augmentation Europe Requirement: Contract personnel perform various services including IT, budgeting/personnel and security support augments. NOTE: IT personnel support multiple countries and 16 different locations in Europe. Status of Acquisition: OY 1 (of 2) expires Sep 08 Acquisition Strategy: Option Award to Sep 09 Projected Solicitation Date: TBD Projected Contract Award: Sep 08. Point of Contact: PCO, 703-325-1717

  33. G8 – Reconciliation of Financial and Logistical Systems Requirement: Provide financial to logistical system reconciliation of repair part requisitions to obtain current obligation record and fund status. Provide review and analysis of service provider execution of ASC funding for maintenance and repair parts. Status of Acquisition: Base year expires 13 Sep 08 Acquisition Strategy: Exercise OY 1 14 Sep 08 - 13 Sep 09 Projected Solicitation Date: N/A Projected Contract Award: Current contract expires 13 Sep 08 Point of Contact: PCO, 309-782-3220

  34. LOGJAMSS - FLRD Management Team Requirement: Plan, coordinate and manage programs within the FLRD that are essential to the operation of the FLRC network. Status of Acquisition: Expires Feb 09. In re-competition process. Acquisition Strategy: Full & open competition for follow-on contract. Projected Solicitation Date: 15 Aug 08 Projected Contract Award: 15 Jan 09 for phase-in Point of Contact: PCO, 404-464-1774,

  35. ASC Baseline Plus User Technology Assessment Center Requirement: Provide a broad range of desktop and workstation support to HQ ASC. Status of Acquisition: Awarded (base plus 2 option years) Acquisition Strategy: Small Business (8A) Projected Solicitation Date: TBD Projected Contract Award: Current contract expires 31 May 11 Point of Contact: PCO, 309-782-6618,

  36. FSR & SAMS Requirement: Provide two FSRs and one SAMS operator to support installation/sustainment of Tactical Wheeled Vehicle Add-on-Armor. Status of Acquisition: OY 1 POP 1 Oct 08 – 31 Mar 09 Acquisition Strategy: Exercise OY 2 for POP 1 Apr – 30 Sep 09 Projected Solicitation Date: N/A Projected Contract Award: Base contract expires 30 Sep 08 Point of Contact: PCO, 309-782-5799,

  37. LOGCAP Support Program Office Requirement: Support the LOGCAP Executive Director with program management support, multi-functional logistics expertise, review and analysis to implement relevant program metrics. Performs analysis and limited studies pertaining to issues of Congressional, command, and internal interest concerning LOGCAP operations. Monitor and provide daily input concerning current LOGCAP operations. Status of Acquisition: OY 1 expires 15 Feb 09, with 3 OYs available to exercise. Acquisition Strategy: Option Award, FFP Projected Solicitation Date: TBD Projected Contract Award: 15 Feb 12 Point of Contact: PCO, 309-782-0498

  38. Charleston AST Requirement: Provide critical and accurate ammunition accountability records. Document and record all transactions involving the movement of munitions, the reporting of all Category I item locations and change in assigned condition codes. Also required to accompany QASAS on all operations worldwide in support of the APS mission. Status of Acquisition: POP to begin 31 Aug 08 – 30 Aug 09 with 4 OYs capable of being exercised. Acquisition Strategy: New 8A contract awarded by 31 Aug 08 (base plus 4 years). Projected Solicitation Date: Ongoing Projected Contract Award: 29 Aug 08 Point of Contact: PCO, 309-782-5799

  39. FLRD DRMO Requirement: FLRD DRMO Team conducts continual and simultaneous screening of parts and equipment in Defense Reutilization Marketing Service collection sites to support the FLRC network. Status of Acquisition: POP is 21 Apr 08 – 20 Apr 09 with four OYs. Acquisition Strategy: Exercised OY1 by 20 Apr 09. Projected Solicitation Date: TBD Projected Contract Award: 20 Apr 13 Point of Contact: PCO, 404-464-1774

  40. Wildcat Database System (WDS) Requirement: Maintain, test, and document the WDS software application, a database program which is the internet interface to the WMMS. Thru the WMMS interface, WDS enables ASC, FLRD Expediters to view Class II/IX stocks in FLRCs, and provide critical parts not readily available in the wholesale system, thereby taking deploying units’ equipment off deadline status. Status of Acquisition: OY 3 (of 4) POP 25 Sep 07 – 24 Sep 08. Acquisition Strategy: Exercise OY 4 of 4, 25 Sep 08 – 24 Sep 09 Projected Solicitation Date: TBD Projected Contract Award: 25 Sep 09 Point of Contact: PCO, 520-533-1477

  41. Application Support for ASC Requirement: Provide development, sustainment, enhancement and/or modernization support for various desktop automation, client server, internet and intranet web pages, and web based applications. Status of Acquisition: Option 1 (of 2) Dec 07 – 30 Nov 08 Acquisition Strategy: Exercise option 1 Dec 08 – 30 Nov 09 Projected Solicitation Date: Apr 09 Projected Contract Award: Base contract awarded 04 Point of Contact: PCO, 309-782-6618

  42. Non-Common Level Services Requirement: Provide property accountability support, loan pool management, and conference room support services (teleconferencing and audio-visual equipment maintenance) Status of Acquisition: Awarded (base plus 2 options) Acquisition Strategy: Small Business (8A) Projected Solicitation Date: TBD Projected Contract Award: Current contract expires 31 May 11 Point of Contact: PCO, 309-782-6618,

  43. MRAP Military Vehicle Requirement: Provide property accountability and asset visibility of new fielding MRAP vehicles. Reconcile hand-receipts, catalog property, maintain property book records and manage inventory until staging for shipment to SWA. Involves accountability and visibility of approximately 5000 vehicles. Status of Acquisition: Base year awarded with 3 OYs. POP 8 Sep 07 – 7 Sep 08. Acquisition Strategy: Option award Projected Solicitation Date: N/A Projected Contract Award: 7 Sep 08 Point of Contact: PCO, 309-782-4805,

  44. APS - 4 Aviation Support Requirement: Provide COSIS on select Aviation and Missile assets. Class IX stocks currently in storage at Camp Carroll, Korea and Sagami General Depot, Japan. Status of Acquisition: Four OYs are available. Preparing solicitation. Acquisition Strategy: Under AVJAMSS contract administered out of Fort Hood, TX. Projected Solicitation Date: 15 Aug 08 Projected Contract Award: Base contract expires 30 Sep 08 Point of Contact: PCO, 011-82-53-470-7430,

  45. ASC Secure Video Bridge Requirement: Support services for secure video bridge to include leasing, operations, maintenance, scheduling, and performing installation/configuration of software and firmware updates. Status of Acquisition: Awarded (base plus 2 option years) Acquisition Strategy: Small Business (8A) Projected Solicitation Date: TBD Projected Contract Award: 31 May 11 Point of Contact: PCO, 309-782-6618

  46. JMC & ASC Database and Server Support Requirement: Provide management and technical support to all server and database hardware, software, and peripherals. Maintain day-to-day operations for supported users, e.g., respond to trouble calls, troubleshoot, diagnose, test, research, distribute, maintain 100% accountability of equipment, and coordination and implement database/server upgrades. Status of Acquisition: Two OYs are available to exercise Acquisition Strategy: Small Business (8A) Projected Solicitation Date: TBD Projected Contract Award: Base contract ends 31 May 09 Point of Contact: PCO, 309-782-6618

  47. Maintain and Support a Distribution and Allowance Database Requirement: System developer required for maintenance and support of DNA systems, established to manage personnel records for civilian employees. Includes awards, personnel records, security information, budget information and appraisals. Status of Acquisition: N/A Acquisition Strategy: Small Business (8A) Projected Solicitation Date: Apr 09 Projected Contract Award: Jul 09 Point of Contact: PCO, 309-782-3271

  48. Automation Support for FLRD Requirement:Automation support for FLRD. Provides for configuration, installation, and support of over 2,000 pieces of ADP, to include servers, workstations and peripherals for the FLRCs assigned to FLRD. Status of Acquisition: OY 1 POP 01 Jul 08 – 30 Jun 09 Acquisition Strategy: Exercise OY 2 Projected Solicitation Date: TBD Projected Contract Award: 30 Jun 10 Point of Contact: PCO, 404-464-5784

  49. SARSS Gateway Systems Support Requirement: Provide system administration to include planning, organizing, directing and maintaining the ASC gateway program by providing analysis of logistics information management support, monitoring the SARSS-Gateway use, and coordinating/integrating gateway requirements and support procedures. Provide system analysis for development and maintenance of the WMMS and the WDS to ensure compliance with DA standards and regulatory guidance. Status of Acquisition: OY 1 to be exercised, 30 May 09 – 29 May 10 Acquisition Strategy: Option Award Projected Solicitation Date: N/A Projected Contract Award: Basic contract, 30 May 08 – 29 May 09 with two OYs Point of Contact: PCO, 804-734-7212,

  50. Video/Teleconferencing Suite Maintenance Requirement: Routine maintenance support to equipment in ASC video/teleconference rooms to include testing and installing software/firmware upgrades, life cycle management of projectors/screens, integration of new/replaced equipment, and support for equipment failures. Status of Acquisition: In process Acquisition Strategy: Sole Source Projected Solicitation Date: 15 Aug 08 Projected Contract Award: 20 Sep 08 Point of Contact: PCO, 309-782-6618

More Related