Rd51 wg7 tentative august and october setups
Download
1 / 6

RD51 –WG7 Tentative August and October setups - PowerPoint PPT Presentation


  • 124 Views
  • Uploaded on

RD51 –WG7 Tentative August and October setups. Matteo Alfonsi. August test beam schedule. Start 12 th of August First day of MD.. No problem because of installation 10.5 effective days. Period 2 (August 12 th – 23 rd ). Nikhef gas line. Ne/CH 4 95/5 2 sensors. Goliath.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' RD51 –WG7 Tentative August and October setups' - lucie


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Rd51 wg7 tentative august and october setups

RD51 –WG7Tentative Augustand October setups

Matteo Alfonsi


August test beam schedule
August test beam schedule

  • Start 12th of August

  • First day of MD.. No problem because of installation

  • 10.5 effective days

M. Alfonsi


Period 2 august 12 th 23 rd
Period 2 (August 12th – 23rd)

Nikhefgas line

Ne/CH4 95/5

2 sensors

Goliath

Ar/CH4 50/50

2 sensors

GEM trackerAveiro/UTA/Weizmann

TOTEM

Nikhef

beam

TS

Ar/iC4H10 80/20

2 sensors

DME/CO2 50/50

2 sensors

3 RD51gas lines:

Ar/CO2 70/30

Ar/CO2 80/20

Ne/CH4 95/5

1 RD51gas line:

Ar/CO2 70/30

1 SPSgas line

Ar/CH4 50/50

No magnet, but several flammable gas

M. Alfonsi - CERN


Aveiro uta weizmann setup within cern table
Aveiro/UTA/Weizmann setupwithin CERN table

Compatible within CERN table if these dimensions includes the whole envelope with services

80*80 mm^2 window on both sides

(only the G10 readout & THEMs are crossed by the beam)

50 mm

Data and power cables

~20 cm long

300 mm

200 mm

Interface board

(might stay outside the box)

SHV connectors

M. Alfonsi


Problems in october
Problems in October

  • Big MD at the beginning .. Useful for installation but only 9 effective days for 7 foreseen groups

  • SPS coordinator wants to put LHCf parassitically in our period: space in the area should be enough, but I see big problems with accesses, beam settings, space in the barrack

  • Safety requested an updated fringe field map.

M. Alfonsi


Conclusions
Conclusions

  • No major problems in August setup

  • New Goliath fringe field measurements required for October (possible slot: end of August)

  • LHCf within October test beam is a major issue