An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Plant #3Concentrate Pre-treatmentProject

  2. Regulatory Requirements: • Wtp#3 has a discharge permit limit for iron of 0.3 mg/L • Wtp#3 Concentrate is greater than 0.3 mg/L • FLDEP AO 154NE provides a schedule to meet the iron discharge limitation • Concentrate is permitted as a source water at Wtp#1 • Color compliance at Wtp#1 is dependent on color reduction treatment by ozone treatment at Wtp#3 Water Plant #3 Concentrate Pre-treatment Project

  3. Process Components: Primary System • Ozone system for color reduction • Recovers up to750,ooo gals/day Secondary System • Cartridge filtration system for iron reduction Water Plant #3 Concentrate Pre-treatment Project

  4. Water Plant #3 Concentrate Pre-treatment Project Funding: • Total Project Cost - $1,580,000 • Design & Permitting - $162,345 • Construction Cost including contingency - $1,407,680 • Source of Funds: 5 Year CIP bond funds • SJRWMD Cooperative Cost Share Grant - $494,800 • Florida Legislative Funding Grant - $375,000 (waiting for Governor’s signature)

  5. Water Plant #3 Concentrate Pre-treatment Project Questions?