Pspi pepsi installation preparation includes all of the pier modifications
Download
1 / 6

LBT Q1 2007 Engineering Review - PowerPoint PPT Presentation


  • 88 Views
  • Uploaded on

PSPI: PEPSI installation preparation, includes all of the pier modifications. LBT Q1 2007 Engineering Review. Highlights (Q1/2007). Install conduit for FO Install LIU at bridge location Install 36 fiber FO cable computer room to PEPSI bridge. Open Issues. Technical Painting floor and walls

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' LBT Q1 2007 Engineering Review' - lucas


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Pspi pepsi installation preparation includes all of the pier modifications

PSPI: PEPSI installation preparation, includes all of the pier modifications

LBT Q1 2007 Engineering Review


Highlights q1 2007
Highlights (Q1/2007) pier modifications

Install conduit for FO

Install LIU at bridge location

Install 36 fiber FO cable computer room to PEPSI bridge


Open issues
Open Issues pier modifications

Technical

Painting floor and walls

Schedule

Not yet

Financial

None

Resource

Identify paint and paint contractor


Progress q1 2007
Progress (Q1/2007) pier modifications

Fiber optic cable and conduit has been installed

LIU is installed


Planning q2 2007
Planning (Q2/2007) pier modifications

Terminate fibers

Define and install the connection point box

Install some services


Planning before 2008
Planning (before 2008) pier modifications

Install services

install E-net,

install E-stop

install telephone

install cooling water, 47 deg

install clean, dry air

install power and conduit

Move florescence lights up to 4 M

Insulate all pipe carrying liquids

Move J box up to 4 M

Epoxy paint entire floor

Paint walls with epoxy paint

Install the support brackets on the telescope gallery


ad