PSPI: PEPSI installation preparation, includes all of the pier modifications. LBT Q1 2007 Engineering Review. Highlights (Q1/2007). Install conduit for FO Install LIU at bridge location Install 36 fiber FO cable computer room to PEPSI bridge. Open Issues. Technical Painting floor and walls

Download Presentation

LBT Q1 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Pspi pepsi installation preparation includes all of the pier modifications

PSPI: PEPSI installation preparation, includes all of the pier modifications

LBT Q1 2007 Engineering Review


Highlights q1 2007

Highlights (Q1/2007)

Install conduit for FO

Install LIU at bridge location

Install 36 fiber FO cable computer room to PEPSI bridge


Open issues

Open Issues

Technical

Painting floor and walls

Schedule

Not yet

Financial

None

Resource

Identify paint and paint contractor


Progress q1 2007

Progress (Q1/2007)

Fiber optic cable and conduit has been installed

LIU is installed


Planning q2 2007

Planning (Q2/2007)

Terminate fibers

Define and install the connection point box

Install some services


Planning before 2008

Planning (before 2008)

Install services

install E-net,

install E-stop

install telephone

install cooling water, 47 deg

install clean, dry air

install power and conduit

Move florescence lights up to 4 M

Insulate all pipe carrying liquids

Move J box up to 4 M

Epoxy paint entire floor

Paint walls with epoxy paint

Install the support brackets on the telescope gallery