NEESgrid Early Adopter Program. Sridhar Gullapalli USC/Information Sciences Institute + The SI Team + EA Team. Agenda. Introduction: 11:15 to 11:30 AM (Sridhar Gullapalli) Outline and goals: People on each team POC E-Mail Lists EA Plan: 11:30 to 11:45 AM (Sridhar Gullapalli)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'NEESgrid Early Adopter Program' - louisa


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Neesgrid early adopter program

NEESgrid Early Adopter Program

Sridhar Gullapalli

USC/Information Sciences Institute

+ The SI Team + EA Team


Agenda
Agenda

  • Introduction: 11:15 to 11:30 AM (Sridhar Gullapalli)

    • Outline and goals:

    • People on each team

    • POC

    • E-Mail Lists

  • EA Plan: 11:30 to 11:45 AM (Sridhar Gullapalli)

  • EA Plan Discussion: 11:45 AM to 12:15 PM (Laura Pearlman)

  • Next Steps: 12:15 PM to 12:45 PM (Doru Marcusiu)

    • Site Responsibilities

    • SI Team Responsibilities


The ea plan 11 30 am to 11 45 am sg
The EA Plan (11:30 AM to 11:45 AM) SG


Architecture approach system architecture document
Architecture Approach (System Architecture Document)

  • Develop common infrastructure that can used across all NEES applications

    • Balance generic mechanisms, extensibility for future growth, efficiency for application specific tasks

  • Validate against user requirements

    • Input from user requirements analysis, site visits

  • Extending proven grid technologies

  • Developing custom solutions for NEES specific requirements (e.g. Data, DAQ, Video services)


The early adopter program from the ea document
The Early Adopter Program(from the EA Document)

  • Spiral Model

    • Iterative deployment, testing and refinement

    • Timeline roughly 6 months (this phase)

  • EA sites

    • RPI, Reno, Oregon State

  • Shadow Sites and other users

    • NEES Equipment Sites

    • Researchers in Earthquake Engineering field


The generic ea experiment the preparation phase
The Generic EA Experiment: The Preparation Phase



Conclusion of a test or run
Conclusion of a “test” or “run”

Change/adjust parameters and repeat test or

conclude experiment or revise experiment


Partial listing of components
Partial listing of components

  • Collaboration Tools

  • Local (on-site) Storage & Central Data Repository

  • DAQ

  • Prototype Data Models and Services

  • Streaming data services

  • Streaming video Services

  • Tele-operations (control will not be supported during the EA Phase)

  • NEESPOP and Services


Global timelines
Global Timelines

  • Communicating Plan Apr 15

  • Tracking NMI release May 7

  • Strawman data model Apr 15

  • LabVIEW setup at ANL/ISI May 15

  • NEESPOP, Video Server and Local Storage Solution, LabVIEW DAQ (version 6.1) setup and installation at EA Jun 1

  • Prototype Telepresence server at EA Jul 1

  • Streaming data specification Aug 1

  • Streaming data implementation (based on LabVIEW version 6.1) Aug 1

  • Initiate Experiments phase 1 Jul 15

  • Conclude Experiment Phases Oct 15


Ea plan discussion 11 45 am to 12 15 pm lp
EA Plan Discussion: 11:45 AM to 12:15 PM (LP)

  • Is the generic experimental model accurate? Representative?

  • Are site specific modes accurate?

  • Tune up details


Next steps 12 15 pm to 12 45 pm dm
Next Steps: 12:15 PM to 12:45 PM (DM)

  • Site Responsibilities (DM)

    • Status of Equipment and Software purchase

      • NEESPOP

      • Video Server (Linux box) + cameras + appliances

      • Local Storage Solutions

      • DAQ: Setup and LabVIEW 6.1 installation

    • Hardware Installation

    • Access to systems by SI team

    • Define Experimental Requirements

    • Define Experimental Procedures

    • Learn/Use Collaboration Tools


Si team responsibilities
SI Team Responsibilities

  • Installation and Configuration (12:30 to 12:45 PM)

    • NEESpop

      • Grid Services software

      • Data management tools

      • Support Software

    • Video Server (hardware and software) (NZ)

    • Local Storage Solutions (JF)

    • Data Acquisition Services (PH)

    • Collaboration Tools (EH, JL)

    • Support Issues (DM)