1 / 14

PBN Airspace Concept Workshop

PBN Airspace Concept Workshop. Review. Review of Workshop. 10 day PBN Airspace Design Workshop ICAO Doc 9992: PBN in Airspace Design Plan, Design, Validate, Implement 17 steps Integration of ICAO Doc 9931 & 9993: CDO and CCO ICAO Circ 330: Civil / Military Cooperation in ATM

lorna
Download Presentation

PBN Airspace Concept Workshop

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PBN Airspace ConceptWorkshop Review

  2. Review of Workshop • 10 day PBN Airspace Design Workshop • ICAO Doc 9992: PBN in Airspace Design • Plan, Design, Validate, Implement • 17 steps • Integration of ICAO Doc 9931 & 9993: CDO and CCO • ICAO Circ 330: Civil / Military Cooperation in ATM • Designed routes and TMA airspace “Centerville” • TMA design for Xian • Enroute design and multi-TMA integration practice • China

  3. ICAO Doc 9992 Online Course: http://www4.icao.int/learning/Home/Details/10

  4. PBN CHANGES – STATE LETTER ICAO State Letter SP 65/4-13/24 SUBJECT: Proposal for the amendment of PANS-OPS, Volumes I and II regarding procedure design criteria and charting requirements to support performance-based navigation (PBN) as well as helicopter point-in-space (PinS) approach and departure operations with consequential amendments to Annexes 4; 6, Parts I, II and III; 14, Volume II; 15 and the PANS-ABC

  5. Waypoints PBN Route Using Waypoints

  6. Path Terminators Altitude A Distance C DME distance D Fix F Next leg I Manual termination M Radial termination R Terminator Path Constant DME arc A C Course to D Direct Track F Course from a fix to Holding pattern H I Initial R Constant radius T Track between V Heading to

  7. Questions Asked PATH TERMINATOR CODING RULES REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5

  8. Questions Asked PATH TERMINATOR CODING RULES REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5

  9. PBN Implementation Processes

  10. Activity 1 • Safety • Capacity • Efficiency • Environment • Accessibility 1 - Operational Requirements in terms of:

  11. Discussion Points • Who benefits – keep current or change to new • Lowest common denominator? • Build it and they will come • Mixed mode is a common occurrence today • Ongoing and refresher training • Future improvements • Route spacing • Curved simultaneous approaches to multiple rwys • Structure of design process – iterations and final look

  12. Contact Information • Instructors: • morinj@iata.org • Walter.White@AirTraffic.biz • WalterW@iata.org • Jeffrey.Williams@Tetratech.com

  13. Good Practice • What can you do? • Separate climb / descent routes • Use direct route paths as much as possible • Design routes first and then airspace • Balance workload • RNAV 1 or RNP 1 • Simplify

  14. FINI

More Related